Beruflich Dokumente
Kultur Dokumente
FIRM INFRASTRUCTURE
Findings/Observations Concerns Recommendations
Inadequate and inefficient Firms, especially those Advocate for improved
port infrastructure and who rely on inter-island shipping facilities through
facilities due to existing shipping, may experience the Philippine Shippers
maritime policies higher cost and damages Council, CDPEAP and
to goods. Philippine Exporters'
Confederation Inc.
Shipment cost is high High shipment rates are Advocate for more
additional costs for both competitive inter-island
manufacturers and buyers. freight rates through the
Philippine Shippers
Council, CDPEAP and
Philippine Exporters
Confederation Inc.
INBOUND LOGISTICS
Human Resource Management
Workers lack skills on Lack of QC skills leads to Industry-wide standards on
Quality Control of raw defects and product raw materials quality can
materials rejects further down the be set up and appropriate
value chain. training programs
developed.
Materials sourcing and There is still considerable The industry can tie up
development among firms time and effort spent on with TESDA on training
still need improvement materials sourcing and programs for materials
development. sourcing and development
The present level of Wastage in raw materials Develop standards for raw
materials handling skills is adds to the cost of the materials handling and
still insufficient leading to product, leading to higher allowable wastage and
wastage. prices or reduced income. train workers on proper
methods of materials
handling.
There are wide variations Rejects and rework of Tie up with TESDA on
in the quality of work components from having a continuous
from subcontractors due to subcontractors causes training program on basic
insufficient skills and know delays as well as added production skills for
how. cost. subcontractors and their
workers
Background
Value Chain Analysis 57
OPERATIONS (cont'd)
Findings/Observations Concerns Recommendations
Human Resource Management (cont'd)
Firms normally lose some Losing trained workers in The industry can develop
of their workers during the lean season leads to common training programs
the lean season added cost later when for firms who need to
new workers are hired and augment their work force.
trained to help out during Over the long term, firms
the peak season need to develop the local
market to help even out
demand and work during
the year.
There are designers who Manufacturers need to Firms can encourage their
lack knowledge on design products that are designers to study
material properties, not only innovative but materials properites and
processing and limitations. can be produced production processes.The
efficiently. industry can work with
PDDCP to set up a training
program on this area.
Techn ology Development
Quality management Worker based QC systems The industry can engage
systems among firms are can lead to variations in industrial engineers to
usually worker based and quality assurance. document and standardize
manual. quality control practices
into a more systematic
process. Encourage the use
of tools in QA work.
Firms lack access to This inadequacy causes Link CDPEAP members to
modern machines and low productivity and Original Equipment
processing know-how. higher cost. Manufacturers Association
of the Philippines
(OEMAP), other equipment
suppliers, industrial
engineers from
universities and R & D
centers.
Maintenance of tools and This can result to Link CDPEAP and its
equipment is generally production downtime and members to equipment
reactive. shorten useful life of suppliers that can provide
equipment. orientation on the
maintenance of tools and
equipment.
A significant percentage of Unit cost of production Facilitate exposure of
costs can be traced to becomes higher than that firms to best practices in
wastes by inappropriate of competitors because of production both here and
processes. such inefficiencies. abroad.
60 State of the Sector Report - Philippine Holiday Décor
OPERATIONS (cont'd)
Findings/Observations Concerns Recommendations
Procurement
Firms buy locally Inappropriate tools result The industry can undertake
fabricated tools, which to higher production cost a research project to
can be of inferior quality. locate tool and equipment
suppliers whose productgs
conform to international
standards and link CDPEAP
and its members to such
suppliers.
OUTBOUND LOGISTICS
Human Resource Management
Findings/Observations Concerns Recommendations
Workers lack skills on Lack of knowledge and Link industry to PTTC for
managing the distribution skills in distribution lead to assessing training needs of
network inefficiencies and low workers in network
productivity. distribution and work out
appropriate training
program.
Technology Development
Firms have not maximized Inefficient outbound The industry can search for
the use of information processess lead to higher an appropriate package of
technology to streamline cost and lower software programs and
outbound activities. productivity. systemdesign for
improving firms' outbound
processes.
MARKETING
Findings/Observations Concerns Recommendations
Human Resource Management
Marketing personnel lack Trade fair experience in Companies can provide
exposure to trade fairs the firms are limited to training in trade fairs
since it the owners who the owners and top participation to their
usually go to these events. management. marketing staff. Lower
ranked personnel can be
given exposure in local
fairs.
Marketing staff lack proper Much of the burden on The industry can link with
skills in export costing, marketing products are on PTTC or other training
pricing and negotiations. the owners especially for institutions to train
small firms which may lead workers on required
to some lost market marketing skills.
opportunities.
The use of ICT among Expanded use of ICT in Firms should proactively
industry members for marketing requires new access training programs
marketing is expanding. skills and processes among for their marketing staff
participating firms. on the use of web sites
and ICT in their activities.
Technology Development
The industry association, Participating firms in the The CDPEAP should
CDPEAP, has initiated a marketing web site need continue to promote
web based marketing to be properly equipped awareness on the use of its
program. to handle promotions and marketing web site among
order taking via internet. members and encourage
them to upgrade their ICT
systems and practices.
SMEs have not fully Firms may miss an The industry association
explored participation in opportunity to market can explore an alternative
virtual trade fairs their products at less cost platform like virtual trade
relative to traditional fairs for their members
trade fairs. and report on the
feasibility of such a
venture.
Firms lack access to This limits their CDPEAP can spearhead
product trends and market capabilities to conduct collective efforts to
information materials product and market establish an information
development activities. base for sourcing, product
development, market
trends, etc. for producers
and designers.
Some firms do not have These firms face lmited CITEM can email list of
access to list of buying marketing opportunities importers and buying
offices and importers of and lower sales. offices to CDPEAP, who
holiday décor can upload this in their
website for access by
members.
62 State of the Sector Report - Philippine Holiday Décor
MARKETING (cont'd)
Findings/Observations Concerns Recommendations
Procurement
Sustaining adequate Irregular promotions lower The government, through
promotional campaigns is market awareness of firms DTI and CITEM, can assist
expensive for most holiday and leads to lower sales. holiday decor firms in
decor firms. their promotional efforts.
Information on trade fairs Lack of data on available The industry should work
and bazaars are not readily marketing events hampers with the DTI in compiling
available. market planning of firms. and updating a list of
bazaars and trade fairs for
dissemination to holiday
decor firms.
Companies sometimes Delays in acquiring Firms should take special
experience difficulties in exhibition supplies and effort in planning their
procuring exhibition materials can lead to rmarketing events so that
supplies on time. higher cost or loss of acquisition of needed
market exposure. materials for exhibitions
are done early.
SERVICE
Human Resource Development
Sales staff of most firms Buyers are lost when Firms should send their
lack skills in handling merchandise complaints workers to seminars on
customer complaints. are not properly handled post sales services to
buyers and update such
skills regularly.
Technology Development
Some firms do not have a These firms find it difficult Use a database to record
systematic record of to assess nature of and monitor product
causes of rejects and complaints which could defects and buyers'
buyers' complaints. lead to improved complaints. Review
performance. database content with a
marketing specialist to
devise remedial or
preventive measures for
future buyer complaints.
Handling customer Communications cost Firms should seek out
complaints, especially for become high for the alternative means of
foreign buyers, entails manufacturer which communications such as
much communications and reduces income. VOIP to reduce cost.
even meetings.
Background
Value Chain Analysis 63
SERVICE (cont'd)
Procurement
Contacting suppliers for Firms are not readily able Set up a database of
replacements of defective to act on buyers' accredited suppliers to
components or products complaints to replace reduce incidents of
takes time and effort. defective merchandise replacements due to poor
when suppliers cannot be quality of work. Update
contacted immediately. database regularly to
ensure updated contact
data of suppliers.