Training Course on

ne
tiv nd
ow
Principles in Tunnel Design

ec rl a
e
sp e
Centro Asturiano, Mexico, D.F. 02 – 04 May 2013, 10:30 – 11:30 am

re itz
ir w
he - S
Sprayed Concrete Support System

ft n
O tio
© a
n nd
Harald Wagner, PhD.,PE
tio ou
ra F
st T
llu E

Consulting Engineer
lI C
Al ITA

ITA EXCO EXPERT


©

Bangkok Thailand / Graz Austria

www.drharaldwagner.com
Sprayed Concrete (Concreto

r-s
Lanzado) has to be

ne
tiv nd
ow
economically viable.

ec rl a
e
sp e
re itz
It shall meet the challenges

ir w
he - S
of the future of underground

ft n
space use through

O tio
© a
Technological Innovations n nd
tio ou
ra F
st T
llu E

Where appropriate, it shall


lI C
Al ITA

make use of Sprayed


©

Concrete .
Unsupported inclined access shaft in stable ground

www.drharaldwagner.com
r-s
Future Sprayed Concrete Developments

ne
tiv nd
ow
ec rl a
e
• Conventional Tunnelling with Sprayed Concrete

sp e
re itz
• Foreign Assistance in Design and Construction

ir w
he - S
• Risk Preparedness for New Technologies

ft n
O tio
• Trained Engineers and Miners
© a
• n nd
3 Main Components System Method Process
tio ou
ra F

• Sprayed Concrete in TBM Tunnelling


st T
llu E

• Steel Fibers in more widely Use


lI C
Al ITA
©

www.drharaldwagner.com
r-s
Geotechnical Conditions in

ne
mountainous conditions are

tiv nd
ow
ec rl a
characterized by

e
sp e
re itz
ir w
residual stresses,

he - S
numerous fault zones,

ft n
O tio
complex folding, and by

© a
thrust zones. n nd
tio ou
ra F
st T

Conventional Tunneling with


llu E
lI C

Sprayed Concrete
Al ITA

Is such challenged.
©

Multiple drifting in conventional tunnelling of urban vehicular tunnel

www.drharaldwagner.com
r-s
CTM Tunnel support

ne
tiv nd
elements, e.g. shotcrete,

ow
ec rl a
has been used since more

e
sp e
re itz
than 50 years in good rock.

ir w
he - S
ft n
 However, successful

O tio
applications were related to
© a
Foreign Assistance in n nd
tio ou
ra F

Design and Construction.


st T
llu E
lI C
Al ITA
©

Sprayed Concrete Lining preparation for installation of membrane

www.drharaldwagner.com
r-s
ne
tiv nd
ow
ec rl a
e
sp e
New Construction Methods are faced with

re itz
ir w
resistance as they are considered to be risky and

he - S
ft n
such unwanted by decision makers.

O tio
© a
New Technologies are therefore imported until its
n nd
tio ou
success provides a safe base for decisions.
ra F
st T
llu E
lI C
Al ITA
©

www.drharaldwagner.com
r-s
ne
tiv nd
ow
The future of Sprayed Concrete in both

ec rl a
e
sp e
mountainous and urban conditions depend on

re itz
ir w
experienced teams in design and construction.

he - S
ft n
O tio
Trained Engineers and Miners need to be
© a
n nd
recruited locally and international together with
tio ou
ra F

sufficient education and training.


st T
llu E
lI C
Al ITA
©

www.drharaldwagner.com
r-s
Sprayed Concrete

ne
tiv nd
ow
of today offers for

ec rl a
e
sp e
the future a huge

re itz
ir w
potential of

he - S
Innovation,

ft n
O tio
consisting of 3 main
© a
components. n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Sprayed Concrete face wall and break through from adverse tunnel site.

www.drharaldwagner.com
r-s
ne
In full excavation, partial

tiv nd
ow
and full mechanized

ec rl a
e
tunnel systems have a

sp e
re itz
potential for future

ir w
he - S
development.

ft n
O tio
© a
Sprayed Concrete
n nd
tio ou
Application Systems will
ra F

be permanently installed
st T
llu E

on Tunnel Boring
lI C
Al ITA

Machines.
©

Portal wall with center drift excavation between side wall galleries.

www.drharaldwagner.com
r-s
ne
tiv nd
ow
Future developments in Sprayed Concrete

ec rl a
e
sp e
Technology include

re itz
ir w
he - S
Wet Processed Shotcrete and the use of

ft n
O tio
Steel Fibers for Reinforcement
© a
n nd
tio ou
ra F

in combination with conventional reinforcing steel


st T
llu E
lI C

bars.
Al ITA
©

www.drharaldwagner.com
©
Al ITA
lI C
llu E
st T
ra F
tio ou
n nd
© a
O tio
ft n
he - S
ir w
re itz

HRT Heading Status


sp e
ec rl a

www.drharaldwagner.com
tiv nd
e
ow
ne
r-s
Case History RAMPUR HEP/HRT (Himalaya/India)
r-s
ne
tiv nd
ow
GE-1
PACKA

ec rl a
e
sp e
re itz
43.2 M LONG CUT & COVER

ir w
CRITICA
E- L RE
5899 M ACH
ST

he - S

21
KA
AT

M
3107

85
NJHPS 1500 MW
IO

C
N

M
PA
10.5 M Ø 15.08 KM LONG HRT
12

ft n
KAJO ADIT
90

795 M LONG

O tio
KUNNI ADIT
0

OW
M

593.89 M LONG
FL RAMPUR INTAKE AT

© a
SURGE SHAFT TRT OUTFALL OF NJHPS
M

n nd
81
11 RAMPUR INTAKE TUNNEL 10.50 M Ø 484 M
4M 5M LONG
tio ou
1 72 290
CONSTRUCTION ADIT CUM
TRT
ra F

SPILL TUNNEL
2M 10.15 M HORSE SHOE SHAPE 335 M LONG
46
st T

GOSHAI ADIT
1089.60 M LONG
llu E

POWER HOUSE
lI C

COMPLEX
BAEL ADIT
Al ITA

578 M LONG
©

ER
SATLUJ RIV

www.drharaldwagner.com
BEST AVERAGE RATE OF PROGRESS ACHIEVED

r-s
ne
tiv nd
ow
ec rl a
AVERAGE RATE OF EXCAVATION 80 M /MONTH

e
sp e
re itz
IN HEADING

ir w
he - S
ft n
AVERAGE RATE OF EXCAVATION 131 M /MONTH

O tio
© a
IN BENCHING
n nd
tio ou
ra F
st T

AVERAGE RATE FOR CONCRETE 220 M /MONTH


llu E
lI C

LINING (OVERT)
Al ITA
©

AVERAGE RATE FOR CONCRETE 500 M/MONTH


LINING (INVERT)
www.drharaldwagner.com
OVERALL AVERAGE RATE OF PROGRESS ACHIEVED

r-s
ne
tiv nd
ow
ec rl a
AVERAGE RATE OF EXCAVATION 52 M /MONTH

e
sp e
IN HEADING

re itz
ir w
he - S
AVERAGE RATE OF EXCAVATION 69 M /MONTH

ft n
O tio
IN BENCHING
© a
n nd
tio ou
ra F

AVERAGE RATE FOR CONCRETE 200 M


st T
llu E

LINING (OVERT) /MONTH


lI C
Al ITA
©

AVERAGE RATE FOR CONCRETE 325 M/MONTH


LINING (INVERT)
www.drharaldwagner.com
r-s
ANTICIPATED AVERAGE RATE OF PROGRESS

ne
WITH IMPROVED CONSTRUCTION MANAGEMENT

tiv nd
ow
ec rl a
e
sp e
AVERAGE RATE OF EXCAVATION 80 M /MONTH

re itz
ir w
IN HEADING

he - S
ft n
O tio
 AVERAGE RATE OF EXCAVATION 200M /MONTH

© a
IN BENCHING n nd
tio ou
ra F

 AVERAGE RATE FOR CONCRETE 250 M /MONTH


st T
llu E
lI C

LINING (OVERT)
Al ITA
©

 AVERAGE RATE FOR CONCRETE 500M /MONTH


LINING (INVERT)
www.drharaldwagner.com
r-s
ne
tiv nd
ow
Current Status

ec rl a
e
sp e
re itz
925

ir w
4546 9638

he - S
ft n
O tio
2898 3239 2846 3106 2418 277

© a
n nd
tio ou
BAYAL GOSHAI KASHOLI KUNNI KAJO SPILL
ra F
st T

Total Heading Completed : 14184 m , 93.45 %


llu E
lI C

Asking rate in critical reach :- 60.20 m/month/face


Al ITA
©

www.drharaldwagner.com
©
Al ITA
lI C
llu E
st T
ra F
tio ou
n nd
© a
O tio
ft n
he - S
ir w
re itz
sp e
ec rl a

www.drharaldwagner.com
tiv nd
e
ow
ne
r-s
Head Race Tunnel (HRT) Benching Condition
©
Al ITA
lI C
llu E
st T
ra F
tio ou
n nd
© a
O tio
ft n
he - S
ir w
re itz
sp e
ec rl a

www.drharaldwagner.com
tiv nd
e
HRT – Final Lining Condition

ow
ne
r-s
Kasholi D/s Heavy Water Seepage @ 22 litres/sec.

r-s
ne
tiv nd
ow
ec rl a
e
sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Excavation & Installation of Support in conditions of strong water infiltration.

www.drharaldwagner.com
Goshai U/s Cavity. ( RD 1243m)

r-s
ne
tiv nd
ow
ec rl a
e
sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Mud flow causing cave in due to weak shotcrete primary lining


www.drharaldwagner.com
Pipe roofing in Goshai HRT U/s

r-s
ne
tiv nd
ow
ec rl a
e
sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Lining support consisting of shotcrete and pipe roofing

www.drharaldwagner.com
DEFORMATION IN MM

-20.000
0.000
20.000
40.000
60.000
80.000
100.000
120.000
140.000
08.09.09
© 11.09.09
16.09.09
19.09.09
Al ITA
lI C 20.09.09
llu E 23.09.09
24.09.09
04.10.09
st T
06.10.09
ra F
08.10.09
tio ou
12.10.09
15.10.09
n nd
© a
21.10.09
23.10.09
O tio
30.10.09
ft n
02.11.09
he - S
06.11.09 ir w
DATE 09.11.09
13.11.09
re itz
16.11.09
sp e
24.11.09
AFTER HEADING

26.11.09
ec rl a

www.drharaldwagner.com
30.11.09
tiv nd
03.12.09
e
07.12.09
10.12.09
ow
14.12.09
ne
01.01.10
AT GOSHAI HRT UPSTREAM RD:229.5M

06.01.10
r-s
18.01.10
30.01.10
02.04.10
DEFORMATION CURVE MEASURED BY PAPER TARGET

AB

AC
BC
r-s
DEFORMATION CURVE MEASURED BY SPBX AT GOSHAI HRT

ne
tiv nd
UPSTREAM RD:230M

ow
ec rl a
AFTER BENCHING

e
sp e
160.00

re itz
DEFORMATION IN MM

140.00

ir w
he - S
120.00

100.00

ft n
O tio
80.00

© a
LEFT SIDE AT SPL

n nd
60.00
LEFT CROWN
tio ou
40.00
CENTER CROWN
ra F

20.00 RIGHT CROWN


st T

0.00 RIGHT SIDE AT SPL


llu E
lI C

-20.00
Al ITA
11.06.2011

15.06.2010

20.06.2011

24.06.2011

02.07.2011

08.07.2011

16.07.2011

23.07.2011

30.07.2011

01.08.2011

06.08.2011

10.08.2011

13.08.2011

19.08.2011

24.08.2011

28.08.2011

01.09.2011

05.09.2011

09.09.2011

16.09.2011

24.09.2011
©

DATE

www.drharaldwagner.com
Primary Lining Support Efforts with insufficient effect.

r-s
ne
tiv nd
ow
ec rl a
e
sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Vertical support provided RD 1370m-1400m U/S HRT Bayal.

www.drharaldwagner.com
Primary Lining of shotcrete and steel arches

r-s
ne
tiv nd
ow
ec rl a
e
sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Squeezing rock conditions encountered at Kunni D/s

www.drharaldwagner.com
Installation of support with Ribs & Lagging

r-s
ne
tiv nd
ow
ec rl a
e
sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Rock desintegration and loosening due to slow lining installation (Kunni D/s)
www.drharaldwagner.com
©
Al ITA
lI C
llu E
st T
ra F
tio ou
n nd
© a
O tio
ft n
he - S
ir w
re itz
sp e
ec rl a

www.drharaldwagner.com
tiv nd
e
ow
ne
r-s
Tunnelling with Backhoe and Shotcrete Support
©
Al ITA
lI C
llu E
st T
ra F
tio ou
n nd
© a
O tio
ft n
he - S
ir w
re itz
sp e
ec rl a

www.drharaldwagner.com
tiv nd
e
ow
ne
r-s
Top Heading / Bench Excavation
©
Al ITA
lI C
llu E
st T
ra F
tio ou
n nd
© a
O tio
ft n
he - S
ir w
re itz
sp e
ec rl a

www.drharaldwagner.com
tiv nd
e
ow
ne
Shotcreting primary lining and face protection

r-s
©
Al ITA
lI C
llu E
st T
ra F
tio ou
n nd
© a
O tio
ft n
he - S
ir w
re itz
sp e
ec rl a

www.drharaldwagner.com
tiv nd
e
ow
ne
r-s
Invert excavation stages and construction of closed ring
©
Al ITA
lI C
llu E
st T
ra F
tio ou
n nd
© a
O tio
ft n
he - S
ir w
re itz
sp e
ec rl a

www.drharaldwagner.com
tiv nd
e
ow
ne
r-s
©
Al ITA
lI C
llu E
st T
ra F
tio ou
n nd
© a
O tio
ft n
he - S
ir w
re itz
sp e
ec rl a

www.drharaldwagner.com
tiv nd
e
ow
ne
r-s
©
Al ITA
lI C
llu E
st T
ra F
tio ou
n nd
© a
O tio
ft n
he - S
ir w
re itz
sp e
ec rl a

www.drharaldwagner.com
tiv nd
e
ow
ne
r-s
r-s
ne
tiv nd
ow
ec rl a
 Ground is viewed as integrated element of support

e
sp e
re itz
Ground reactions narrow measured to check stability

ir w


he - S
ft n
 Shotcrete essential to keep the ground undisturbed

O tio
© a
 n nd
Support Design between RAPID RIGID & SLIM DEFORMABLE
tio ou
ra F

 Type of support to allow most economical design


st T
llu E
lI C

 Support installation on ground classification system


Al ITA
©

 Contractor & Engineer need to agree on support installation

www.drharaldwagner.com
r-s
ne
Principles in Tunneling Design

tiv nd
ow
ec rl a
e
Mexico, D.F. 02 – 04 May 2013

sp e
re itz
ir w
he - S
Disclaimer

ft n
O tio
© a
a) The speakers are presenting their own personal views and are not expressing the view
of the Foundation. n nd
tio ou
ra F

b) Papers and documents displayed or handed out during the Event are copyrighted. The participants
st T
llu E

must observe and comply with all applicable law regulations concerning the copyright.
lI C
Al ITA
©

www.drharaldwagner.com

Das könnte Ihnen auch gefallen