Sie sind auf Seite 1von 6

Standard Operating Procedure

TITLE: Manufacturing Method Code Table

SOP No : Version : Replace SOP No : Page 1 of 6


BPCS_PRO 01 New

Prepared by : Checked by : Approved by :


Ananth Inamdar Vamsi Krishna Srinivasa S V

Effective date: 12th November 2014 Review date : 11th November 2015

REFERENCE
BPCS_Business Process_PRO
TITLE: INVENTORY RETURNS FROM PRODUCTION DEPARTMENT

SOP No : Version : Replace SOP No : Page 2 of 6


BPCS_PRO 01 New

Revision History

(Version) (Reason of Revision) (Revised by) (Issued date)


01 New SOP

I. OBJECTIVE

This SOP outlines the procedure to be followed for creation of Manufacturing Method Code
Table
II. SCOPE

This SOP is applicable for ITTI BPCS System

III. ROLE AND RESPONSIBILITY

Only appointed and authorised Production Personnel to maintian Manufacturing Method Code
Table.

IV. “ENVIRONMENTAL HEALTH & SAFETY” ASPECT

There are no significant hazards or special instructions related to the process / activities
described which need to be detailed in this SOP.

V. CONTENT

Abbreviations:

BPCS: Business Planning and Control System


MRP : Materials Requirement Planning
BOM : Bill of Materials

General Guidelines:
TITLE: INVENTORY RETURNS FROM PRODUCTION DEPARTMENT

SOP No : Version : Replace SOP No : Page 3 of 6


BPCS_PRO 01 New

Alternatives and Each organisation will need to set up the structure for the use of alternatives and
method codes therefore the use of method codes. Method codes are defined in (SYS115) and
could relate generally to say a first alternative option or specifically to a variant in
the BoM or Routing.

The combination of the BoM method and the Routing method defines the overall
manufacturing process. A table of valid combinations is maintained through
(SYS135) and automatically generated using (SYS137).

New cost set To maintain standards for valid alternative method combinations, a new cost set will
be required.

This is done by:

1. Creating a cost set using (CST140) for the BoM method/ Routing method
combination.
2. Maintain BoM and Routing for the method.
3. Run load standards from routings (CST600) for the alternative method cost set.

When this has been done the standard cost based on the alternative BOM and
routing will be calculated.

Note: This is subject to the finance and costing review, which has not been
completed.
TITLE: INVENTORY RETURNS FROM PRODUCTION DEPARTMENT

SOP No : Version : Replace SOP No : Page 4 of 6


BPCS_PRO 01 New

Navigation Details:

Program Action Result


No/ Step
SYS115 Call ISYS115 menu option and Press Enter. Screen
ISYS115
D1-01 is
displayed
ISYS1151- Select Option ‘I’ and Press Enter. Screen
01 ISYS115
D2-02 is
displayed
ISYS115D Input the following details:
2-02
Code A1

Description Mfg and Costing

Type 2 0=Manufacturing Only


1=Costing Only
2=Both Manufacturing and Costing

Press <Enter> to validate the entries made.


TITLE: INVENTORY RETURNS FROM PRODUCTION DEPARTMENT

SOP No : Version : Replace SOP No : Page 5 of 6


BPCS_PRO 01 New

BOM Mfg. Method Code : Use the manufacturing method code to allow alternate
bills of material within a facility. The BOM Mfg. Method Code can be left blank.
This manufacturing method code allows experimental variations of a standard Bill
of Material, operational variations of a standard BOM, etc. Typical uses of the
manufacturing method code include substitution of components on the standard
BOM/Formula/Recipe or alternate routings (operational) tied to the components of
the BOM.
TITLE: INVENTORY RETURNS FROM PRODUCTION DEPARTMENT

SOP No : Version : Replace SOP No : Page 6 of 6


BPCS_PRO 01 New

Prepared By Reviewed By Approved By

Ananth Inamdar Vamsi Krishna Srinivasa S V

____________________ ____________________ ____________________

Das könnte Ihnen auch gefallen