Beruflich Dokumente
Kultur Dokumente
PERFORMANCE BOND
INSURANCES
SETTING OUT
CPM PROGRAMME
PROJECT SIGNBOARD
BQ1/A/1
BILL NO. 1 - PRELIMINARIES AND GENERAL
Carried to collection
WORKING AT NIGHT
PHOTOGRAPHS
PROGRESS REPORT
C
The Contractor shall prepare and submit site dairy for the
works to be signed by both the contractor's repsentatives and
L.S
S.O. repsentatives. The contractor shall allow for making
copies of these reports for distribution to all parties concerned
F
Allow for cost incurred includes fees or charges etc. payable to
the relevant Authorities for the diversion (permanent or
LS
temporary) of water mains, TNB cables, telecom cables, sewer
pipes and any other public utilities as instructed by the S.O.
ROAD MAINTENANCE
BQ1/A/2
BILL NO. 1 - PRELIMINARIES AND GENERAL
Carried to collection
TNB CONTRIBUTION
LEVY TO CIDB
PROFIT IN ATTENDENCE
L Boiler L.S
Others:
………………………………………………………….
………………………………………………………….
………………………………………………………….
BQ1/A/3
BILL NO. 1 - PRELIMINARIES AND GENERAL
Carried to collection
COLLECTION
BQ1/A/1
BQ1/A/2
BQ1/A/3
BQ1/A/4
BILL NO. 1 - PRELIMINARIES AND GENERAL
CARRIED TO SUMMARY :
BQ1/A/5
AMOUNT (RM)
BQ1/A/6
AMOUNT (RM)
BQ1/A/7
AMOUNT (RM)
BQ1/A/8
AMOUNT (RM)
BQ1/A/9
AMOUNT (RM)
BQ1/A/10