Project No.

Pre-Commisioning Check List


Test Memo No.

Test Memo Description: Sheet 1 of 1

Electrical System & Instrumentation


Item Description OK NA PL(A) Signature
Cleared
1 Equipments Installation completed
2 Cable Termination completed Date:
3 Meggering completed / Connection Torque/Ductor test
4 Loop Check completed Sign:
5 Earthing Check completed
6 Calibration, Trips & Alarms Check verfied
7 Visual Damage (Internal / External) Date:
8 Cleanlines (Switchboards, Transformers)
9 Mechanical Stage Completed Sign:
10 Certification Valid and Active

Mechanical / HVAC / Safety Equipments & Drilling System


Item Description OK NA PL(A) Signature
Cleared
1 Equipments Installation completed
2 Mechanical Completion (Electrical) Date:
3 Mechanical Completion ( Piping)
4 Visual Damage (Internal / External) Signature:
5 Cleanlines
6 Certification Valid and Active Date:
7 Non Destructive Test completed
Sign:

Piping System
Item Description OK NA PL(A) Signature
Cleared
1 Piping Test Completed
2 Non Destructive Test completed Date:
3 Cleaning / Flushing Completed
4 Reinstatement Stage Completed Signature:
5 Visual Damage
6 Certification Valid and Active Date:

Sign:

OK – Done successfully √ Successffully


NA – Non Applicable X No Successffully
PL (A) Cleared – All punch «A» are clear

Remarks