Length 22.5
Height 0.425
Area 9.56 Area Input
TotalArea 0
A1 9.56
A2 55.03
A3 53.25
TOTAL NUM 1474
Breakage 5%
Total 1548 pcs 6"CHB
FOOTING
DESCRIPTION F-3
LENGTH 1.90 m
CLEAR COVERING 0.075 m
LENGTH PER SET 1.75 m
LENGTH OF RSB 6.00 m
11
BAR X
BAR Y 11
NUMBER OF SETS 3
COUNT 6
@X BAR 66 PCS.
@YBAR 66 PCS.
TOTAL NUMBER OF
SETS 132 SETS
TOTAL NUMBER OF
PCS. 44 PCS. 16 mm dia. x 6 m RSB GR. 60
SLABS
DESCRIPTION S-1
LENGTH 4
WIDTH 4
THICKNESS 2
AREA 32
PERIMETER 8
LAPPING 0.50
LENGTH OF RSB
LENGTH 4.50 m
WIDTH 2.50 m
AREA 11.25 sq.m
S/L 0.56
SLAB TYPE TWO-WAY SLAB
LENGTH OF RSB 6.00 m
AVERAGE SPACING 30.00 cm
FACTOR 1 1.595
FACTOR 2 0.09
COUNT 5
NO. OF BARS/ PC. 90
NO. OF TIE WIRE/ KGS. 5.06
GROUND FLOOR
SLABS
DESCRIPTION Slab on Fill (GF)
LENGTH 22.50 m
WIDTH 9.50 m
SETS OF WIDTH 58
SETS OF LENGTH 25
LENGTH OF SLAB 6.00 m
PCS. PER SET (WIDTH) 2
PCS. PER SET (LENGTH 4
NO. OF PCS. (WIDTH) ###
NO. OF PCS. (LENGTH) ###
NUMBER OF
INTERSECTIONS 1450.00 Intersections
LENGTH OF WIRE 0.30
STAIR
FOR STAIR SLAB
Horizontal Length 5.48 input
Horizontal Spacing 0.20 input
No. of Sets 29 output
2
No. of RSB 15
Vertical Length 2.20 input
Vertical Spacing 0.120 input
No. of Sets 19
1
No. of RSB 19
No. of Intersections 551
Horizontal Length' 0.67 input
Horizontal Spacing 0.20 input
No. of Sets 5 output
2
No. of RSB 3
Vertical Length 2.20 input
Vertical Spacing 0.120 input
No. of Sets 19
6
No. of RSB 4
No. of Intersections 95
BEAMS
DESCRIPTION 2B-1A OPTION
LENGTH 3.23 m PROVIDED
WIDTH 0.15 m PROVIDED
HEIGHT 0.40 m PROVIDED
COUNT 1 PROVIDED
FORMWORKS 0.05 OPTION
VOLUME 0.20 cu.m. PROVIDED
CLASS A OPTION
CEMENT 0.20 bags PROVIDED
GRAVEL 1.40 bags PROVIDED
SAND 0.10 bags PROVIDED
DESCRIPTION C1 OPTION
LENGTH 0.35 PROVIDED
WIDTH 0.35 PROVIDED
HEIGHT 7.98 PROVIDED
COUNT 6 INPUT
FORMWORKS 0.05 OPTION
VOLUME 6.16 PROVIDED
CLASS AA OPTION
CEMENT 58.52 PROVIDED
GRAVEL 6.16 PROVIDED
SAND 3.08 PROVIDED
AREA ###
CLASS A
THICKNESS 12 mm
CEMENT 47 bags
SAND 3 cu.m
LENGTH(1) 23.70 m
LENGTH(2) 11.50 m
SPACING 0.6
41 SET OF L1
21 SET OF L2
471.5
497.70
TOTAL 969.20
LENGTH OF JOIST 3m
324 pcs
DESCRIPTION 2B-1A OPTION
LENGTH 3.23 m PROVIDED
WIDTH 0.15 m PROVIDED
HEIGHT 0.40 m PROVIDED
COUNT 1 PROVIDED
FORMWORKS 0.05 OPTION
VOLUME 0.20 cu.m. PROVIDED
CLASS A OPTION
CEMENT 1.40 bags PROVIDED
GRAVEL 0.20 cu.m. PROVIDED
SAND 0.10 cu.m. PROVIDED
DESCRIPTION F-3 option
LENGTH 1.90 m provided
CLEAR COVERING 0.004 m option
LENGTH PER SHEET 1.89 m provided
LENGTH OF RSB 6.00 m option
BAR X 11 provided
BAR Y 11 provided
NUMBER OF SETS 3 provided
COUNT 80 input
AT X BAR 880 PCS. provided
AT Y BAR 880 PCS. provided
TOTAL NUMBER OF SETS 1760 SETS provided
TOTAL NUMBER OF PCS 587 PCS. 16mm dia. x 6 m RSB GR. 60 provided
DIAMETER
DIMENSION
DIAMETER
ROOFIN MATERIALS (dos agwas)
INPUT LENGTH 23.7m
INPUT HYPOTENUSE 6.5m
OPTION SPACING OF PURLINS 0.7m
OPTION LAPPING 34m
OPTION LENGTH OF ROOFING 2.4m
OUTPUT QUANTITY OF ROOFING 6pcs.
INPUT PERIMETER OF RIDGE ROLL 45m
OUTPUT QUANTITY OF PLAIN G1 SHEET 11pcs.
INPUT PERIMETER OF FLASHING 90m
OUTPUT QUANTITY OF PLAIN G1 SHEET 2pcs.
INPUT PERIMETER OF GUTTER 23m
OUTPUT QUANTITY OF PLAIN G1 SHEET 5pcs.
OUTPUT MULTIPLER 18
OUTPUT # OF RIVETS 108pcs.
ROOF
Area (Total) 280.20 sq. m. input
L 8 input
W 4 input
Th 0.25 input
Area of Plywood 2.88
Area (Interior) 213.75
No. of PCS. 75 pcs. of 8' x 4' x 1/4''
Area (Exterior) 66.45
No. of PCS. 24 pcs. of 8' x 4' x 1/4''
Total No. of PCS. 99 pcs. of 8' x 4' x 1/4''
CEILING
L1 23.70 m input
L2 11.50 m input
Spacing 0.60 input
No. of Sets for L1 41 input
No. of Sets for L2 21
No Lapping (L1) 471.50 m
No Lapping (L2) 497.70 m
Commercially Avail. 3m
TOTAL 969.20 m
TOTAL for Comm. Avail 323.07 m
FRAMING VENTILATION
Perimeter 3.25 input
No. of Airvents 10
Perimeter per air vent 32.50 m
L 3 in. input
W 1 in. input
Th 12 ft. input
Th. Eq. per meter 3.60 m.
No. of PCS. 9 pcs. 3'' x 1'' x 12' Framing
By Boardfoot 27 bd. ft. 3'' x 1'' x 12' Framing
WOOD VENT
Perimeter 7.05 m input
No. of Vents 10 input
Perimeter per No. vents 70.5 m
L 1 in.
W 1 in.
Th 12 ft.
Th. Eq. per meter 3.60 m
No. of PCS. 20 pcs. 1'' x 1'' x 12' Wood Vent
By Boardfoot 20 bd. ft. 1'' x 1'' x 12' Wood Vent
INSECT SCREEN
TOTAL Length of Comm. 0.90 m input
Available
Meters Per Length 0.30 m input
Length 4.70 m input
No. of Airvents 10 input
No. of Sets 3 sets
STAIR
FOR STAIR SLAB
Horizontal Length 5.48 input
Horizontal Spacing 0.20 input
No. of Sets 29 output
2
No. of RSB 15
Vertical Length 2.20 input
Vertical Spacing ### input
No. of Sets 19
1
No. of RSB 19
No. of Intersections 551
Horizontal Length' 0.67 input
Horizontal Spacing 0.20 input
No. of Sets 5 output
2
No. of RSB 3
Vertical Length 2.20 input
Vertical Spacing ### input
No. of Sets 19
6
No. of RSB 4
No. of Intersections 95
Plain GI Sheet GA
26 (Flashing) Piece ₱580.00
Plain GI Sheet GA
26 (Gutter) Piece ₱580.00
Plain GI Sheet GA
26 (Ridge Roll) Piece ₱580.00
Roofing Nails Kilo ₱60.00
Sagrods (10mm) Piece ₱17.00
Welding Rod Kilo ₱75.00
3. Plumbing Pipes and Fittings
Clean Out Piece ₱480.00
Concrete Drain
Pipe Piece ₱1,200.00
Coupling
3"⏀ Piece ₱35.00
Double Tee Wye Piece ₱75.00
Elbow Plain
1/2 " Piece ₱10.00
3/4 " Piece ₱12.00
3" Piece ₱50.00
Elbow w/ Thread
1/2 " Piece ₱12.00
3/4 " Piece ₱15.00
3" Piece ₱52.00
75 mm Ø
Orange 1/4 Piece
Bend ₱50.00
Galvanized Iron
Cold Water Riser Piece ₱375.00
(SCH. 40);
12mmØ
Polyvinyl
Chloride
Downspout;
75mmØ Piece ₱280.00
Polyvinyl
Chloride Soil
Pipe; 100mmØ Piece ₱380.00
Polyvinyl
Chloride Vent Piece ₱160.00
Through Roof;
50mmØ
Polyvinyl
Chloride Vent Piece ₱160.00
Through Wall;
50mmØ
Tampered Proof
Duplex
Convenience
Outlet, Grounding Piece ₱170.00
Type 16 Amps,
250 Volt w/
Modern Plate
Cover
Three Gang
Switch with Piece
Cover ₱254.00
W-1: Steel
Casement with Piece ₱4,738.00
Clear Glass
Blades on
Standard
Aluminum Casing
(aluminum
folding window)
W-2: Steel
Casement with
Clear Glass Piece ₱3,500.00
Blades on
Standard
Aluminum Casing
and Fixed Clear
Glass (aluminum
sliding window)
W-3: 1 - Panel
Steel Casement Piece ₱1,430.00
Window
W4- Steel Awning
with Fixed Clear Piece
Glass ₱800.00
7. Painting Materials
Acrylic Latex
Paint
CIVIL ENGINEER
per day (beginners rate) Supervision and PHP 850
computation of construction
materials
MATERIAL 5,346.12
LABOR 1,603.84
DIRECT COST 6,949.96
MARK UP 1,389.99
VAT 1,000.79
TOTAL COST 9,340.74
UNIT COST 401.86 /cu.m
MATERIAL 9,600.00
LABOR 2,880.00
DIRECT COST 12,480.00
MARK UP 2,496.00
VAT 1,797.12
TOTAL COST 16,773.12
UNIT COST 524.16 /cu.m
MATERIAL 58,668.96
LABOR 17,600.69
DIRECT COST 76,269.65
MARK UP 15,253.93
VAT 10,982.83
TOTAL COST 102,506.41
UNIT COST 2,247.95 /cu.m
MATERIAL 184,209.10
LABOR 55,287.03
DIRECT COST 239,496.13
MARK UP 47,899.23
VAT 34,487.44
TOTAL COST 321,882.80
UNIT COST 7,058.83 /cu.m
MATERIAL 157,201.50
LABOR 47,160.45
DIRECT COST 204,361.95
MARK UP 40,872.39
VAT 29,428.12
TOTAL COST 274,662.46
MATERIAL 32,166.00
LABOR 9,649.80
DIRECT COST 41,815.80
MARK UP 8,363.16
VAT 6,021.48
TOTAL COST 56,200.44
UNIT COST 84.05 /sq.m
MATERIAL 173,451.50
LABOR 52,035.45
DIRECT COST 225,486.95
MARK UP 45,097.39
VAT 32,470.12
TOTAL COST 303,054.46
UNIT COST 2,196.52 /sq.m
TOPIC: COST2"ESTIMATE
x 4" x 2 mm C-PURLINS 40 pcs. 640.00 25,600.00
MATERIAL 33,700.00
LABOR 10,110.00
DIRECT COST 43,810.00
MARK UP 8,762.00
VAT 6,308.64
TOTAL COST 58,880.64
UNIT COST 781.64 /sq.m
I. ROOFING MATERIALS 75.33 sq.m.
CORRUGATED GI. SHEET GA 54 sheets 580.00 31,320.00
CORRUGATED GI. SHEET GA 8 sheets 460.00 3,680.00
FLASHING PLAIN GI. SHEET 9 pcs. 580.00 5,220.00
PLAIN PVC PIPE 3"⌀ PVC P 10 pcs. 200.00 2,000.00
ELBOWS 3"⌀ PVC PIPE 12 pcs. 50.00 600.00
RIDGE ROLL GI SHEET GA. 2 pcs. 127.00 254.00
ROOF NAILS 10.00 kgs 60.00 600.00
COUPLING 3"⌀ PVC PIPE 8 pcs. 35.00 280.00
MATERIAL 43,954.00
LABOR 13,186.20
DIRECT COST 57,140.20
MARK UP 11,428.04
VAT 8,228.19
TOTAL COST 76,796.43
UNIT COST 1,019.47 /sq.m
MATERIAL 26,935.00
LABOR 8,080.50
DIRECT COST 35,015.50
MATERIAL 32,276.00
LABOR 9,682.80
DIRECT COST 41,958.80
MARK UP 8,391.76
VAT 6,042.07
TOTAL COST 56,392.63
UNIT COST 3,012.43 /sq.m
MATERIAL 27,102.68
LABOR 8,130.80
DIRECT COST 35,233.48
MARK UP 7,046.70
VAT 5,073.62
TOTAL COST 47,353.80
UNIT COST 11,838.45 /pcs
MATERIAL 40,198.40
LABOR 12,059.52
DIRECT COST 52,257.92
MARK UP 10,451.58
VAT 7,525.14
TOTAL COST 70,234.64
UNIT COST 145.58 /sq. m
MATERIAL 26,375.00
LABOR 7,912.50
DIRECT COST 34,287.50
MARK UP 6,857.50
VAT 4,937.40
TOTAL COST 46,082.40
UNIT COST 4,608.24 /pcs.
MATERIAL 71,628.04
LABOR 16,114.88
DIRECT COST 87,742.92
Php 1,619,077.83
MARK UP 0.20
VAT 0.12