5.1. GENERAL
As discussed in the previous chapter, the planned development of drinking
water supply system (SPAM Tebasabo) is planned to provide drinking water
supply for the four districts of East Kalimantan, namely Kutai Kartanegara
(Kukar) District, Balikpapan City, Samarinda City and Bontang City.
Raw water sources used for the project will be taken from the Mahakam River,
which will be streamed by using transmission pipeline, which will pass through
four (4) the administrative area of Kabupaten/Kota, namely Kukar, Balikpapan,
Samarinda and Bontang. Based on the calculation of projected water needs
until the year 2046 to comply to the four regions of the required service
capacity of 8,300 lt/s. To provide drinking water to four (4) district/city of the
raw water source that makes use of the Mahakam River with a capacity large
enough, with consideration of the condition of the area, simplicity in design,
easy in operation and maintenance, then the service system planned in the
two systems, i.e., Systems that service the Northern city of Samarinda, Kutai
Kartanegara (Kukar) District and the southern System serving Kukar, The town
of Samarinda and Balikpapan City.
5-1 5-1
EXECUTIVE SUMMARY
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
ALTERNATIVE 1 ALTERNATIVE 2
NORTH SYSTEM
SOUTH SYSTEM
950m
5.2.1.Existing Utilization
Mahakam River as a main water source of Samarinda City Local Water Supply
Company and District Kutai Kartanegara Local Water Supply Company.
Nowadays, Samarinda City Local Water Supply Company (LWSC) use the raw
water source from Mahakam River of ± 3,000 lt/s with total intake about 11
units and District Kutai Kartanegara Local Water Supply Company, using raw
water source from Mahakam River about ± 850 lt/s with total intake about 12
units.
5.2.2.Tidal Condition
From secondary data, the monitoring on tidal at Mahakam River Estuary, it is
found that River Mahakam up side down around ±2,30 m (see Figure 5.5).
From tidal characteristic, analisys result from harmonic component, is found
Formzahl count about 0.9607 That shown the tidal type at Mahakam River
Estuary is mixed semi diurnal type, where two tides and two receds happened
in one day.
5.2.5.Leading Debt
Potential development of Mahakam River for drinking water from the side of
quantity is very good. The average discharge of a large Mahakam river
reaches 2,200 m3/s
MAHAKAM RIVER
Gambar 5.7. Indikatif Rencana Lokasi Intake Sistem Utara (Intake Embalut)
EXECUTIVE
INDICATIVESUMMARY
INTAKE LOCATION 5-6
PRE-FS PREPARATION
Embalut Village OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
(117°04'53.54" E 00°19'43.10" S
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
Southern System
Source of raw water by utilizing Mahakam River for South System serving Samarinda
City, Kutai Kartanegara Regency and Balikpapan City with the requirement of 4,450
lt / sec (stage 1 of 3,000 lt / sec, and phase 2 1,550 lt / dt).
The following are indicative data for the intake location of the South System:
Name Source: Mahakam River
MAHAKAM RIVER
5.3.2.Basic Design
Basic Design Intake
North System
NO
DESCRIPTION UNIT STAGE-1 STAGE-2 TOTAL
.
INTAKE
1 Type Well Well
2 Pompa Intake unit 4 5 9
3 Head m 50 50
4 Debit (Q) inlet lt/s 660 660
South System
NO
DESCRIPTION UNIT STAGE-1 STAGE-2 TOTAL
.
INTAKE
1 Type Well Well
2 Pump Intake unit 6 4
3 Head m 40 40
4 Debit (Q) inlet lt/s 660 660
C. Filtration Process
This filtration process aims to filter the fine flocs still carried by the
processed water coming from the clarifier, so that the water that
passes from the filter is completely clean of any impurities or other
impurities. Types of filtration commonly used are: filter bed with single
media, filter bed with multi media or other soft material.
The intake is also equipped with a pipe as a carrier channel from the
Mahakam River leading to the well. And from the pouring is the
pumping system to the processing building.
MAHAKAM RIVER
4 Length m 12 12
5 Width m 12 12
6 Height m 4 4
Rapid Sand Filter
1 System - Constant Rate Dual Media
2 Loading Rate m/jam 11 11 11
3 Space Demand m2 605 622 1.227
4 Unit unit 12 12
5 Length m 10 10
6 Width m 5 5
7 Height m 3 3
Reservoir
1 System - 2 Compartment
2 Detention Time (Td) Hour 2 2 2
3 Volume m 3
13.320 13.680 27.000
4 Unit unit 3 3 6
5 Length m 44 44
6 Width m 29 29
7 Height m 3,5 3,5
Sludge Drying Bed (SDB)
1 Volume Sludge % 10% 10%
2 Volume Sludge m3/day 15.984 16.416 32.400
3 Solid Content % 3% 3%
4 Solid Content m /day
3
480 492
5 Cake Thickness M 0,5 0,5
6 Cyclus of Sludge Taking day 10 10
7 Demand of SDB space m 2
9.590 9.850 19.440
8 Modul unit 10 10
9 Length m 54 54
10 Width m 18 18
11 Height m 0,8 0,8
EXECUTIVE SUMMARY 5 - 10
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
MAHAKAM RIVER
EXECUTIVE SUMMARY 5 - 11
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
EXECUTIVE SUMMARY 5 - 12
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
In each offtake at the WTP location area were equipped with the
complimenting buildings which consist of: reservoir, chemical; building, sludge
drying bed (SDB), genset house, guard house with the capacity according to
the demand. For Offtake Marangkayu 1 and 2 are also equipped by the
booster to distribute the water to Bontang.
EXECUTIVE SUMMARY 5 - 13
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
1 WTP
EXECUTIVE SUMMARY 5 - 14
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
MARANGKAYU
MARANGKAYU 1
No 2
DESCRIPTIONS UNIT
.
Alt 2 Stg 1 & 2 Alt 2 Stg 1 & 2
Q Design lt/s 25 25
System Steel Package Steel Package
2 Coagulator hydraulic hydraulic
td seconds 5 5
Total unit 1 1
Volume m3 0,125 0,125
Height m 0,8 0,8
Length m 0,4 0,4
Width m 0,4 0,4
3 Flocculator hydraulic hydraulic
td minutes 30 30
Compartments total unit 6 6
Volume m3 8 8
Height m 3 3
Length m 1,6 1,6
Width m 1,6 1,6
4 Sedimentation
Loading Rate m/hour 6 6
Compartments total unit 2 2
Space Demand m2 8 8
Length m 3 3
Width m 2,5 2,5
Height m 4 4
5 Filter
Constant Rate Dual Constant Rate
System media Dual media
Loading Rate m/hour 7 7
Vessels total unit 5 5
Space Demand/vessel m2 3 3
Length m 1,6 1,6
Width m 1,6 1,6
Height m 3 3
6 Reservoir
System 2 Kompartemen 2 Kompartemen
td hours 2 2
Volume m3 180 180
Total unit 1 1
Height m 3,5 3,5
Length m 9 9
Width m 6 6
7 Sludge Drying Bed (SDB)
Volume Sludge % 10 10
Volume Sludge m3/day 216 216
Solid Content % 3 3
Solid Content m3/day 6 6
Cake Thickness m 0,5 0,5
Sludge Cyclus Taken days 10 10
SDB Space Demand m2 130 130
Modul total unit 10 10
Height m 0,8 0,8
Width m 2 2
Length m 6 6
EXECUTIVE SUMMARY 5 - 15
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
In each offtake at the WTP location area were equipped by the complimenting
buildings which consist of: reservoir, chemical building, sludge drying bed
(SDB), genset house, guard house with the capacity according to the demand.
For the Luakulu Offtake were equipped with the booster to distribute the water
to Sanga-sanga and Loa Janan, and Muara Jawa offtake were equipped with
the booster to distribute the water to the Soeharto Hill reservoir which later
will channel the water to Balikpapan offtake.
EXECUTIVE SUMMARY 5 - 16
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
SAMARIND
MUARA
TENGGARONG A ZONE 4,
No JAWA
DESCRIPTIONS UNIT 5
.
Alt 2 Stg Alt 2 Stg Alt 2 Stg Alt 2 Stg
1 1 2 1
1 WTP
Q Design lt/s 100 600 400 350
Steel Super
System Package Super Pulsator Pulsator
Sedimentation
2 (+Flocculation)
Loading Rate m/hour 4 8 8 8
Space Demand m2 90 270 180 158
Unit 2 2 2 2
Length m 7 12 10 9
Width m 7 12 10 9
Height m 4 4 4 4
5 Reservoir
2 2
System Compartment 2 Compartment Compartment
td hours 2 2 2 2
Volume m3 720 4.320 2.880 2.520
Total unit 1 1 1 1
Height m 3,5 3,5 3,5 3,5
Length m 18 43 35 33
Width m 12 29 23 22
EXECUTIVE SUMMARY 5 - 17
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
5 Reservoir
2
2 2 Compartmen 2
System Compartment Compartment t Compartment
td hours 2 2 2 2
Volume m3 1.980 900 10.800 5.040
Total unit 1 1 1 1
Height m 3,5 3,5 3,5 3,5
Length m 29 20 68 46
Width m 19 13 45 31
EXECUTIVE SUMMARY 5 - 18
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
Space Demand/unit m2 5 5 5 3 8
Lenght m 2,3 2,3 2,3 1,6 2,8
Width m 2,3 2,3 2,3 1,6 2,8
Height m 3 3 3 3 3
6 Reservoir
2
Compartme
System nt 2 Compartment 2 Compartment
td hours 2 2 2 2 2
Volume m3 360 360 360 180 540
Total unit 1 1 1 1 1
Height m 3,5 3,5 3,5 3,5 3,5
Lenght m 12 12 12 9 15
Width m 8 8 8 6 10
7 Sludge Drying Bed (SDB)
Volume Sludge % 10 10 10 10 10
Volume Sludge m3/day 432 432 432 216 648
Solid Content % 3 3 3 3 3
Solid Content m3/day 13 13 13 6 19
Cake Thickness m 0,5 0,5 0,5 0,5 0,5
Sludge Cyclus Taken days 10 10 10 10 10
SDB Space Demand m2 259 259 259 130 389
Total Module unit 10 10 10 10 10
Height m 0,8 0,8 0,8 0,8 0,8
Width m 3 3 3 2 4
Lenght m 9 9 9 6 11
EXECUTIVE SUMMARY 5 - 19
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
EXECUTIVE SUMMARY 5 - 20
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
EXECUTIVE SUMMARY 5 - 21
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
Gambar 5.11
5 - 22 5 - 22
EXECUTIVE SUMMARY
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM 5-20
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
Gambar 5.12
LAPORAN AKHIR 5 - 23
PENYUSUNAN PRA-FS POTENSI INVESTASI SYSTEM PENYEDIAAN AIR MINUM (SPAM) REGIONAL 5-21
KOTA TENGGARONG, BALIKPAPAN, SAMARINDA DAN BONTANG
PT. DWIKARSA ENVACOTAMA
Gambar 5.13
LAPORAN AKHIR 5 - 24
PENYUSUNAN PRA-FS POTENSI INVESTASI SYSTEM PENYEDIAAN AIR MINUM (SPAM) REGIONAL
KOTA TENGGARONG, BALIKPAPAN, SAMARINDA DAN BONTANG
5-22
PT. DWIKARSA ENVACOTAMA
Figure 5.14. Indicative Pipeline Plan (GPS Tracking) Topographic Measurement for North System
EXECUTIVE SUMMARY 5 - 25
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
Figure 5.15. Indicative Pipeline Plan (GPS tracking) topographic measurement for South System
EXECUTIVE SUMMARY 5 - 26
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
Volume
No. Activities Unit
Stage 1 Stage 2
EXECUTIVE SUMMARY 5 - 27 5 - 27
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)
PT. DWIKARSA ENVACOTAMA
1 SECTION 2-I (From Loa Kulu WTP to cross road Old Balikpapan)
● DCIP ¢ 2000 mm (C-25/K-9) meter 24,600
3 SECTION 2-3 (Dari Booster 2-1, Loa Kulu sampai simpul Offtake
Sanga-sanga)
● Pipa DCIP ¢ 2000 mm (C-25/K-9) meter 6,036
● Pipa PE ¢ 315 mm SDR 13.6 meter 102
4 SECTION 2-4 (From Booster 2-1, Loa Kulu to Node Offtake Loa Janan)
● DCIP ¢ 1800 mm (C-25/K-9) meter 13,398
● PE Pipe ¢ 315 mm SDR 13.6 meter 198
5 SECTION 2-5 (From Booster 2-1, Loa Kulu to Booster 2-2 Bukit
Suharto)
● DCIP ¢ 1800 mm (C-25/K-9) meter 6,258
EXECUTIVE SUMMARY 5 - 28 5 - 28
PRE-FS PREPARATION OF INVESTMENT POTENTIAL ON THE REGIONAL WATER SUPPLY SYSTEM
FOR THE CITIES OF TENGGARONG, BALIKPAPAN, SAMARINDA AND BONTANG (TEBASABO)