I. PAVEMENT STRUCTURE
Each activity considers: purchase, delivery and installation of inputs, components and materials, and the
requested quality controls, unless clearly stipulated differently.
A. PAVEMENT STRUCTURE
Preparation of weepholes
Work includes preparation of a thin layer of granular stone
A6 material as an extension of the pavement structure base m3 83.00 12.78 1,060.74
course, wide as emergency lane , on both sides of
carriageway . Granular stone material is placed in a layer,
TOTAL A: 297,614.32
RECAPITULATION
A. PAVEMENT STRUCTURE
No ITEM DESCRIPTION Total EUR
A PAVEMENT STRUCUTRE 297,614.32
TOTAL I: 297,614.32
BOSNIA I HERZEGOVINA
Construction of the BPC Bijaca LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 1
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 2 Construction of the BPC Bijaca , LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 3 Construction of the BPC Bijaca , LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
C. ROOF DRAINAGE
The specification includes works pertaining to execution of the installations within buildings, “up to 1 m” outside
each of the building engineering structures
TOTAL C: 168.72
RECAPITULATION
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 4 Construction of the BPC Bijaca , LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
III TRAFFIC
Note: In cases where certain equipment is specifically named, it is only an indication of the technical
features the offered equipment would need to comply with.
Each activity considers: purchase, delivery and installation of inputs, components and materials, and the
requested quality controls, unless clearly stipulated differently.
IIIa TRAFFIC
A. TRAFFIC SIGNS
No ITEM DESCRIPTION Unit Qty Unit Price Total
A.3 Traffic sign T=120 cm, other same as Item A.1. pc 5.00 58.80 294.00
A.6 Traffic sign 60x60 cm, other same as Item A.1. pc 3.00 35.79 107.37
A.7 Traffic sign 90x120 cm, other same as Item A.1. pc 2.00 81.81 163.62
A.10 Traffic sign 60x30 cm, other same as Item A.1. pc 3.00 20.45 61.35
A.11 Traffic sign 60x40 cm, other same as Item A.1. pc 1.00 25.56 25.56
A.19 Traffic sign160 x 120 cm, other same as Item A.17. pc 1.00 204.52 204.52
A.21 Traffic sign180 x 180 cm, other same as Item A.17. pc 2.00 347.68 695.36
TOTAL A: 4,051.09
TOTAL B: 33.66
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 5
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
D.2 Single-sided steel safety barrier (OS SSB), tested for class
H2 and working width class W=6 according to EN 1317,1-2. 34,668.40
m 565 61.36
TOTAL D: 34,668.40
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 6
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 7
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 8
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 9
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
pc 2 2,311.04 4,622.08
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 10
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
pc 2 3,797.88 7,595.76
F.16 Video-box on road route with special key, lock and cable
fastening systems. Supply, transport and installation of
video-box for mounting on gantry structure or cantilever
with installed equipement: 2x automatic circuit breaker 2A
C, RCCB, overvoltage protection 230V, 200-280V rms
single-phase with infomational panel about protection status
and deterioration, forseen place for optical modem and his
power supply modul and cassette for Fibre Optic cables.
pc 1 691.78 691.78
F.17 Video cubicle with special key, lock and cable fastening
systems. Supply, transport and installation of video cubicle
for mounting on pad footing with installed equipement: sa
ugrađenom opremom: 3x automatic circuit breaker 2A C, 1x
automatic circuit breaker 4A C, RCCB, overvoltage
protection 230V, 200-280V rms single-phase with
infomational panel about protection status and
deterioration, forseen place for optical modem and his
power supply modul, telemetric receiver, optical modems
housing and cassette for Fibre Optic cables.
pc 2 739.84 1,479.68
F.18 Supply, transport and installation of Optical Multimode
Transmitter for transmission of 1x video signal via one
multimode optical fibre, 9-bit digital linear PCM coding
without compression, optical budget 21dB on 850nm
wavelenght. Standalone device. Device working
temperature from -40ºC to +70ºC.
pc 2 1,768.56 3,537.12
F.19 Supply, transport and installation of Optical Multimode
Receiver for reception of 1x video signal thru one
multimode optical fibre, 9-bit digital linear PCM coding
without compression, optical budget 21dB on 850nm
wavelenght. Device forseen for mounting in housing.
Device working temperature from -40ºC to +70ºC.
pc 2 1,837.58 3,675.16
F.20 Supply, transport and installation of Optical Multimode
Receiver for reception of 3x video signals thru three
multimode optical fibres, 9-bit digital linear PCM coding
without compression, optical budget 21dB on 850nm
wavelenght. Device forseen for mounting in housing.
Device working temperature from -40ºC to +70ºC.
pc 1 1,642.78 1,642.78
F.23 Supply, transport and installation of device for coding and
transmission of 4x video signals. Possibility of reception
and coding of PAL video signal with MPEG-4 compression
algoritham in D1 format and one duplex data channel with
RS232/RS485 electrical compatibility. Output interface
RJ45 for transmission of singnal thru UTP cable.
Standalone device, complet with power supply module.
Device working temperature from -40ºC to +70ºC. Entry
includes device configuration, network settings with
inspection and testing.
pc 1 4,671.67 4,671.67
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 11
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
pc 2 650.01 1,300.02
F.26 Supply, transport and installation of ethernet media
converters. pc 2 125.01 250.02
F.27 Supply, transport and installation of standard optical
transmitter for transmission of ethernet signal through two
multimode optical fibres. pc 10 175.02 1,750.20
F.29 Supply, transport and installation of power supply devices
for flickering traffic lights. pc 10 255.65 2,556.50
TOTAL F: 130,819.55
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 12
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 13
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
TOTAL K: 11,167.24
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 14
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
TOTAL M: 75,494.80
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 15
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
RECAPITULATION
IIIb. TRAFFIC
No ITEM DESCRIPTION Total EUR
A. TRAFFIC SIGNS TOTAL 4,051.09
B. ROAD EQUIPEMENT TOTAL 33.66
C. TRAFFIC MARKINGS (HORIZONTAL SIGNS AND MARKINGS) TOTAL 3,734.01
D. SAFETY BARRIERS (GUARD RAILS) TOTAL 34,668.40
E. VARIABLE MESAGE SIGNS TOTAL 335,290.91
F. MEASURING AND CONTROL EQUIPMENT TOTAL 130,819.55
J. DUCTS FOR POWER AND SIGNAL CABLES TOTAL 23,761.77
IMPLEMENTATION WORKS AND MATERIAL FOR ELECTRICAL INSTALLATIONS
K. 11,167.24
TOTAL
IMPLEMENTATION WORKS AND MATERIAL FOR SIGNAL INSTALLATIONS
L. 11,237.93
TOTAL
M. LOAD BEARING STRUCTURES TOTAL 75,494.80
N. DOCUMENTATION AND TESTING TOTAL 1,687.25
TOTAL IIIa: 631,946.61
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 16
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
A.2
Error notice on local control panel and on remote central computer
of LED malfunction
Possibility of quick replacement of each malfunctioned LED and
other parts which are often subject of malfunction
Possibility of connectivity to payment system through serial
connection (RS-485) using TLS/FG4 protocol
Adjustable temperature control by means of thermostat and heater
in each sign
Adjustable light intensity control (1-100%) from GUI of control
program and in relation to surrounding environment light intensity.
Temperature operating range (-400C + 700C).
Electrical safety in accordance with HD 638 and HD 384
Electromagnetic accordance with EN50293:2000, section Road
traffic signal systems
TOTAL A: 1,607.45
B. WORKS
TOTAL B: 3,500.00
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca, LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 17
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
TOTAL C: 5,250.04
D. ELECTROINSTALATIONS
TOTAL C: 465.72
RECAPITULATION
IIIb. TRAFFIC INFORMATION SYSTEM
No ITEM DESCRIPTION Total EUR
C WORKS 5,250.04
D ELECTROINSTALATION 465.72
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca, LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 18
PHASE IV
LOT 7: section POČITELJ - BIJAČA
IVa ARCHITECTURAL
Note: In cases where certain equipment is specifically named, it is only an indication of the technical features
the offered equipment would need to comply with.
ARCHITECTURAL PHASE IV
1. STRUCTURE 1.1 - THE CENTRAL CANOPY
A. EARTHWORKS
GENERAL:
The unit price includes all basic and binding material, anchors,
labour, tools, transport, various types of protection etc.
D1 Installation of steel columns
Installation of steel columns executed in ø 508/16mm and ø
406.4/10mm steel sections.
Calculation per piece of ø 508/16mm section installed. pcs 4.00 2259.91 9,039.64
Calculation per piece of ø 406.4/10mm section installed. pcs 4.00 1273.12 5,092.48
TOTAL D: 14,132.12
E. CARPENTRY WORKS
No ITEM DESCRIPTION Unit Qty Unit Price Total EUR
GENERAL:
Concrete and reinforced concrete works related formwork is
included in the concrete and reinforced concrete works.
E1 Supply, manufacturing and removal of scaffolding 0.00
Supply, assembly and dismantling of the scaffolding after
completion of all the works, and removal of the steel and timber
scaffolding for masonry, carpentry, metal and painting works.
The scaffolding shall be approx. 9.00 m tall.
It pertains to the works carried out in high spaces.
Calculation per m2 of scaffolding installed. m2 2,556.00 2.05 5,239.80
Supply, manufacturing and removal of painting works
E2
scaffolding
All as item 5.1, except mobile scaffolding for execution of the
painting works.
Calculation per scaffolding piece. pcs 1.00 255.65 255.65
5,495.45
F. STEEL STRUCTURE
No ITEM DESCRIPTION Unit Qty Unit Price Total EUR
F1 Elements of the central canopy steel structure 0.00
The central canopy shall be executed above border customs and
police control area of Bijača Border Crossing (The main border
customs and police building, border customs and police building,
prefabricated booths for customs and police control, customs
inspection and vehicle scales).
Manufacturing, supply and installation of the central canopy.
Covering the ridge using metal sheet identical to the cover metal
sheet, 0.6 mm thick, except with flat sheet metal with no moulding.
Developed width of the sheet metal is 30 cm.
The unit price includes supply and insertion of bituminised rubber
foam seals into indentations of the cover sheet metal curvatures
and cutting the ridge sheet metal to fit the cover.
Calculation per m' of roof ridge covered m 65.00 8.59 558.35
TOTAL G: 78,179.75
Likewise, the unit price shall include supply and installation roofing
paper strip on all areas of contact of the zinc coated sheet metal
and concrete or other material, while in places of direct contact with
other types of metal, plastic soft band shall be inserted.
GENERAL:
Iron metal works products consist of non-processed and cold
formed drawn sections.
All frames have anchoring claws, and all joints are welded.
Prior to installation, the metal products shall be cleaned of rust by
sandblasting and degreased, and two coats of epoxy-based paint
as corrosion protection shall be applied.
I1 Manufacturing and installation of walkway railing 0.00
Manufacturing, supply and installation of railing on the walkways.
The railing shall be executed in compliance with the design.
The unit price includes sealing of a 150 mm tall parapet using
aluminium sheet and connecting material as well as cleaning of
rust using sandblasting and double corrosion protection using
epoxy based paint.
Calculation per m' of executed railing. m 488.00 28.12 13,722.56
I2 Steel step irons in the drainage shafts 0.00
Manufacturing and supply to the construction site and installation of
steel step irons in the drainage shafts.
The price shall include measure taking in situ, supply of the basic
and connecting materials, workshop manufacturing, transportation
and installation at the construction site, working scaffolding,
elements connecting it to
the substructure and all other accessories required for installation
of flat polycarbonate plates.
Size and installation details shall be in compliance with the working
design.
Dry assembling using standardized metal sections, using sealing
strips or silicone sealants.
Installation of seals of ± 65 Shore hardness.
Design shall allow sufficient space for expansion of the plates
occurring due to thermal expansion, in order to avoid deformations.
Thermal expansion is approx. 3mm/m'.
The contractor is required to execute a protective cover in a
polyethylene or similar foil after installation and removal of the
protective foil, as a protection from paint and other coating spray.
Calculation per m². m2 133.00 76.69 10,199.77
TOTAL J: 10,199.77
K. PAINTING WORKS
No ITEM DESCRIPTION Unit Qty Unit Price Total EUR
K1 Surcharge for painting of the steel structure
Surcharge for two coats of additional paint of the canopy steel
structure columns base using black paint, resistant to weather
effects, salt and fuel.
Executed approx. 50 cm high.
Calculation per m2 of painted surface. m2 26.00 13.29 345.54
TOTAL K: 345.54
L. OTHER
No ITEM DESCRIPTION Unit Qty Unit Price Total EUR
L1 Execution of technical documents set 1 511.29 511.29
TOTAL L: 511.29
RECAPITULATION
No ITEM DESCRIPTION Total EUR
A. EARTHWORKS 563.22
B. CONCRETE AND REINFORCED CONCRETE WORKS 25,556.24
C. REINFORCEMENT STEEL BENDING WORKS 18,140.10
D. MASONRY WORKS 14,132.12
E. CARPENTRY WORKS 5,495.45
F. STEEL STRUCTURE 49,950.00
The item comprises all works related to staking out of the structure
including installations; all design to site (and vice versa) data
transfer measurements; setup and maintenance of markers and
F. PREFABRICATED BOOTH
No ITEM DESCRIPTION Unit Qty Unit Price Total EUR
F1 Toll booth 235/230/310 cm
A booth is executed as a prefabricated kiosk in the workshop until
fully completed with anchoring screws embedded in the upper part
of the posts, to be lifted by a truck crane and positioned on its
foundation.
After the assembly, the anchoring screws are removed and holes
left over are closed using decorative studs.
Calculation per completely cleaned structure and its surroundings. 1 10.23 10.23
set
TOTAL H: 112.49
RECAPITULATION
No ITEM DESCRIPTION Total EUR
A. SITE PREPARATION AND EARTHWORKS 125.05
B. CONCRETE AND REINFORCED CONCRETE WORKS 1,325.99
C. REINFORCEMENT STEEL BENDING WORKS 910.80
D. PAINTING WORKS 123.75
E. IRON METAL WORKS 135.50
E. PREFABRICATED BOOTH 5,767.37
F. SUNLIGHT PROTECTION 140.60
G. OTHER 112.49
TOTAL 2: 8,641.55
NOTE: The bill of quantities for heading 2 is executed for one structure. Please note there are
four (4) identical structures in lot 4. Therefore, the total number of the structures is calculated
in the below "Total recapitulation (all buildings)", in the total for the respective heading.
The item comprises all works related to staking out of the structure
including installations; all design to site (and vice versa) data
transfer measurements; setup and maintenance of markers and
The unit price includes all basic and binding material, anchors,
labour, tools, transport, scaffolding, various types of protection etc.
The unit price shall include anchoring of the outer walls using 8 mm
diameter concrete steel using 2 anchors in every second row.
Likewise, the unit price shall include supply and installation roofing
paper strip on all areas of contact of the zinc coated sheet metal
and concrete or other material, while in places of direct contact with
other types of metal, plastic soft band shall be inserted.
A drip edge shall be executed along with the gutter, around the
reinforced concrete channel, in sheet metal, as well as the top
cover, while zinc coated sheet metal shall be slipped 50 cm deep.
The unit price shall include supply of basic material and fixtures,
measure taking in situ, workshop manufacturing,
L. STONEWORK
No ITEM DESCRIPTION Unit Qty Unit Price Total EUR
L1 External and internal window sills
Supply and installation artificial or natural stone window sills using
cement mortar.
The minimum length of the sill is width of the window plus 2 cm, i.e.
at least 62cm and 122cm.
The sills must be placed strictly horizontally viewed along their
length, with a transversal grade of 10 %.
Undersides of the sills must have a groove along the length to
prevent backflow of water.
After installation, the sills contact to the nonferrous metal works
need be cleaned and sealed with two-component permanently
elastic putty for exterior works.
The unit price shall include supply of the window sill with the drip
edge and polished exposed
The surfaces should be ground after the putty dries up, and the first
coat of paint should be applied.
After the first coat of paint dries up, repeat application of putty over
any remaining uneven areas.
Subsequently, repeat grinding process and then apply the second
coat of paint.
The last coat of paint shall be executed in glossy paint, while the
paint colour shall be determined by the design engineer.
Leafs/sashes shall be sprayed using paint (Neolin) outlining growth
rings after the protective permeable nitro paint is applied.
The price includes all required auxiliary material.
Calculation per m² of painted joinery. m2 13.00 6.65 86.45
TOTAL N: 485.41
Calculation per completely cleaned structure and its surroundings. set 1 51.13 51.13
TOTAL R: 306.78
RECAPITULATION
No ITEM DESCRIPTION Total EUR
A. SITE PREPARATION AND EARTHWORKS 233.89
B. CONCRETE AND REINFORCED CONCRETE WORKS 7,155.19
C. REINFORCEMENT STEEL BENDING WORKS 2,323.92
D. MASONRY WORKS 2,451.56
E. INSULATION WORKS 2,096.27
F. CARPENTRY WORKS 1,284.15
G. SHEET METAL WORKS 828.58
H. ROOFING WORKS 1,990.52
I. JOINERY WORKS 785.35
J. IRON METAL WORKS 143.16
K. NONFERROUS METAL WORKS 7,728.22
L. STONEWORK 701.28
M. FLOOR AND WALL TILING 1,514.64
N. PAINTING WORKS 485.41
O. EXTERNAL PLASTERING WORKS 16,429.00
P. SUNLIGHT PROTECTION 316.66
R. OTHER 306.78
TOTAL 3: 46,774.58
D. MASONRY WORKS
The unit price includes all basic and binding material, anchors,
labour, tools, transport, scaffolding, various types of protection etc.
The unit price shall include anchoring of the outer and inner walls
using 8 mm diameter concrete steel using 2 anchors in every
second row.
Anchoring holes shall be drilled to 12 mm diameter at a 15° angle
for at least 150 mm.
The holes shall be dusted and moistened, filled with Tricosal
sealing mortar and an anchor shall be placed.
Overall length of the anchors is 55 cm.
Load bearing and partition wall also need be bound by brickwork
bonding.
Closing up performed after ducts and wires are laid (plastering
grooves, gutters etc.) shall not be charged separately.
D1 External wall construction 0.00
Supply of materials and construction of 30 cm thick outer walls
using POROTHERM type 30 S PLUS or corresponding brick,
brickwork height up to 4.50 m.
The works shall be performed using cement-lime mortar M-100.
The unit price shall include supply of the bricks, bricklaying with
100% sealed with mortar, preparation of the mortar, all internal
transports, curing during and after the works.
Bricklaying scaffolding is included in carpentry works.
The walls shall be executed with 2 faces.
Calculation per m³ m³ 43.00 69.02 2,967.86
D2 Construction of internal walls 0.00
Supply of materials and construction of 20 cm thick internal walls
using POROTHERM type 20-50 PROFI or corresponding brick,
brickwork height up to 4.00 m.
The works shall be performed using cement-lime mortar M-100.
The unit price shall include supply of the bricks, bricklaying with
100% sealed with mortar, preparation of the mortar, all internal
transports, curing during and after the works.
Bricklaying scaffolding is included in carpentry works. 0.00
Calculation per m³ m³ 5.00 71.07 355.35
TOTAL D: 6,180.38
Calculation per m' of actually executed drip edge. m' 50.00 9.82 491.00
Calculation per m' of actually executed flashing. m' 47.00 9.66 454.02
TOTAL G: 1,618.22
The unit price shall include supply of basic material and fixtures,
measure taking in situ, workshop manufacturing,
delivery to the site, fitting and adjustments in situ and after
installation, supply and installation of metal fittings as selected by
the design engineer with cylinder locks and keys and all the
trimmings.
Everything else according to metal works schematic layout and
directions of the supervising engineer and the design engineer.
Apart from the aforementioned, the unit price shall include
execution of workshop documents and submission of the
documents for review and approval of the design engineer.
Steel sections used for anchoring the aluminium partitions have at
least two coats of paint for protection.
Apart from the aforementioned, the unit price shall include
execution of workshop documents and submission of the
documents for review and approval of the design engineer.
Steel sections used for anchoring the aluminium partitions have at
least two coats of paint for protection.
Aluminium sheet and section fixing anchors shall be executed in
stainless steel.
Screws and other fixing material shall be executed in stainless
steel, aluminium or other anticorrosive material.
Corner pieces must be executed impeccably.
Areas which are especially sensitive to loss of impermeability must
be sealed using two-component putty of appropriate quality.
Doors and those windows that open must have rubber seals at the
edges.
All external doors must have built-in closers.
THERMOPLUS and OPTIFLOAT glass 4+16+4 mm insulation
glazing must be used for window glazing so that the thermal
conductivity coefficient is 1.6 W/m2K, while door glazing shall be
LAMISTAL 3+3+12+ LAMISTAL 3+3 insulation glazing.
The minimum length of the sill is width of the window plus 2 cm, i.e.
at least 62cm and 122cm.
The sills must be placed strictly horizontally viewed along their
length, with a transversal grade of 10 %.
Undersides of the sills must have a groove along the length to
prevent backflow of water.
After installation, the sills contact to the nonferrous metal works
need be cleaned and sealed with two-component permanently
elastic putty for exterior works.
The unit price shall include supply of the window sill with the drip
edge and polished exposed
surfaces, cement mortar and preparation of the surface it is applied
to, cleaning and sealing of the NF metal works joints, protection of
the sill and all other operations required for installation.
The surfaces should be ground after the putty dries up, and the first
coat of paint should be applied.
After the first coat of paint dries up, repeat application of putty over
any remaining uneven areas.
Subsequently, repeat grinding process and then apply the second
coat of paint.
The last coat of paint shall be executed in glossy paint, while the
paint colour shall be determined by the design engineer.
Leafs/sashes shall be sprayed using paint (Neolin) outlining growth
rings after the protective permeable nitro paint is applied.
The price includes all required auxiliary material.
Calculation per m² of painted joinery. m² 80.00 6.65 532.00
TOTAL N: 830.42
P. SUNLIGHT PROTECTION
No ITEM DESCRIPTION Unit Qty Unit Price Total EUR
P1 Aluminium laminas 0.00
Supply and installation of internal painted aluminium movable
laminas that may be drawn up or down.
Aluminium lamellas shall be executed at all sanitary facilities
premises windows.
The unit price shall include all basic and fixing material, top
trimming and operating strings.
Type and colour of movable aluminium laminas shall be determined
by the design engineer.
Calculation per piece of actually installed laminas.
a) 120x60cm size window. Position 2 pcs 15 14.06 210.90
b) 60x60cm size window. Position 3 pcs 4 14.06 56.24
TOTAL P: 267.14
R. OTHER
No ITEM DESCRIPTION Unit Qty Unit Price Total EUR
R1 Execution of technical documents set 1 255.65 255.65
Execution of technical documentation of as-built situation with
complete operating and maintenance instruction, submission to the
client (in 6 copies). The item pertains to the entire TCMC.
R2 Detailed final cleaning 0.00
Cleaning of the structure and its surrounding, removal of debris
and waste to a stockpile. Detailed final cleaning of floors, tiling etc.
The unit price includes all basic and binding material, anchors,
labour, tools, transport, scaffolding, various types of protection etc.
The unit price shall include anchoring of the outer walls using 8 mm
diameter concrete steel using 2 anchors in every second row.
Likewise, the unit price shall include supply and installation roofing
paper strip on all areas of contact of the zinc coated sheet metal
and concrete or other material, while in places of direct contact with
other types of metal, plastic soft band shall be inserted.
GENERAL:
All the works must be performed skilfully and properly, with
appropriate quality material which must conform to existing
regulations and norms.
Prior to commencement of the works related to manufacturing on
nonferrous metal works, the contractor is required to inspect the
construction works completed, and if shortcomings which may
present an impediment are observed, that must be communicated
to the construction works contractor
in order to have the latter remove them.
All aluminium sections and products must be executed in high
quality and properly.
Contractor of these works is required to protect the works
performed by other contractors to prevent any damage occurring
due to performance of the works.
The contractor is also required to protect all the works from dirt,
and after completion of the works, the contractor is required to
remove all excess material and waste from the construction site.
Aluminium sections with a thermal break corresponding to
SCHUECO INTERNATIONAL type shall be used to execute the
nonferrous metal works.
The aluminium sections shall be executed in aluminium alloy Al Mg
Si 0.5, F220 strength up to 260 N/mm2.
The minimum thickness of the protective layer shall be 18 to 25
microns, and must comply with HRN.C.T7.234, 236, 226 and 228.
The unit price shall include supply of basic material and fixtures,
measure taking in situ, workshop manufacturing,
delivery to the site, fitting and adjustments in situ and after
installation, supply and installation of metal fittings as selected by
the design engineer with cylinder locks and keys and all the
trimmings.
Everything else according to metal works schematic layout and
directions of the supervising engineer and the design engineer.
Apart from the aforementioned, the unit price shall include
execution of workshop documents and submission of the
documents for review and approval of the design engineer.
Steel sections used for anchoring the aluminium partitions have at
least two coats of paint for protection.
Apart from the aforementioned, the unit price shall include
execution of workshop documents and submission of the
documents for review and approval of the design engineer.
Steel sections used for anchoring the aluminium partitions have at
least two coats of paint for protection.
Aluminium sheet and section fixing anchors shall be executed in
stainless steel.
Screws and other fixing material shall be executed in stainless
steel, aluminium or other anticorrosive material.
Corner pieces must be executed impeccably.
Areas which are especially sensitive to loss of impermeability must
be sealed using two-component putty of appropriate quality.
Doors and those windows that open must have rubber seals at the
edges.
All external doors must have built-in closers.
THERMOPLUS and OPTIFLOAT glass 4+16+4 mm insulation
glazing must be used for window glazing so that the thermal
conductivity coefficient is 1.6 W/m2K, while door glazing shall be
LAMISTAL 3+3+12+ LAMISTAL 3+3 insulation glazing.
Proper plastic elements shall be used to install the insulation
glazing.
GENERAL:
All floor and wall tiling are designed to be executed in the 1st class
ceramic tiles, 30 x 30 or 20 x 20 cm size, ground or rough top
surface in colour to be determined by the design engineer in
agreement with the client.
At joints of tiled floors and plastered walls a 10 cm tall socle shall
be executed in the same ceramic tiles.
Wall ceramic tiles shall be placed using appropriate adhesive onto
lime-cement mortar plastered walls.
In smaller premises (sanitary facilities etc.) 20 x 20 cm tiles shall
be used for floors and walls (of same quality, colour and production
lot).
Tiling system shall always be joint to joint, while the joint width shall
be agreed with the design engineer.
Floor ceramic tiles are laid in cement mortar or glued onto prepared
cement glazing using construction adhesive.
The unit price shall include supply of the basic and binding
material, laying and tuck pointing of the ceramic tiles using ready-
made mixture as selected by the design engineer, supply and
installation
of PVC, Al, brass or chrome plated angle and cap trimming,
cleaning of the floors and the walls and all transportation.
The structure is divided into 7 zones according to drawing 02-03
and 02-04 ground floor plan. The zones are assigned colours which
apply to the ceramic tiles, all in agreement with the design engineer
or the client.
The surfaces should be ground after the putty dries up, and the first
coat of paint should be applied.
After the first coat of paint dries up, repeat application of putty over
any remaining uneven areas.
Subsequently, repeat grinding process and then apply the second
coat of paint.
The last coat of paint shall be executed in glossy paint, while the
paint colour shall be determined by the design engineer.
Leafs/sashes shall be sprayed using paint (Neolin) outlining growth
rings after the protective permeable nitro paint is applied.
The price includes all required auxiliary material.
Calculation per m² of painted joinery. m² 90.00 6.65 598.50
TOTAL N: 608.21
R. OTHER
Calculation per completely cleaned structure and its surroundings. 1.00 51.13 51.13
set
TOTAL R: 306.78
RECAPITULATION
No ITEM DESCRIPTION Total EUR
A. SITE PREPARATION AND EARTHWORKS 243.04
B. CONCRETE AND REINFORCED CONCRETE WORKS 7,819.12
C. REINFORCEMENT STEEL BENDING WORKS 2,703.42
D. MASONRY WORKS 5,231.22
E. INSULATION WORKS 1,870.09
F. CARPENTRY WORKS 1,563.83
G. SHEET METAL WORKS 1,528.89
H. ROOFING WORKS 3,642.41
I. JOINERY WORKS 4,376.71
J. IRON METAL WORKS 756.27
K. NONFERROUS METAL WORKS 4,642.48
L. STONEWORK 847.59
M. FLOOR AND WALL TILING 4,232.16
N. PAINTING WORKS 608.21
O. EXTERNAL PLASTERING WORKS 2,943.70
P. SUNLIGHT PROTECTION 253.08
R. OTHER 306.78
TOTAL 5: 43,569.00
TOTAL RECAPITULATION (BUILDINGS 1.1, 2.4,Type 3, 2.7, 2.8 & 2.9)
No ITEM DESCRIPTION Total EUR
1. STRUCTURE 1.1 - THE CENTRAL CANOPY 245,312.22
2. STRUCTURE 2.4. FREIGHT VEHICLE EXIT CONTROL, TYPE 3 34,566.19
3. STRUCTURE 2.7 - BORDER CUSTOMS AND POLICE BUILDING 46,774.58
4. STRUCTURE 2.8. SANITARY AND WATER FACILITIES FOR MEN & WOMEN 50,611.58
5. STRUCTURE 2.9. SANITARY AND WATER FACILITIES FOR MEN & JANITOR 43,569.00
TOTAL IVa: 420,833.57
NOTE: The price for each item of this bill of rates has to comprise supply, installation,connecting and putting the
item into the condition of full function. The price has comprise the cost of all connecting, installation supporting
and other material reqired for teh full function of particular item. During the preparation of the offer, the latest
valid regulations for the particular installations should be followed. For all potential remarks related to the
execution of works, bill of quantities, submission of bid Designer should be contacted. Controlor has to bear the
cost of transport, installation and equipment errection together with complete building/construction assistence,
and a offer all works in unit price of this bill.
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 92 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
TOTAL A: 631.00
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 93 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 94 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 95 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
RECAPITULATION
1. EARTH WORKS; CABLE CONDUIT
No ITEM DESCRIPTION Total EUR
A EARTH WORKS: CABLE CONDUIT 631.00
B EARTH WORKS FOR TC CONDUITS 760.00
C LOW TENSION CABLES CONDUTS 3,151.57
D TC (TELECOMMUNICATION) CABLE CONDUITS 6,299.83
TOTAL 1: 10,842.40
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 96 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
from GR(1.7) to distributors R1, R4, R3B, R(2.7) m 130 8.00 1,040.00
PP00-Y 5x16mm2
from GR(1.7) to distributors R1B, R2B, RB(2.7)
m 130 5.50 715.00
PP00-Y 5x10mm2
Supply, mounting, building into the wall and connecting wall
plastic cabinet R(2.7) with nontransparant doors type
Pragma, 2 rows x 24 modules, complete with all required
mounting and connecting accessory comprising the
following (pcs 1)
MICRO SWITCH C60N 3P 32A C (pcs 1)
VOLTAGE TRIGGER MX-OF 220-240V 50Hz (pcs1)
MICRO SWITCH C60N 1P 6A C (pcs 1)
MICRO SWITCH C60N 1P 10A C (pcs 3)
MICRO SWITCH C60N 1P 16A C (pcs 10)
A2 set 1 750.00 750.00
DIFFERENTIAL PROTECTIVE SWITCH ID 4P 25A
30mA KL. AC (pcs 1)
All complete with line clips, bus bars, cable insertion pieces,
connecting conduits P/F corresponding cross section of
corresponding cross section and insulation colour, name
plates and warning plates, other small items and connecting
accessory. Accessible parts under voltage to be covered by
insulation plate. Documentation folder to be attached. The
price comprises all required works and material.
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 97 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 98 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 99 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 100 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 101 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
TOTAL D: 789.10
RECAPITULATION
2. THE MAIN BUILDING OF BORDER POLICE AND CUSTOM
No ITEM DESCRIPTION Total EUR
A ELECTRICAL WIRING FOR LIGHTING, SOCKET AND OTHER CONSUMERS 4,902.56
B TELEPHONE AND COMPUTER INSTALATION 24,110.00
C FIRE ALARM INSTALATION 2,061.00
D LIGHTNING PROTECTION INSTALATION AND POTENTIAL EQUALIZATION 789.10
TOTAL 2: 31,862.66
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 102 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
3. MAIN SHED
Each activity considers: purchase, delivery and installation of inputs, components and materials, and the
requested quality controls, unless clearly stipulated differently.
A. ELECTRICAL WIRING FOR LIGHTING, SOCKET AND OTHER CONSUMERS
No ITEM DESCRIPTION Unit Qty Unit Price Total EUR
Supply and laying of power cables from Rcn1/RcnB1 i
Rcn2 in previously layed pipes in cable trench and along
cable racks, complete with making cable endings and
connections, with all necessary assembling and connecting
accessory,connecting material, insertion tubes and sealing
elements for the laying the cable through the foundation.
A1 The price comprises all required works and material.
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 103 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
TOTAL B: 2,880.00
RECAPITULATION
3. MAIN SHED
No ITEM DESCRIPTION Total EUR
A ELECTRICAL WIRING FOR LIGHTING, SOCKET AND OTHER CONSUMERS 4,933.50
B LIGHTNING PROTECTION INSTALATION AND POTENTIAL EQUALIZATION 2,880.00
TOTAL 3: 7,813.50
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 104 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 105 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 106 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
RECAPITULATION
4. CONTROL CABIN TYPE 3
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 107 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 108 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 109 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 110 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 111 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
TOTAL C: 857.60
RECAPITULATION
5. SANITARY FACILITIES M+W
No ITEM DESCRIPTION Total EUR
A ELECTRICAL WIRING FOR LIGHTING, SOCKET AND OTHER CONSUMERS 5,492.69
B FIRE ALARM INSTALATION 311.00
C LIGHTNING PROTECTION INSTALATION AND POTENTIAL EQUALIZATION 857.60
TOTAL 5: 6,661.29
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 112 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 113 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 114 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 115 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
TOTAL C: 805.30
RECAPITULATION
6. SANITARY FACILITIES M+ CLEANING LADY
No ITEM DESCRIPTION Total EUR
A ELECTRICAL WIRING FOR LIGHTING, SOCKET AND OTHER CONSUMERS 4,392.00
B FIRE ALARM INSTALATION 193.50
C LIGHTNING PROTECTION INSTALATION AND POTENTIAL EQUALIZATION 805.30
TOTAL 6: 5,390.80
7. LOW TENSION CONNECTION AND ELECTRIC POWER WIRING; GRO, RKo, KPO
DISTRIBUTORS
Each activity considers: purchase, delivery and installation of inputs, components and materials, and the
requested quality controls, unless clearly stipulated differently.
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 116 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
TOTAL B: 550.00
RECAPITULATION
7. LOW TENSION CONNECTION AND ELECTRIC POWER WIRING; GRO, RKo, KPO
DISTRIBUTORS
No ITEM DESCRIPTION Total EUR
A LOW TENSION CONNECTION AND ELECTRIC POWER WIRING 1,572.50
B GRO, RKo, KPO DISTRIBUTORS 550.00
TOTAL 7: 2,122.50
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 117 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
TOTAL A: 1,500.00
RECAPITULATION
BOSNIA I HERZEGOVINA
"CORRIDOR Vc MOTORWAY PROJECT" Page 118 Construction of the BCP Bijaca, LOT III, PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
IVc HVAC
Note: In cases where certain equipment is specifically named, it is only an indication of the technical
features the offered equipment would need to comply with.
1. LPG INSTALLATION
Each activity considers: purchase, delivery and installation of inputs, components and materials, and the
requested quality controls, unless clearly stipulated differently.
Each point in this cost estimate must include the supply, assembly, connecting, balancing and calibration, and
delivery of the item in a fully functional state, by being put into operation by the contractor or licensed
maintenance company, depending on the type of equipment. The item has to include the estimate of all
connecting, assembly, retaining and other material required for full functioning of the respective item, drilling of
openings in the wall and floor and their subsequent rehabilitation. When preparing the tender, the valid
regulations for certain types of installations have to be taken into account. The contractor shall bear the costs of
all transport, installation and assembly of the equipment, including all construction assistance and providing of
materials, and all the works in the cost estimate shall be quoted per unit prices.
A. LPG INSTALLATION
Supply, transport and installation of the following
equipment and material:
Unit Price
No. DESCRIPTION Unit Quantity Total EURO
EURO
Gas connection for the objects: 2.8, 2.9.
connection pipe, PEHD in compliance with the standard
ISO 4437, SDR 11; d63x5,8
PEHD electro-fusion reducer d63/d32
bushing PEHD/steel d32/DN25 (Ø33,7x3,25) - 1 piece
steel pipe NO25 (Ø33,7x3,25)-2m
casing pipe NO50x3,65-1.5m
pipe elbow 90° NO25
A.1 reducer DN25/NO20 set 2.00 336.94 673.88
gas ball valve with threaded connection DN20 PN4
coupling DN20
dirt trap DN20; PN4
detachable joint DN20
sheet metal cabinet 400x 600x 200
warning labels: prohibited use of sparking tools, fire
hazard, smoking prohibited
Calculation for the set
PEHD pipes
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 119
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
Unit Price
No. DESCRIPTION Unit Quantity Total EURO
EURO
Yellow PVC strip for marking the gas pipeline with the sign
A.7 "POZOR PLIN", also containing the copper detection m 200.00 0.26 52.00
conductor for installation above the gas pipeline
Steel pipes
Supply and installation of the steel seamless pipes made of
Č.12.12, DIN 2441, with ends to be welded on site,
mechanical cleaning and corrosion protection.
Steel elbows, T-pieces, reducers and similar, with the ends
A.8 prepared for welding, which have been
Calculation per metre.
DN 15 , Ø21,3 X 2,65 m 6.00 14.83 88.98
DN 20 , Ø26,9 X 2,65 m 3.00 15.85 47.55
DN 25 , Ø33,7 X 3,25 m 6.00 17.90 107.40
Gas ball valve
Gas ball valve, in compliance with DIN 3357/1 and DIN
A.9
3230/2, PN4, with a union fitting and gaskets
dimension DN 15 pcs. 2.00 18.41 36.82
TOTAL for LPG INSTALLATIONS: 5,166.78
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 120
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
RECAPITULATION
1. LPG INSTALLATION
No. DESCRIPTION Total
A LPG INSTALLATION 5,166.78
B PRELIMINARY WORKS AND EARTHWORKS 854.60
TOTAL 1: 6,021.38
2. OBJECTS 2.7. ( BORDER CUSTOMS AND POLICE BUILDING), and 2.4. (CONTROL BOOTHS)
Each activity considers: purchase, delivery and installation of inputs, components and materials, and the
requested quality controls, unless clearly stipulated differently.
A. HEATING, AIR-CONDITIONING AND VENTILATION
Supply, transport and installation of the following
equipment and material:
Unit Price
No. DESCRIPTION Unit Quantity Total EURO
EURO
Panel radiators
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 121
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
Unit Price
No. DESCRIPTION Unit Quantity Total EURO
EURO
Fan coil unit with mixing air streams
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 122
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
A.11 Type such as: Daikin FTXS25G pcs. 1 set 1.00 898.34 898.34
External unit:
Electrical connection: ~230/1/50
Dimensions (l*h*w): 765*550*285 mm
Mass: 34 kg
Type such as: Daikin RXS25G pcs. 1
RECAPITULATION
2. OBJECTS 2.7. ( BORDER CUSTOMS AND POLICE BUILDING), and 2.4. (CONTROL BOOTHS)
No. DESCRIPTION Total
A HEATING; DHW; AIR-CONDITIONING AND VENTILATION 23,635.20
TOTAL 2: 23,635.20
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 123
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
A.3 The tank has the following characteristics: set 1.00 775.63 775.63
Tank volume: V (litres): 160
Permanent effect at 70/50°C: Q (kW): 25
Type such as: Viessmann Vitocell 100-W (CVA)
Dimensions: Ø581mm, H=1189mm
Calculation for the set.
DHW expansion vessel
Membrane flow ("flowfresh") expansion vessel, volume 12
litres, maximum permissible pressure 10 bars. All metal
parts in contact with the water are made of stainless steel,
A.4 with butyl bellows in compliance with protočna DIN 4807 set 1.00 115.04 115.04
T3
Connections: 2 x R 1/2"
Type such as: Pneumatex Aquapresso ADF. 12.10
Calculation for the set.
Safety group for DHW, in compliance with DIN 1988,
consisting of a block valve, check valve, diaphragm safety
valve and connection for the pressure gauge, for tanks up
A.5 to 200 litres capcaity, DN15/R3/4", 10 bars set 1.00 119.64 119.64
Type such as: Viessmann
Calculation for the set.
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 124
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
Unit Price
No. DESCRIPTION Unit Quantity Total EURO
EURO
DHW circulation pump
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 125
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
Unit Price
No. DESCRIPTION Unit Quantity Total EURO
EURO
Pre-insulated pipes for underfloor distribution from the
distribution cabinets to the radiators
RECAPITULATION
3. OBJECT 2.8. (SANITARY FACILITY)
No. DESCRIPTION Total
A HEATING AND DHW 5,518.40
TOTAL 3: 5,518.40
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 126
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
A.3 The tank has the following characteristics: : set 1.00 794.55 794.55
Tank volume: V (litres): 200
Permanent effect at 70/50°C: Q (kW): 25
Type such as: Viessmann Vitocell 100-W (CVA)
Dimensions: Ø581mm, H=1409mm
Calculation for the set .
DHW expansion vessel
Membrane flow ("flowfresh") expansion vessel, volume 12
litres, maximum permissible pressure 10 bars. All metal
parts in contact with the water are made of stainless steel,
A.4 with butyl bellows in compliance with DIN 4807 T3 set 1.00 115.04 115.04
Connections: 2 x R 1/2"
Type such as: Pneumatex Aquapresso ADF. 12.10
Calculation for the set .
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 127
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
Unit Price
No. DESCRIPTION Unit Quantity Total EURO
EURO
Safety group for DHW, in compliance with DIN 1988,
consisting of a block valve, check valve, diaphragm safety
valve and connection for the pressure gauge, for tanks up
A.5 to 200 litres capacity, DN15/R3/4", 10 bars set 1.00 119.64 119.64
Type such as: Viessmann
Calculation for the set .
DHW circulation pump
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 128
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
Unit Price
No. DESCRIPTION Unit Quantity Total EURO
EURO
Pre-insulated pipes for underfloor distribution from the
distribution cabinets to the radiators
RECAPITULATION
4. OBJECT 2.9. (SANITARY FACILITY)
No. DESCRIPTION Total
A HEATING AND DHW 5,457.57
TOTAL 4: 5,457.57
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 129
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
Unit Price
No. Item Description Unit Qty Total Euro
Euro
A1 Polyethylene PE-100 water supply pipes.
Supply and installation of PE-100 polyethylene water supply pipes
of 10 bar operating pressure, for execution of water supply network.
The pipes should conform to EN 12201, ISO 4437, DIN 8074/75
requirements.
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 130
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
TOTAL A 162.82
B. DRAINAGE INSTALLATIONS
Unit Price
No. Item Description Unit Qty Total Euro
Euro
B1 Internal sewer PVC pipes
Procurement, supply and installation of internal sewer PVC pipes
and fittings with couplings. The sewer pipes shall be sealed using
rubber ring seals.
The fittings shall be calculated as a linear metre of the sewer pipe,
with all required accessories, and completely in compliance with
HRN G.C6.512.
The price for m1 finished work.
DN 110 m' 4.00 8.69 34.76
DN 50 m' 9.00 4.09 36.81
PVC ventilation cap
Supply and installation of a PVC ventilation cap to be installed onto
B2 the vertical vent.
DN 50 pcs 1.00 29.65 29.65
The price for 1 piece finished work.
Water impermeability testing
Testing of the entire sewer installation in terms of water
B3 impermeability using 500 mbar static overpressure applied during
30 minutes, all in compliance with EN 1610
The price for 1 piece finished work. pcs 1.00 118.11 118.11
Toilet bowl
Supply and installation of a toilet bowl executed in the 1st class
C2 majolica (vitreous china), white, entirely functional with a solid
plastic lid and seat, toilet cistern (low mounted) connecting to an
angle valve and a floor drain.
The price for 1 piece finished work. pcs 1.00 93.06 93.06
Urinal
Supply and installation of the 1st class majolica (vitreous china)
urinal, white, completely functional execution with a flush valve and
C3 a nickel plated Ø32 mm siphon; sealing and fixing accessories; Ø15
mm cold water supply fixtures.
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 131
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
Unit Price
No. Item Description Unit Qty Total Euro
Euro
Wall mirror
Procurement, supply and installation of a wall mirror, 600 x 400 mm
C5 size, 4 mm thick, with grinded edges and all fixing accessories.
TOTAL C 463.25
RECAPITULATION
2.7. BORDER CUSTOMS AND POLICE BUILDING
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 132
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
A2
Pipe quality conforming to DIN 8077, 8078 and 16962.
All the mains placed unobstructed, shall be lined with
PLAMAFLEKS or a similar thermal insulation system.
The installations placed in wall gutters shall have insulation
executed in wrapped felt bands.
ø 32 mm m' 4.00 7.57 30.28
ø 25 mm m' 32.00 6.24 199.68
ø 20 mm m' 53.00 4.55 241.15
The price for m1 finished work.
PE/PP-R transition fitting
A3 Supply and installation of transition fittings between the PE and PP- pcs 1.00 5.11 5.11
R water supply pipes.
The price for 1 piece finished work.
Walled in valve with nickel plated cap
Supply and installation of walled in valves with nickel plated caps.
TOTAL A 707.91
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 133
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
B. DRAINAGE INSTALLATIONS
Unit Price
No. Item Description Unit Qty Total Euro
Euro
Polyethylene PE-100 water supply pipes.
Procurement, supply and installation of internal sewer PVC pipes
and fittings with couplings. The sewer pipes shall be sealed using
rubber ring seals.
The fittings shall be calculated as a linear metre of the sewer pipe,
with all required accessories, and completely in compliance with
HRN G.C6.512.
TOTAL B 557.17
C. PLUMBING FIXTURES
Unit Price
No. Item Description Unit Qty Total Euro
Euro
Wash basin
Supply and installation of a wash basin executed in the 1st class
majolica (vitreous china), white, 600/490 mm size, completely
functionally executed with a single handle upright mixer water faucet
C1 corresponding to ARMAL, and a drain fixture (siphon), and all
required accessories and installation material.
The price for 1 piece finished work. pcs 12.00 118.11 1,417.32
Toilet bowl
Supply and installation of a toilet bowl executed in the 1st class
majolica (vitreous china), white, entirely functional with a solid
C2 plastic lid and seat, toilet cistern (low mounted) connecting to an
angle valve and a floor drain.
The price for 1 piece finished work. pcs 8.00 93.06 744.48
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 134
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
Unit Price
No. Item Description Unit Qty Total Euro
Euro
Disabled toilet
Supply and installation of a complete, disabled toilet in unisex
sanitary facilities (shape and size selected by the interior design
engineer), consisting of:
- cantilevered ceramic toilet bowl (1st class), 6 litre flushing
capacity, raised at least 6 cm above the floor, with a removable seat
and lid to facilitate cleaning;
- prefabricated installation element for toilet bowls of 112 cm
installation height, with low-noise in-wall cistern (corresponding to
Geberit Duofix). Self-supporting installation element for use in dry
C3 assembly walls or partition wall structures covered with gypsum-
cardboard tiles, complete with integrated water supply 1/2" angle
valve, low-noise intake valve, drain elbow 110/ mm with a
soundproof seal, a toilet bowl coupling with seals and soundproofing
set, sanitary ware fixing screws and all other accessories required
to complete the installation according to the manufacturer's
instructions.
The price for 1 piece finished work. pcs 1.00 419.26 419.26
Urinal
Supply and installation of the 1st class majolica (vitreous china)
urinal, white, completely functional execution with a flush valve and
C4 a nickel plated Ø32 mm siphon; sealing and fixing accessories; Ø15
mm cold water supply fixtures.
The price for 1 piece finished work. pcs 6.00 125.27 751.62
Tankless electric water heater
Procurement, supply and installation of a tankless electric water
heater, complete with all connecting equipment required, installed
C5 below the wash basin in the sanitary facilities.
The price for 1 piece finished work. pcs 12.00 19.43 233.16
Toilet paper roll plastic box
Procurement, supply and installation of plastic boxes for toilet paper
C7 rolls.
The price for 1 piece finished work. pcs 8.00 10.23 81.84
Paper towel roll holder
Procurement, supply and installation of paper towel roll holders at
C8 the wash basins.
The price for 1 piece finished work. pcs 12.00 15.85 190.20
Liquid soap vessel
Procurement, supply and installation of a 0.3 to 0.5 litre capacity
C9 liquid soap vessel at each of the wash basins.
The price for 1 piece finished work. pcs 12.00 9.20 110.40
Toilet bowl cleaning brush
Procurement, supply and installation of a toilet bowl cleaning brush.
C10
The price for 1 piece finished work. pcs 8.00 10.74 85.92
TOTAL C 4,095.56
RECAPITULATION
2.8. SANITARY AND WATER FACILITIES FOR MEN AND WOMEN
No. ITEM DESCRIPTION Total Euro
A WATER SUPPLY INSTALLATIONS 707.91
B DRAINAGE INSTALLATIONS 557.17
C PLUMBING FIXTURES 4,095.56
TOTAL 2.8: 5,360.64
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 135
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
Unit Price
No. Item Description Unit Qty Total Euro
Euro
Polyethylene PE-100 water supply pipes.
Supply and installation of PE-100 polyethylene water supply pipes
of 10 bar operating pressure, for execution of water supply network.
The pipes should conform to EN 12201, ISO 4437, DIN 8074/75
requirements.
A1 The pipeline shall be connected using electric welding. The item
includes complete labour required for installation of the pipes with
all connecting and sealing material.
A7
with a previous and a subsequent flushing of the installation using
water flow equal to fivefold volume of water in the installation. The
pipeline shall be disinfected and flushed until satisfactory results are
achieved in terms of acceptable properties of potable water.
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 136
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
B. DRAINAGE INSTALLATIONS
Unit Price
No. Item Description Unit Qty Total Euro
Euro
Polyethylene PE-100 water supply pipes.
Procurement, supply and installation of internal sewer PVC pipes
and fittings with couplings. The sewer pipes shall be sealed using
rubber ring seals.
Floor siphon
The price for 1 piece finished work. pcs 10.00 118.11 1,181.10
Toilet bowl
Supply and installation of a toilet bowl executed in the 1st class
majolica (vitreous china), white, entirely functional with a solid
C2 plastic lid and seat, toilet cistern (low mounted) connecting to an
angle valve and a floor drain.
The price for 1 piece finished work. pcs 6.00 93.06 558.36
Urinal
Supply and installation of the 1st class majolica (vitreous china)
urinal, white, completely functional execution with a flush valve and
C3 a nickel plated Ø32 mm siphon; sealing and fixing accessories; Ø15
mm cold water supply fixtures.
The price for 1 piece finished work. pcs 6.00 125.27 751.62
Unit Price
No. Item Description Unit Qty Total Euro
Euro
Shower bath
Supply and installation of a PVC shower bath, 90/90 cm size,
complete with a single handed mixer faucet of ARMAL type and a
C4 movable showerhead on a vertical guide, and accompanying drain
elements – release valve, nickel plated siphon and overflow, plug
and chain
The price for 1 piece finished work. pcs 3.00 366.60 1,099.80
Paper towel roll holder
Procurement, supply and installation of paper towel roll holders at
C5
the wash basins.
The price for 1 piece finished work. pcs 10.00 15.85 158.50
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 137
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
Wall mirror
Procurement, supply and installation of a wall mirror, 600 x 400 mm
C6 size, 4 mm thick, with grinded edges and all fixing accessories.
The price for 1 piece finished work. pcs 10.00 19.43 194.30
Toilet paper roll plastic box
Procurement, supply and installation of plastic boxes for toilet paper
C7 rolls.
The price for 1 piece finished work. pcs 6.00 10.23 61.38
Liquid soap vessel
Procurement, supply and installation of a 0.3 to 0.5 litre capacity
C8 liquid soap vessel at each of the wash basins and the shower baths.
The price for 1 piece finished work. pcs 13.00 9.20 119.60
Toilet bowl cleaning brush
Procurement, supply and installation of a toilet bowl cleaning brush.
C9
The price for 1 piece finished work. pcs 6.00 10.74 64.44
Towel bar
Procurement, supply and installation of towel bars at each of the
C10 shower baths.
The price for 1 piece finished work. pcs 3.00 10.23 30.69
TOTAL C 4,219.79
RECAPITULATION
2.9. SANITARY AND WATER FACILITIES FOR MEN AND JANITOR
No. ITEM DESCRIPTION Total Euro
A WATER SUPPLY INSTALLATIONS 688.50
B DRAINAGE INSTALLATIONS 515.24
C PLUMBING FIXTURES 4,219.79
TOTAL 2.9: 5,423.53
RECAPITULATION
IV d/ INTERIOR WATER SUPPLY AND DRAINAGE
No. DESCRIPTION Total
1 2.7. BORDER CUSTOMS AND POLICE BUILDING 733.92
2 2.8. SANITARY AND WATER FACILITIES FOR MEN AND WOMEN 5,360.64
3 2.9. SANITARY AND WATER FACILITIES FOR MEN AND JANITOR 5,423.53
TOTAL IVd: 11,518.09
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 138
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
V ROAD LIGHTNING
Note: In cases where certain equipment is specifically named, it is only an indication of the technical
features the offered equipment would need to comply with.
Each activity considers: purchase, delivery and installation of inputs, components and materials, and the
requested quality controls, unless clearly stipulated differently.
A. PREPARATORY WORKS
TOTAL A: 50.00
D. CABLES
TOTAL E: 1,850.00
G. LUMINAIRES
TOTAL F: 1,860.00
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca,LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 139
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
H. OTHER WORKS
TOTAL H: 950.00
RECAPITULATION
ROAD LIGHTNING
D CABLES 414.00
G LUMINAIRES 1,860.00
TOTAL V: 5,124.00
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca,LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 140
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
VI VIDEO CONTROL
Note: In cases where certain equipment is specifically named, it is only an indication of the technical
features the offered equipment would need to comply with.
TOTAL A: 2,814.54
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca, LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 141
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
length cca 3m, for earthing of metal parts dividers and other
closed metal boxes. Item includes cable lugs, screws, nuts,
washers and thermo pipes for installation isolation.
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca, LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 142
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
TOTAL B: 32,648.00
C. INFORMATION EQUIPMENT
No ITEM DESCRIPTION Unit Qty Unit Price Total
C1 Software for video monitoring and charge system set 1 48,350.00 48,350.00
C4 Cameras for the vehicle registration recognition with lens pcs 36 1,180.00 42,480.00
Supply and mounting the camera for the vehicle registration
recognition (1 Mega pixel), 24V DC, external input and
output and RS-485 interface. Networking through IP
protocol.
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca, LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 143
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca, LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 144
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca, LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 145
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca, LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 146
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
RECAPITULATION
VI. VIDEO CONTROL
No ITEM DESCRIPTION Total EUR
A CONSTRUCTION WORKS OF ELECTRICAL INSTALLATION 2,814.54
B POWER SUPPLY INSTALLATION WORKS AND MATERIAL 32,648.00
C INFORMATION EQUIPMENT 213,660.00
D DOCUMENTATION, FINAL WORKS AND TESTING 7,710.00
TOTAL VI: 256,832.54
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca, LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 147
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
VII Landscape
A. PREPARATORY WORKS
TOTAL A: 511.29
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca, LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 148
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca, LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 149
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
TOTAL B: 55,210.66
C. NOURISHING
Nourishing two years
Nourishing the entire surface of the two years following the completion of construction, ie from the moment of
commissioning / handover and / based on the construction and building log books, writing and approved
changes. Care includes all works and materials in accordance with the rules of the trade exchange-dried plant
material, seeding grassland that has not sprout, control and eradication of diseases and pests, and control
bindings and renewal, renewal of mulch. This work is included in the price and does not charge a separate item.
About the cultivation of land, the contractor is still obligated to maintain the building and the log book, and carry
out the orders entered in the log construction of the Supervisor.
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca, LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 150
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
TOTAL C: 15,510.74
RECAPITULATION
LANDSCAPE
C. NOURISHING 15,510.74
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca, LOT III,
"CORRIDOR Vc MOTORWAY PROJECT" Page 151
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Design Number: A-0857/12
Modification of detailed design
Common designation: GP Vc - LOT 7 - MGP
RECAPITULATION
BOSNIA I HERZEGOVINA
Construction of the BCP Bijaca , LOT III
"CORRIDOR Vc MOTORWAY PROJECT" Page 152
PHASE IV
LOT 7: section POČITELJ - BIJAČA
Construction of the BCP Bijaca - LOT III, Phases III and IV
OVERALL RECAPITULATION OF BILL OF QUANTITIES
No Total EUR
I Phase III 3,022,101.46
II Phase IV 1,851,764.84
A TOTAL WORKS - LOT III (Phases III + IV) 4,873,866.30
B CONTINGENCIES (10 % OF TOTAL WORKS) 487,386.63
C TOTAL CONTRACT PRICE (A+B) 5,361,252.93
DISCOUNT 8% 428,900.23
4,932,352.69