EXPENDITURE to be met from Head Year of _

Sub-head--------

THIS CONTRACT is made on the day of 20 _

BETWEEN

THE GOVERNMENT OF MALAYSIA (hereinafter referred to as "the Government") of the one part;

AND

--------------~--------'-- (hereinafter referred to as "the Contractor''), [a


company incorporated in Malaysia under the Companies Act 1965 (Com. No. ) ] with its

registered office at----------------------------- of


the other part.

(The Government and the Contractor shall hereinafter individually be referred to "Party" or collectively as the
"Parties")

WHEREAS

A. The Government is desirous of obtaining the design, construction, equipping* and maintenance*
of
----------------------------------
# (hereinafter referred to as the Works') at
for which Works the Government has issued to the Contractor its
requirements and instructed the Contractor to design the Works and to submit proposals.
including drawings and specification for carrying out the Works.

B. The Contractor has examined the site and has submitted proposals including drawings and
specification for carrying out the Works.

C. The Contractor has made an estimate of the sum which he will require for carrying out that which
is necessary for completing all the Works in accordance with the Conditions of Contract and has
submitted an analysis of that sum (hereinafter referred to as 'the Contract Sum Analysis').

D. The Government has examined the Contractor's Proposals and the Contract Sum Analysis and
subject to the Conditions of Contract, is satisfied that they appear to meet the Government's
Requirement.+

* Delete if not applicable


# State the title of intended-works. .
+ Where the Government has accepted a divergence in the. Proposals submitted by the Contractor ·
from. the Government's Requirements, the divergence should be effected by deletion or substitution
in the Government's Requirements before the contract documents are signed. ·