350445
GENERAL
SIP GUIDE – MRS. MOUMITA SHARMA
VEGA CONTROL PVT.LTD
GUIDE – MR. UMESH AWAGHAD (ASSISTANT MANAGER)
I will be getting the project topic and project detail most probably on 18th
April.
on 2nd, I come to know about the ERP system of the Vega Control Pvt.Ltd
Tuesday which is design by Vega IT team. All the data employee data, project reports,
17/4/18 project process, weekly task, monthly project detail which is linked with all the
departed as the project required intervention of all the department (finance,
marketing, operations).
On the 3rd day of internship, as it was decided earlier I had a meeting with
Mr. Dixit (Project Consultant). He proposed a project about WORK STUDY
& TIME STUDY on manufacturing and wiring of control panel. Where I
need to identify the processes of wiring in control panel manufacturing
keeping the cycle time, function activity sequence, sub-sequence, resource,
Wednesday man power and after having the brief idea of the process. I need to suggest the
18/4/18 improvement to increase the efficiency and effectiveness of the process.
PROJECT TOPIC
“STUDY OF CONTROL PANEL MANUFACTURING AND
WIRING TO IDENTIFY PROCESS IMPROVEMENT TO
INCREASE EFFICIENCY AND EFFECTIVENESS”
OBJECTIVE
Objective of the project is to observe the process and have the brief
detail of the wiring process of the control panel, in which all the
requirement of sources, time cycle activity sequence observed.
Detailed study of work and time to identify the process improvement
for increasing the efficiency and effectiveness.
Suggestion and recommendation for the process improvement.
Detailed plan of the improved process, where the process planning
will help for future manufacturing.
I started the work where I observed the process of wiring of chassis and
collected the data.
Thursday
19/4/18
I started my work with study on the data (primary data) I had i.e.
requirement for chassis which was collected already in excel.
I gathered some more data of chassis manufacturing and wiring such
as number of man power allotted, time required for chassis of each
type, labors availability for chassis wiring.
Afterwards I arranged all the data and observed the process.
Friday
20/4/18 On the 5th day, I have study on the process wiring of the
manufacturing of the chassis where I have to do the mention the
detailed time study of the process.
I work accordingly where I observed the and detailed down the
information regarding the process and made the report, which was
further discussed with the guide.
Saturday
------------------------------------------------------off-----------------------------------------------------
INTERNSHIP 2nd WEEK
As earlier I observed the chassis design and calculated the cycle time
for the process which was done by the labor of contractor.
Monday Today I need to do the same i.e. to observe and calculate the cycle
23/4/18 time of the detailed process which is done by Vega’s labor.
Then I need to note design the process, its requirement and the cycle
time in excel sheet and make the report regarding the better utilization
of the process.
And to note the process and cycle time of Dc drive above 350kw.
As earlier I have studied and observed the cycle time and processes of
Wednesday DC drive (200- 350 kw and above 350 kw), now I need to study the
25/4/18 cycle time and operational process of the remaining DC drive.
1. Dual DC drive
2. Shear DC drive
Both DC drive have similar process with change in some parameter
and the cycle time of both the drive is different from each other.
Where I have studied all the AC drive process and noted the cycle
time of the operation.
Friday After studying the wiring processes and cycle time of the AC drive
27/4/18 and DC Drive.
There is two kind of panel remaining which Servo plus Drive and
Servo today, I completed both panel process wiring and process cycle
time.
Saturday
------------------------------------------------------off-----------------------------------------------------