Bending radius of FOC

Normal 10 times the dia meter .


If it under tension 20 times the dia meter.

Separation required for the crossing:


For pipe line 1m
Marl road traffic area 760mm, non- traffic area 610mm.
For water line : parallel 300mm, crossing 150mm
Electrical cable : parallel 300mm , crossing 150mm for well tamped soil , bricks work 75mm,
ordinary case :300mm

Fence crossing : we can place the 4” PVC conduit with sub duct.

Fo cable strands:
1. Blue
2. Orange
3. Green
4. Brown
5. Slate
6. White
7. Red
8. Black
9. Yellow
10. Violet
11. Pink
12. Aqua

Budget loss:
Splice loss + attenuation loss + connector loss

Subduct length : should not Exide more than 455m.


Duct Bank length: 453m maximum

HDD: Horizontal Directional Drilling


HDPE: High Density Poly Ethylene pipe.

Concrete :
As per SAES-Q-001 : non –structure concrete does not required curing (2000psi on
structure concrete does not required curing).

Concrete encasement for all conduit system must have minimum 75mm concrete covering.
Terra Tape: Orange colour Detectable terra tape is used for telecommunication system.

One layer of terra tape must be placed above the FO cable , tape need to be placed min
300mm above the cable and min 300mm below the ground level.
EMS: Electronic Marker System. EMS was placed at each end of the duct bank bellow the
marker post , min 150mm above the duct bank

BSW6: Buried Service Wire 6 pair jelly filled.


UTP: Unshielded Twisted Pair

Patch cord connector type :


SC-square connector
ST- twisting
FC-thread type
LC- angle connector

Marker post : 1400mm length


800mm above ground & 600mm below the ground.

Sub Duct :

4-1” Sub duct :Orange , Blue , Green , White.

3-(1&1/2)” Sub Duct: Orange, Green , White

ATA: Analogue Telephone Adaptor.

Pedestal Type: CAD -12, UP -1000.

Patch Panel :
1U comm scope patch panel.
Conning patch panel.

Ground test :
Pedestal : bellow 25 ohms
Comm. Cabinet : bellow 3 ohms
Wadi Crossing: In wadi crossing cable can be directly placed at 2.5m deapth , and 2 layer of
detectable warning tape is required.

Duct bank: Each duct bank must have 2 conduits.

If it is 4” coduit duct bank mandrel test need to be carried out befor concreting (initial
mandrel), after concreting (Final mandrel)

For connecting PVC conduit sealant , primer, cement solution are used.

OTDR : Optical Time Domain Reflecto Meter.

Testing of FO cable :

 Pre installation test


 End To End testing

Grounding Test :

Grounding test need to carried out for the pedestal and the communication cabinet.

Pedestal : less than 10Ω.

Communication cabinet : less than 3Ω

Sealing the conduit:+

 4” duct plug, 4” snug pluge , 1” duct pluge & 1” snug pluge.


 3M sealent can be used instead of plug.
 Duct seal was used inside the man hole and the inside building.
 CP 25 need to be applied at the top of the duct seal , it will act as a fire barrier.

Under Ground and the outside building PVC coated RGS conduits was used for the
protection of the cable .

RGS-Rigged Galvanized Steel.

SAES-T-911

 Where it is necessary to install metallic pipe bends at building entrances, pole risers, etc.,
and the pipe bend is extended underground with non-metallic conduits, the cable shield to
metallic pipe bond may be omitted at the underground end of the pipe bend, provided that
this is concurred to by the Saudi Aramco Communications Standards Committee Chairman.
However, if the metallic pipe bend is extended underground with metallic pipe, the cable
shield/armor must be bonded to the metallic pipe at both ends.
Subduct colour : Orange , Green , White

Orange , Green , White , Blue.

Notes : For higher speed and fast transmission single mode FO cable is used.