Sie sind auf Seite 1von 3

K.

NATARAJAN
Mobile: +9487922521 ~ E-Mail: samanthanatarajan@gmail.com
Middle Level Assignments – Project/Contract Management & Material
Expediting/site Manager /SAP project management

Professional Snapshot
 9 years of cross-functional experience in the areas of:
- Project Management - Procurement/ Vendor Development - Billing &
Finalization
- Supply Chain Operations - Commercial Operations - Port Activities
-Erection &commissioning of Steam Turbine - site management
 Erection and commissioning of Major and minor overhauling and maintenance of steam Turbo
Generator & Auxiliaries systems. Successful track record of leadership and achievement in all
assignments, possesses good knowledge of power plant and mechanical and control systems.
 I had worked in Siemens Limited, Baroda-(Gujarat) as Executive field Engineer -site Project
Management Group.

 Adept in overseeing project activities from conceptualization to execution including technical


specifications, stage inspections, progress monitoring and site management.
 Proven abilities in leading teams towards the achievement of organizational goals.
 Deftness in swiftly ramping up projects in co-ordination with Vendors, Contractors and
Consultants.
 Familiar with basics of Boiler, Power Cycle, Turbine, Generator and Its Auxiliaries.
 Excellent relationship management, analytical and negotiation skills.
 7 Years Experience in Erection and commissioning, Major and minor overhauling and maintenance
of steam Turbo Generator & Auxiliaries systems, successful track record of leadership and
achievement in all assignments, possesses good knowledge of power plant and mechanical and
control systems.

Employment Scan
Siemens India Limited, Baroda since Jan’07 to 2014 June.
Executive Engineer- Project Management ,Field services energy division.(site manager)

Key Deliverables:

 Monitoring & executing projects with  Procuring project material, handling


respect to budgeted cost, demand coordination and follow-up with vendors
forecasts and time over-runs to ensure for various projects.
timely execution of the projects.  External and Internal communications.
 Handling BBU (billing break up),  Performed Post Order Coordination with
handling finalization of same with client Vendors and expedited supply of
and client billing. materials to ensure delivery schedule to
 Reviewing engineering drawings, match with project schedule.
technical specifications, cost estimates,  Coordinated for timely flow of
Contractor's proposals and submittals. engineering documents, certificate tests
 Inspecting field sites to observe & reports and inspection reports between
evaluate facilities and structures. supplier and concerned sections.
 Developing vendors for ensuring timely  Guiding the workforce; imparting
procurement of materials and equipment continuous on-the-job training for
at cost effective prices. accomplishing greater operational
efficiency.
Notable Credits:

 Successfully managed the complete supply of mechanical packages and accessories required in
various balance of plant areas.
 Effectively interfaced with Consultant & Internal Departments for submission & approval of
quality assurance plan, GA / SLD, drawing, documents, data sheets, etc. from customer.
 Instrumental in handling the procurement of Import Equipment for various packages.
 Actively involved in opening LC, getting Essentiality Certificate from client, finalizing Logistic
Contractor and steering the clearance of equipment from Custom House.
 Efficiently handled the port activities and monitored the penalty exposures.
 Significantly handled Commissioning Activities at site.
 Instrumental in controlling & handling the authorization of damage and discrepancy reports.
 Well experienced in Alignment works of Low speed and High speed BOP Rotating equipments in
power plant such as ID,FD Fans,CW pumps, Feed water pump etc,and experienced in
manufacturing and assembly of turbine,Generator,Condenser,oil pump systems.
 Erection and commissioning of procurement operations, Steam piping and support of both
IBR&NIBR.
 Played a pivotal role in preparing BBU & MIS report including material cost statement, turn over
sheet, plan vs. actual progress of vendor work, etc.
 Vendors Handled: M/s L&T,TDPS, Triveni, Enpro, Southern Lubrication, Steel Strong, Sulzer
Pump, KSB Pump, Switzer, ABB, Parker etc.
 Actively involved in ensuring that imported materials like Boiler, Turbine and Generators were
sold to client on High Sea Sale (HSS) basis and avoided any additional levy of custom duty or
demurrage on imported material.
Site work records in Siemens ltd: (site manager)
 Erection and commissioning of 1x5.5 mw set TENKE FUNGURMME MINNING .DRC Congo with
FMI.(Freeport-mc Moran)
 Erection and commissioning of SBQ 2X45 mw set,Nellore-India.
 Erection and commission of Madras cement2x40,Ariyalore,Tamilnadu.
 Erection and commissioning of MSP Steels 1x35,Raigarh,India.
 Erection and commissioning of Ponnisugar 1x20 mw set -Erode.
 Erection and commissioning of Dalmiya cement 1x27 mw set-Ariyalur.

Project Engineer &Document control Engineer in PEI-Plant Electralical and


Instrumentation pte-ltd-Singapore- 2014 Aug to Till now.

 Erection and commissioning of Evonik projects under M+W group.(SOAPE-Singapore oil additive
plant-Jurong Island)-Singapore.

Professional Enhancements
 Training Course  Company  Duration  Year

 Power Plant Equipment & Systems-Several


 Siemens
programmes and classroom sessions, on-the-job 1 week  2007
Limited, Baroda
Training, seminars and workshops.

 Hi Tech Training
 AutoCAD-2D 1 Weeks  2008
Centre, Baroda
 Siemens Ltd,
 Training on PRIMAVERA 15 Days  2011
Baroda
 Induction Level Training on Risk Management in  Siemens
2 Days  2008
Project Management Limited,Worli
 Programme on Positive Thinking, Personality  Siemens
1 days  2009
Development & Attitude Awareness Limited,Worli
 Siemens Ltd,
 Training of Finance for Non Finance People 1 days  2013
Baroda
 Siemens
 IMS Audit Training Limited,Barod 3 days  2014
a
 Training for team Management Skills  Siemens 2 days  2012
ltd,Baroda
 Training on “Basic Element of safety(SCC Based)  Siemens
1 Days  2009
at Siemens ltd ESSO HSE Board,Baroda. ltd,Baroda.
 Online Training on “Business conduct guidelines”
 Siemens
from Siemens corps,legal and compliance Yearly  yearly
ltd,Baroda.
Board,Germany.

Scholastics
 Diploma in Electrical and Electronics Engineering (Padaleshwar polytechnic, cuddalore), 2001-
2004.
 Post Diploma in Thermal power plant Engineering (Ministry power Training institute
Neyveli),2004 .
 Bachelor of Technology (Electrical and Electronics Engineering) from sadguru university
Hyderabad 2009 to 2012)–Distance Education.

Technical Skills:
 SAP (MM Module) for project Management and project technical module, Auto CAD and MS
Project, work flow management.
 MS Office and Internet Applications.

Examinations&Certificates
 FS04_SST-200/300/400 Steam Turbine.(Siemens machine )
 First Aid.
Personal Dossier
Name : K.Natarajan
Date of Birth : 05th March, 1980
Nationality : Indian
Address :54, car nagar,Chennai.600011
Cell phone :+9487922521
E-mail : samanthanatarajan@gmail.com
Passport Number: G1239748
Languages : English, Tamil, Hindi .

Declaration:

I here Declaration that details provided above are true to the best of my knowledge and I assure
you that ,I will render my services to the satisfaction of my superiors and for the growth of the
organization.

Place: chennai K.NATARAJAN.