Sie sind auf Seite 1von 13

The Magazine for our Customers and Friends 60

PM 3582 GB
Contents Latest News
2

Latest News
4 M 32 fights major fire 12

3 M 32 fights major fire

PM greetings cards
For three years now, the M 32 truck-
mounted concrete pump belonging to the
ready-mix company BERDING-BETON
support UNICEF projects
(Steinfeld) has been a firmly integrated
item in the resource planning of Vechta fire
Title Stor y brigade for the Osnabrück region. And only
just recently, the concrete boom was able
to demonstrate its valuable features in
4 Extensive concreting for a
complex bridge construction fighting a major fire in Dinklage.

Although the 17 fire brigades from the


Vechta area and the neighbouring Artland
International totalling 59 vehicles were quickly on the
scene of the fire – an approximately

7 Afghanistan:
Building a new university
3 4 9 4,000 m2 hall complex – the working area
of the two turntable ladders used was not
7 8 20 sufficient to cope with the situation alone. Photo: Police Oldenburg

10 Great Britain:
Service-directed for more than 30 years
The operation controllers therefore made a
quick decision to send for the additional
13

help of the Putzmeister BRF 32.16 H

13 Italy:
No time for a coat of paint!
belonging to the BERDING-BETON
company. Within a mere 15 minutes, the
truck-mounted concrete pump was convert-
14 Poland: Warsaw pump service concreting
“Golden Terraces building complex”
ed into a highly flexible fire-fighting boom
as two firemen replaced a section of the
delivery line downstream of the pressure
20 France:
The land of the rotor fans
pipe of the truck-mounted concrete pump
with a delivery line bend fitted with an
adaptor to the fire brigade’s coupling
5 6 10 system. A collective connection to accom-
Domestic modate the two B-water hoses was also
10 14 18 added. The end hose was removed from the
tip of the boom and replaced with a so-
8 Compact 4-section boom features
numerous strong advantages called S8 foam pipe using a coupling.
Concrete pump operator, Franz-Heinrich
Photo: Holger Bokern

22 Formwork dismantled just three days follow-


ing placement of high-strength concrete
Ritterhof, then directed the articulated
boom by radio remote control over the seat
of the fire. During the fire-fighting ope-
the boom tip to where it was needed.
Christian Katzer, a fitter at BERDING-

23 One-side support on
narrow Neckar weir
rations, foam was used to extinguish the
fire, instead of water. The foam was
BETON and fire chief of the Steinfeld fire
brigade involved in the operations: “The
provided from a tank fire truck which fed boom of a concrete pump is well suited for
up to 2,400 litres per minute to the delivery fire-fighting operations. It is easily convert-
Applications line of the truck-mounted concrete pump. ed for the job without having the firemen
As pump operator Ritterhof was controlling standing in the real danger areas!” By the
Universal pump for shotcrete job the boom from ground level and the view way – if a nozzle is connected to the boom
24 7
from above was restricted to the seat of the
fire, his mates from the fire brigade had to
tip instead of the S8 foam pipe and only
fire-fighting water is sprayed, then the
improvise. From two higher observation reach with this combination of fire truck

Tunnel Construction 13 posts (a tree and a retractable ladder), they


actively and energetically helped to guide
and concrete pump boom is up to 70 m!

18 Sika®-PM wet spraying systems


back up tunnel advance work along the
8 11
PM greetings Unlike in the past, Putzmeister AG will not
be sending Christmas and New Year cards
Mediterranean Highway
22 23 of its own design this year to its business

Practical Tip cards support partners but will be using UNICEF greet-
ings cards instead. UNICEF has been
selling the cards for many years and using

19 Mess-free formwork UNICEF projects the income to support numerous projects in


countries where it is most needed. For
example, the sale of 500 cards will finance
the equipment required in a complete
village hospital ward. Putzmeister hopes
the change will meet with the approval of
its customers and friends and would be
happy to learn that they liked the cards.

2
PM 3582 GB
3
PM 3582 GB
Title Stor y

Extensive concreting for a complex bridge construction

The new, 820 m Yahagigawa Bridge has a three-lane carriageway in each direction of travel. Its impressive architecture is visible from afar. 14

15 16 18
Currently under construction in Japan is principals JAPAN HIGHWAY PUBLIC without a boom which PM has designed to
the so-called Second Tomei Expressway, CORPORATION to two well-reputed con- deliver concrete through long pipelines
struction companies KAJIMA KENSETSU (i.e. for high pump pressures). The MOLI,
urgently needed to deal with the high Co. Ltd. who is building the Western side which stands for mobile line pump is fre-
volume of traffic between Tokio and and ORIENTARU KENSETSU Co. Ltd. quently to be found in operation in coun-
Nagoya. The new motorway will take who is responsible for the Eastern side. tries in South-East Asia. Already in rod
Construction work commenced in October side operation, the machines in this series
some of the pressure off the present Tomei
2002 and work should be completed by the achieve concrete pressures of 150 bar and
Expressway which connects the two cities. end of 2004. pump flows of 68 m3/h, as does the “ordi-
The new motorway project also involves nary” stationary pump BSA 2110 HP-D
the construction of an 820 m long motor- Simultaneous concreting which, by the way, is designed for concrete
of separate towers pressures up to 150 bar and outputs of up
way bridge to span the Yahagigawa River A systematic diagram of the first phase of construction to 110 m3/h in rod side operation.
– a task which is worth several entries Sub-contractors TYUOU KENSETSU Co. showing the PM high-pressure pumps BSA 2110 HP-D
and BSF 2107 HP. Concrete placement in the towers
in the Guinness Book of Records! The Ltd. (formerly TAKASAGO KENSETSU was made using two RV 10 rotary distributors.
CHUO KENSETSU have connected the
Co. Ltd.) were commissioned to concrete concrete pumps at each of the two towers
most interesting aspect of the work is the
individual sections of the impressive to two type RV 10 mechanical concrete
methods of placing and distributing motorway bridge. The company’s fleet 17 rotary distributors via high pressure-proof
enormous quantities of mostly high- includes more than 20 Putzmeister concrete ZX delivery lines. The concrete distributors
pumps and is one of the largest concrete can be slewed horizontally over a working
strength concrete into the piers of the
pump service providers in Japan. radius of 10 m and in this phase of con-
bridge and on to the formwork for the According to estimations made by the site struction, one was installed to each of the
road surface using stationary and mobile management no locally-manufactured con- tower halves to enable the concrete to be
PM concrete pump units. crete pump would have been able to carry poured as rapidly as possible into the, in
out the concrete installation on this con- parts, very complex formwork sections.
struction site as almost all sections require As construction height increases, only one high-
pressure concrete pump and one concrete rotary
The bridge across the Yahagigawa River is concrete to be pumped to a height of about High-pressure pumps designed to distributor are required for concreting the towers
a cable-stayed bridge resting on two 120 m – and that demands a very high con- deal with 220 bar concrete pressure
towers, which have a drop-shaped cross- crete pressure. All in all, the amount of
section separating into two lattice-trussed concrete required for the towers and the When pressure rose to 130 bar in about
halves at a height of about 11 and 16 m carriageway deck of the Yahagigawa 80 m height, operational mode was switch-
through which a six-lane road is spanned in Bridge is estimated at about 24,000 m3. ed to piston side in both the MOLIs and
the centre of the carriageway. The two the BSA 2110 HP-D. All of the pumps areas of the towers was a concrete pump
structures meet in perfect harmony about Pump service providers CHUO KENSETSU were now able to deliver concrete up to a and a concrete rotary distributor type
84 m above the ground, reaching a height solved the problem by deploying two pressure of 220 bar. This of course, for RV 10. At the end of the placing oper-
of around 121 and 126 m above the found- Putzmeister concrete pumps type BSF physical reasons, reduced the output. ations, the delivery lines were cleaned
ations. The impressive construction height 2107 HP designed specially for high con- Nevertheless, around 170 m3 of concrete using a power-driven high-pressure water
of the Yahagigawa bridge represents a crete pressures and a stationary pump type was placed each day, tantamount to a daily pump which had to be hoisted each time
The MOLI (mobile line pump) is a boom-less truck-
record-breaking project for Japan. The BSA 2110 HP-D. The BSF 2107 HP mounted concrete pump designed by Putzmeister construction height of around 4.5 m. All by a crane up to the site of the concrete
contract for the works was awarded by the (MOLI) is a truck-mounted concrete pump especially for the delivery of high-pressure concrete that was then needed to concrete the upper placement.
through long delivery lines – the two operators are look-

4
PM 3582 GB
ing apparently well satisfied with its performance…
5
PM 3582 GB
Title Stor y International
24
19

Kabul: Building a new


High-strength concrete
for the carriageway

Concreting the carriageway deck was a total-


ly different story for CHUO KENSETSU.
The substructure of the bridge consists of
university by simple means
pre-fabricated box girders on which a 22
carriageway deck rests as a relatively light- In spite of occasional attacks, there is no
weight composite construction. The tensile more stopping the re-building of
strength and flexural strength of the con-
Afghanistan’s capital, Kabul. Following
struction is provided by steel girders. The
reinforcement on top is cast in concrete. our report in the PM POST No. 58 re-
With a width of 43.8 m for the main girder, garding the delivery of a M 36 to the
the Yahagigawa River Bridge sets yet ano- F.C.E.C. company and its building projects,
ther construction record for Japan as does
the distance of 235 m between the two we would now like to present a brief
towers – an impressive performance for the report on the construction of a new uni-
Japanese bridge builders. versity complex. AFGHAN TOOS personnel make sure that the name on
their company sign is clearly visible on one of the walls
MOLI high-pressure pumps TARHE SAKHTE AFGHAN TOOS – an 25
in combination with M 36 booms Afghan-Iranian enterprise is currently con-
structing a modern university centre which
To begin with, two Putzmeister type BSF has been commissioned by Ayatollah
52.15 H heavy-duty boom pumps – one of Mohseni. When work has been completed,
which was mounted on a semi-trailer – up to 4,000 students will be accommodated The RV 10 can be slewed manually and
took on the job of concreting the deck on a campus of 36,000 m2. In addition to is used to place concrete on the floors
formwork on the bridge. The five-arm 50 classrooms, the area will boast a research
folding booms reached as high as the car- centre, a mosque, a library, a cafeteria, a
riageway where they were positioned at a medical centre and residential accommo- pumpable mortars up to 6 mm grain size,
right angle to concrete more than half of dation for the students. In May 2004, by output can be set infinitely variable
the carriageway width in one operation. the way, Afghanistan’s President Hamid (1.5 – 40 l/min) and is used particularly
As work progressed on the carriageway Karzai participated in laying the foundation for plastering jobs.
sections, the process was changed: The two stone for the mosque – which will be one
M 52 heavy-duty booms at the foot of the of the largest in Kabul. In all, work is in During the initial phases of constructing
towers were replaced by two MOLI high- progress on ten buildings varying in size, the carcass, AFGHAN TOOS personnel A PM stationary pump BSA 1005 D is responsible for concrete
delivery on the vast area covered by the university premises
pressure pumps which delivered concrete all of which are planned to be handed over were making the concrete required them- 26
via firmly installed pipelines first horizont- in March 2006 after a two-year construct- selves with the help of a 1 m positive-
Concreting the bridge carriageway. In the centre is a BSF 36.15 H which is only used for distributing the concrete.
ally, then vertically to the M 36 truck- The supply of concrete comes from a pipeline fixed on the spread. The line is connected to the riser pipe of the truck- ion period. action mixer which had to be filled by
mounted concrete pumps on the bridge mounted concrete pump downstream from the reducer (please refer also to the title page of this issue). hand. In this way, they produced about
decks. Efficient and powerful pumps were The construction site is providing a liveli- 4 – 5 m3/hour of concrete and daily perfor-
20 21 hood for more than 200 people. The con- mance averaged at around 45 m3. In the
now required for casting the deck form-
work because of the 60 N/mm3 concrete crete pour for the foundations and the con- meantime, AFGHAN TOOS is supplied
compressive strength. The M 36 by the struction of numerous floors was pushed to with concrete from a newly-built concrete
way was used to distribute concrete and some extent by AFGHAN TOOS by using ready-mix works (capacity 30 m3/h) operat-
not as a relay pump. a new PM stationary pump type BSA 1005D ed by the 2 RC company along the road to
and an RV 10 rotary distributor. The most Jalalabad. The distance to the AFGAHN
important spares and wearing parts of the TOOS construction site is covered by the
BSA concrete pump, the couplings and the truck mixer in about 20 to 30 minutes. That
rubber washers for the delivery line were means that there is now a considerably
safely stored in a container. There is also a greater volume of concrete available which
Putzmeister mortar pump type S 5 EV on inevitably can be pumped and distributed Many of the tools and machines needed for the work by AFGHAN
the construction site where it deals with all more quickly. TOOS came packed in containers from Iran to Kabul. In the fore-
ground, the Putzmeister BSA and the responsible operator
23 27

Number and types


of concrete pumps, provided
by CHUO KENSETSU for
the construction work on the
Yahagigawa Bridge:

1 x BSF 52.15 H
1 x BSS 52.15 H (semi-trailer)
6 x BSF 36.15 H
2 x MOLI BSF 2107 HP
1 x BSA 2110 HP-D
4 x RV 10

6
PM 3582 GB
A systematic diagram of the concreting of the bridge carriageway. As long as the horizontal reach of the two M 52 is long enough, the concrete is installed from
ground level exclusively by means of the long-reach boom pumps (top right), during later construction process supported by the BSA and MOLI high-pressure pumps.
Time-consuming concrete production using a positive-action mixer.
In the meantime, green concrete is brought to the construction site in truck mixers.
AFGAHN TOOS has a good supply of the
most important wearing parts in stock
7
PM 3582 GB
Domestic
30

Compact 28

4-section boom
features numerous strong advantages
In the meantime, many pump service ing operations can really begin, operator The M 28-4 belonging to pump service
companies have supplemented their Roland Bänfer and his mate, Heinrich Gräb providers HÄBEL also has a wide range of
– who is on site today as a reserve man – accessories on board: 125 mm and 100 mm
machine fleet with the compact and uni- have calculated a 30 minute warm-up peri- delivery hoses and pipes for a total of
versally deployable Z-fold M 28-4. Our od to get their M 28-4 “Z-fold” ready for 60 m, 65 mm hoses with a reach of up to
brief report in issue 59 of the PM Post on operation. Then for this job for the Weber 50 m, reducers, a considerable number of
company (turning – drilling – milling), it’s couplings and rubber washers. Nothing is
some of the features might have contri-
not enough just to support the machine left lying around loose on the flatbed –
buted to such a decision being made. The quickly and unfold the boom, the boom everything has its place. Either in magazi-
following report describes the typical must be extended to reach far into the hall nes, in a storage space, on holders or in
advantages of this four-sectioned boom in order to place concrete for a high-load drawers.
bearing foundation for a new metal-work-
with its exemplary weight reserves and ing machine. In order to be able to reach into the further-
decidedly site-compatible support in daily most corners of the floor formwork in the
operations. Furthermore, the special The M 28 four-section boom stands with shop, the 28 m extended boom must be
its long side immediately in front of the lengthened by approximately a further
version of the machine is also equipped
entrance to the machine shop. The working 25 m. The two HÄBEL experienced em-
with the new fuel-saving EOC engine range of the Z-fold boom can be used with- ployees easily and quickly replace the end
speed control. out too great a loss in lateral reach. The hose on the boom tip with a reducer which
arm assembly is lifted, slewed sideways tapers the line diameter from 125 mm to
and placed a little to the rear. Now the 65 mm. In compliance with safety regulat-
The new BSF 28.14 H owned by the con- boom can be unfolded – like a pocket rule ions, the boom tip is placed on the ground
crete pump service company HÄBEL – and then driven to its end position in the and the reducer connected. In just a few
(Siegen) arrives punctually at nine in the shop. It’s really quite amazing to watch minutes, five 65 mm hoses have been con-
morning at the construction site in the how quickly a “Z-fold” boom is ready for nected – and pumping begins at 9.30, a.m..
Netphen industrial park. Before the pump- work! The working range of the M 28 Z-fold boom can be used without too great a loss in lateral reach

29
“With my M 28 pump, not only can I pump 31 32
large quantities of concrete for floor slabs makes it easier for the concreting team,
or floors, but I also frequently work on there’s less concrete residue and it’s easier
smaller construction sites where pumps to clean up afterwards.” According to his
with larger booms cause problems when observations, there are practically no natur-
setting up the machine. Not to mention al deposits of 16 grain size in the Siegerland
renovation sites which of course, are not – in contrast, for example, to the neighbour-
always at the roadside. That means in about ing Ruhr District. “The 16-grain chippings
every third job, it is necessary to extend the we send through the narrow lines should
boom delivery line by attaching additional contain ample fine particles, otherwise we
hoses”, estimates pump operator Bänfer. will quickly have too much wear and tear.”
“Here in the Siegerland, we are confronted In the meantime, most of the mix com-
by conditions that are either narrow, steep panies in his catchment area have changed
or confined. But I am always able to find a over to using fine-grain concrete with 0/8
space for our M 28; I can even set it up chippings for renovation work. “Before I
between the site trailer and the Dixi site begin to place any concrete, I send a few
toilets!” When he mentions needing less 65 mm hoses are easy to handle
buckets of grout through the line and then
space, he is referring to the front diagonal I start the job!” The retro-fitted high-press-
support (support width 6.2 m) and the ure water pump means that cleaning oper- further optimising fuel-saving concrete
almost vertical support legs at the rear ations are dealt with quickly and thorough- pump operations. As soon as the operator
(where the support width is just 2.6 m). ly, even in the big delivery lines. has set a desired output via radio remote
What he also likes is the manoeuvrability control, the EOC fuel management auto-
of the four-sectioned boom which is made The special version of the BSF 28.14 H matically regulates the required minimum
possible by its short wheel base. belonging to HÄBEL is also equipped with r.p.m.. Using EOC not only reduces diesel
the new fuel-saving EOC engine speed consumption in concrete pumps but also
Where smaller quantities of concrete are control. The EOC – or Ergonic Output noise level and, last but not least, wear and
required – although the delivery distance Control – is just one of the extras provided tear in the machines. When required, this
might still be extensive – operator Bänfer by PM in the “Power Kit”. Putzmeister has value can be manually “overridden” to set a
often deploys the 65 mm hoses. “That developed the Ergonic Output Control higher or lower r.p.m. However, fuel is also
(EOC) module as a control system for saved when in “normal operation” mode.

8
PM 3582 GB
The pipelines and connected delivery hoses are
“lubricated” at first using a few buckets of grout
Radio remote control allows pump operator Roland
Bänfer to remain close to the placement site
9
PM 3582 GB
International
33
average length of service over twelve 36
years, but without losing any of the enthu-
siasm. Mick Ferguson the Service Manager
has been with Putzmeister from the begin-
ning, and still finds new challenges, still
gets excited by talking a customer through
a problem, still looks for ways to improve
the service his team provides and how it
isdelivered. PMUK invest in training and
forward planning to ensure this fund of
knowledge and practical experience of the
machines, applications and operations is
secured for the future.
By Austin Quier,
managing director Putzmeister Ltd., How PMUK performs is dependant on the
Chesterfield entire team, and those behind the scenes
are every bit as important in delivering
quality to the customers. This culture has
been reinforced in the systems and

Thirty
structure already developed to achieve
certification for BS EN9001-2000.
Thirty years ago, PMUK consisted of just one office and one storeroom – the company moved into this new building
in 1981 Strengths built on differences

It can come as no surprise that, as in


other aspects of life, the UK market for

years of service Putzmeister products does not always


follow the European norm. As a conse-
quence it has been necessary to innovate,
look for alternative markets and new
applications.

2004 marks thirty years of Putzmeister’s The beginnings were certainly humble, just Chesterfield, where the current premises This has helped to make PMUK more
direct presence in the UK and Ireland, two small rented buildings one in which were built in 1981. responsive to market requirements, and has
the first pumps were assembled, the other resulted in a number of successes over the
and it is a good moment to reflect on used as stores and offices. People matter years. The City Pump concept of a small
the record of Putzmeister Ltd, known mobile concrete pump was conceived in
within the Putzmeister Group as PMUK. Over a period of six years more buildings Whilst the buildings are important PMUK 1986, and in 1987 the first units were
were rented to accommodate the growing is about commitment to supplying quality assembled in Chesterfield with 16 m boom
To assess how they have arrived where
demand. This may not have been a glamor- products, and about people with a commit- and 1005 pump mounted on a 13 t chassis.
they are today, and how the company ous start, but it established the culture of ment to providing the best for their cus- Initially this model attracted a number of
can continue to develop in the future. financial strength and self-sufficiency that tomers, not always succeeding, but willing new operators into the pumping market,
has become a hallmark of PMUK, and pro- to learn, and come back stronger for the and has evolved over the years until small
vided the resources to acquire the site in experience. PMUK can take pride in an concrete pumps now feature in most UK
In compliance with the requirements of the British market, Putzmeister developed the City concrete pump series

The team (well, almost all of them) of the English PM subsidiary 34 35


pump hire fleets. The BSA1005 D –
Primera trailer mounted concrete pump is
an example of responding to specific
customer needs, and through co-operation
developing a new model. This simple,
robust unit was introduced in 1998, and has
gone on to form the backbone of
Putzmeister trailer pump sales in the UK.

As with all Putzmeister products this


model is subject to continuous develop-
ment to take advantage of new technology
and incorporate new customer led features.
The hydraulic Mixokret – M3250HD was
developed and assembled in the UK and
introduced in 1997 when sales into this
sector were somewhat erratic. This new
model with hydraulic drive gained imme-
diate market acceptance, and continued to
perform strongly through to its replacement
by the M760DH in 2001.

10
PM 3582 GB
This stationary pump BSA 1005 D “Primera” differs in a few details from the series produced in Aichtal
11
PM 3582 GB
International International
38 40

No time for a coat of paint!


This philosophy of responding to the
market continues to feature strongly, some-
times resulting in small modifications or
additional features rather than new models,
but still reflecting a focus on the customer,
combined with experience, innovation and The Italian PM subsidiary was under time Premadio and Braulio. Other hydro-power
the determination to achieve a positive stations also provide the region and its
outcome. pressure to supply a new truck-mounted
industries with electricity.
concrete pump. M 36-Z: The machine
Accepted as competent partners which had been ordered at short notice by In the meantime, the Cancano reservoir “I“
pump service operators COSSI Spa had to built in 1922 is in urgent need of reno-
Another feature of the UK is the key role vation. The reservoir lies at an altitude of
played by specialist hire companies who be in operation on Tuesday of the follow-
about 2,000 m and contains approximately
operate a high proportion concrete pumps ing week. That meant Putzmeister Italia 650,000 m3 of water. Work on the 91 m
and mortar machines in the market. For high and 965 m long dam comprises pump-
did not even have time to give the new
these companies the equipment is their ing and distributing around 30,000 m3 of
primary business which means they are truck-mounted concrete pump a coat of
concrete which the commissioners, AEM,
particularly focused on raising standards paint, let alone the final finishing. have contracted to the pump service pro-
of productivity and price performance Instead, the M 36 received just a priming vider COSSI Spa in the north Italian town
across the range. This creates a stimulating of Sondrio. Renovation work commenced
environment for PMUK, and one in which coat – something on which the customer
in April 2004 (concrete pump was not used
there is no room for complacency if they insisted! The reasons: the renovation
until July) and is planned for completion at
are to continue to feature strongly with work on a more than eighty year-old the end of 2006.
hire fleets throughout the UK and Ireland.
reservoir had to be carried out within a
PMUK addresses concrete pump operators and new markets with the DYNAJET high-pressure cleaners The concrete being poured is a C30/37
These qualities are no less important with very tight schedule.
with a 16 – 22 cm slump and, as a rule, a
other users from major companies to small water/cement ratio of about 0.45. Aggre-
contractors. In all cases a key factor that Something which the Italian Alpine region gates consist of broken materials and are
gives confidence is PMUK’s commitment The M 36 truck-mounted concrete pump displaying its
around the small town of Bormio does not up to 50 mm in size. In spite of the addi- mere coat of priming in front of the 91 m retaining wall
to a direct presence in the market under- The Dynajet range of high pressure clean- Secure the future lack are rain and snow, which can some- tion of a plasticizer and an apparently soft- of the dam
pinned by investment in people, parts and ers are the latest Putzmeister products times be quite heavy. Precipitation in the sticky consistency (F4), this concrete is not
service to provide comprehensive support introduced by PMUK. Whilst these have At many customer’s PMUK is now dealing dams San Giacomo and Cancano “I” and easily pumped. For example, the mano- By the way: The missing coat of paint will
at all levels. some overlap with existing equipment and with the second generation, and the next the melt from the neighbouring glacier meter shows an increase in hydraulic be applied to the M 36 “Z” in the winter
markets, there is a sharp learning curve to few years will see considerable change are collected by the power company pressure of 260 – 280 bar each time the months, when construction ceases anyway
The strength of PMUK’s technical re- appreciate the full potential. This is a within the company as all those years of AZIENDA ENERGETICA MUNICIPALE S-tube is connected. The reason is special due to the bad weather. So, the coming
sources is evident in it’s ability to specify positive process in itself enabling them to experience bring more people towards re- DI MILANA (AEM) and used to generate additives which are put into the concrete spring will see renewed and “colourful”
and manage in house, industrial pump identify new opportunities to support tirement. With the right planning in place electricity in the power stations at Fraele, batches in the mix unit. activities on the Cancano site!
installations. These include a number of existing customers, with the 350 mg Plus, this an opportunity to pass on the know-
complex waste water treatment projects and build new markets across the range. ledge, enthusiasm and core values that have
for companies like Welsh Water and For the first time PMUK are using a brought success over the past 30 years, and
The hydro-electric power station Cancano “I” plays a considerable role in providing the area with a sure supply of electricity 41
Severn Trent Water. The current major number of specialist distributors to support combine them with new vitality and skills
contract is for the supply of two the direct sales effort for Dynajet to to build the future. This has been a positive
HSP 25100 pumps to a mine infill project achieve maximum penetration in this process for their customer’s and PMUK
in Ireland. broad-based market. must emulate that success.

37 39

PMUK delivered nine KOS high-density solids pumps


and four silos with discharge equipment for a waste
water treatment plant in Cardiff, Wales. On the right,

12
PM 3582 GB
two HSP high-density solids pumps in an Irish mine.
13
PM 3582 GB
International International
42 44
On completion, the underground car park

Warsaw pump service concreting


will accommodate 1,800 vehicles on four
levels. The three storeys above the car park
will house numerous shops, restaurants,
service providers and a state-of-the-art
multiplex cinema. Additionally planned is

the “Golden Terraces” a hotel with 450 beds. The upper storeys
will be rented out as office premises and
residential apartments.

building complex Sub-contractors bear a


great responsibility

SKANSKA Sp. z.o.o. as the main con-


tractor is responsible for the mammoth
project. As the “Golden Terraces“ are to be
Solid building components In the city of Warsaw next to the Centralna multi-functional, the carcass is being con-
structed as four separate zones differing in
(main railway station) and right opposite
made of self-compacting the 231 m high-rise Palace of Culture and their architecture. Whilst SKANSKA is
building all of the foundations and sectors
concrete Science, ING REAL ESTATE is investing 1 and 2 using its own personnel and fleet
around e 250 million in the construction of machines, sub-contractors
of a multi-functional building complex HYDROBUDOWER 6 (HB6) have been
commissioned with the construction of
which goes by the name of “Zlote Tarasy“
zones 3 and 4. Both SKANSKA and HB6
which means “Golden Terraces“. Many of are relying on the know-how and technical The Putzmeister MX 32 T takes on the task of concreting in zone 4 from a central position
the supporting components are made of equipment of specialists in providing con- 45
crete pumps – i.e. on BOSTA Beton and BSA pumps and concrete booms team up
high-strength, self-compacting concrete –
WARBUD S.A.
the wall thickness in some of them is up to The WARBUD company also commenced
150 cm. Putzmeister pumps and booms Both of these Warsaw pump service com- work initially using their mobile Putzmeister
panies are deploying several of their PM truck-mounted concrete pumps M 36 and
have been commissioned to deliver and
machines in the construction of the M 42. As the height of the building in-
place the considerable quantities of con- “Golden Terraces“. For example, for work creased and delivery distances of more than
crete required for the project. on the 1.5 – 2.5 meter thick floor slab and 100 m were required, WARBUD switched
for placing concrete on floors in zones 1 over to just stationary concrete pumps and
and 2 at varying heights, BOSTA-Beton placement operations. Since January 2004,
used in each case two M 28s and M 42s. a Putzmeister BSA 1409 D and a mecha-
nically slewable concrete boom in sector 3
have formed a concreting unit and in zone
4, a BSA 2110 HP-D has been working
together as a team with a stationary con-
crete boom MX 32 T.

Mighty columns, girders and ceiling joists made of


Even throughout the night, concreting
self-compacting concrete
continues using the BSA 2110 HP-D 43

Building industry
booms in Poland
According to enquiries carried out by the
Frankfurter Allgemeine Zeitung, Poland’s
building industry is on a definite road to
recovery; this can be attributed to the
improved economic situation and result-
ing investments. In addition to privately
financed construction projects, the future
will see more and more funding from the
EU funds to benefit especially civil
engineering and road construction as well
as special environmental construction
projects. The increasing number of ten-
ders for major projects has contributed to
an improved climate in the building in-
dustry: alone in the first quarter of 2004,
there was an increase of 20 % compared
with the figures for the same period in
the previous year. (FAZ, 7 June 2004)

14
PM 3582 GB
15
PM 3582 GB
International
46
50 they are wrapped in an insulating foil for at cleaning process and the BSA pump and
48
least 72 hours to ensure the slow release of gate valve are carefully serviced. Whereby
hydration heat. The result is high-strength operator Zdzieszynski is very particular:
building components which have a basic “Lubrication is on the agenda, at least once
area of 150 x 150 cm on the “Golden a day!”
Terraces” site and a very fine, smooth sur-
face already prepared for painting.
52
Maintenance jobs are taken seriously

Andrzej Zdziesznski is the operator respon-


sible for the six-year old Putzmeister BSA
2110 HP-D. Before the first load of con-
crete is delivered, he pumps around 0.75 m3
trial batch through the line. “And then it
runs on its own!” As output pressure is
never high (e.g. only 150 bar hydraulic
pressure at 40 m pump height), the rod side
of machine is pressured, i.e. operates
“according to quantity”. The delivery line
The PM gate valve is hydraulically operated

53

Floor frames clamp the tubular column of the concrete


boom taut into the building structure 47

Concrete pump BSA 2110 HP-D with cleaning “gallows”


(blue) and gate valve (at the right of the picture)

during the climb, supplementary tubes are transfers the concrete to the pumps, is emptied using a gate valve, which steers PM representative – a strong partner
installed as length adjustments. each batch is tested in their own mobile the concrete residue still in the line via a
laboratory. pipe bridge - a so-called „gallows“- into a Not only BOSTA and WARBUD but also
In the winter months, the two pump ser- truck mixer. The valve is connected to the many other Polish concrete pump compa-
vices can carry out pours using pre-heated hydraulic circle of the concrete pump agi- nies and building contractors are provided
49 aggregates up to a temperature of -12°C. tator and can be controlled by means of with support from the PM representative
The concrete is pumped up to the eighth 51 remote control push button. As soon as the ALLTECH, both on the purchase of a
storey whereby the delivery line is now pipe line is empty, the whole of the con- machine and its servicing. Already in the
The climbing process in detail: almost 200 m long. crete delivery system undergoes a thorough “Golden Terraces“ planning phase,
ALLTECH specialists were able therefore
■ Attaching the climbing In addition to WARBUD’s graduate to give the main contractor SKANSKA
A construction piece wrapped around
cylinders and bolt 1 engineer Adam Wleklak, the company with foil releases hydration heat only slowly practical tips regarding optimum concrete
54
has three other employees constantly on pours for this complex construction site.
■ Extending the climbing
site for concrete jobs in zones 3 and 4.
formcylinder (30 mm), “Cooperation with our customer ALLTECH, registered in Warsaw and
extracting bolt 2 and HYDROBUDOWA is simply excellent. Sopot (near Gdansk) has been representing
complete extension Our colleagues from HB 6 give us every Putzmeister AG in Poland since 1992. The
■ Placing bolt 2 on floor support when things begin to get tight and 15 employees at ALLTECH – four of them
frames, removal of bolt 1 we understand when sometimes a piece exclusively responsible for service and
and retracting climbing of formwork isn’t ready according to maintenance – deal with consultation,
cylinder schedule!” Diplom-Ingenieur Adam Wleklak sales, spares supply and customer service
for the PM machines in Poland. The most
■ The process is repeated
In general, the concrete used for the Self-compacting concrete means less important wearing parts are kept in stock in
project is of strength class C50/60 and formwork all three locations, or can be ordered at
C35/45. Furthermore, different components short notice. When required, the service
are made of self-compacting concrete Self-compacting concrete is used for exam- team can be quickly on the spot to tend the
The MX boom is situated on a 20 m high building. With the help of an hydraulic (SCC) of the same strength. Of the total ple in sections where a vibrator cannot machines. Trained ALLTECH employees
tubular column led through small openings climbing device, the height of the concrete quantity of concrete (156,000 m3 for the reach. Or because the high degree of early also carried out the required customer
in the floor and supported in the storeys by boom can be adjusted to building progress. building and 56,000 m3 for the foundation), strength of SCC means the formwork can service jobs at the “Golden Terraces“ site –
three frames. The floor frames fulfil two The climbing process is easily and quickly about 4,800 m3 is SCC material. The be removed sooner, for example, from the to the total satisfaction of both the pump
functions: On the one hand, they clamp the carried out by using two lift cylinders degree of slump is about 17 cm. The supporting piles where formwork may be service companies and the responsible
tubular column taut and on the other hand, which are connected with the hydraulic concrete is supplied by two mixer plants removed in most cases already after 12 contractor.
they absorb the introduction of vertical system of the MX boom. The delivery line outside of Warsaw, which together have a hours. Immediately after the removal of
load moments in the structure of the remains attached to the tubular column capacity of 140 m3/h. Before WARBUD formwork from these building components,

16
PM 3582 GB
17
PM 3582 GB
Tunnel Construction Practical Tip

®
Sika -PM wet spraying systems
55

Mess-free formwork 60

back up tunnel advance work along A newcomer to the Putzmeister AG product


range is a pneumatic pinch valve for the
end hose. The idea itself i.e. to „squash the

the Mediterranean Highway ends of the hose together“ in order to avoid


concrete leakage is known. This new
squeeze valve is made completely of rub-
Work is currently on-going on a further are designed as single structures. All of the ber and is simply pushed over the concrete
six bores (2 x 2170 m, 2 x 278 m and end hose. It is opened and closed pneuma-
section of the Mediterranean Highway
2 x 220 m) have a full section of approxi- tically via radio remote control automati-
in the south of Spain, where three mately 110 m3 and advance work is pro- cally. With only a few seconds delay, the
Sika®-PM500 P type concrete shotcrete gressing at 6 to 10 m per day – depending valve closes or opens the end hose as soon
on whether supporting arches type THN 21 as the operator has given the command
spraying devices are being employed in
and THN 29 need to be installed or not. “Pump ON” or “Pump OFF” via radio
backing up advance work in each of the remote control. The pinch valve can be
three twin-bore tunnels (total length The three mobile shotcrete Sika®-PM500 P completely switched off at any time via a
5.04 km) along the total stretch of 9 km. spraying devices have been operating on toggle switch on the control cabinet.
individual construction site sections since
The section under construction between September. They were first used to secure
La Herradura and Taramay (Almuñécar the slope area around the portals and in the The pinch valve can be completely switched off at any
area) is part of the “Autovía del meantime are needed to quickly secure time via a toggle switch on the control cabinet
Mediterráneo” which will link up the cities tunnel excavation work according to the 58
of Cádiz and Gibraltar in the South of the new Austrian tunnel construction process.
Iberian Pensinsula and Barcelona in the As the machines are equipped with four-
North East. wheel drive and four-wheel steering they
are easily manoeuvrable even in difficult
The 9.1 km long section which is being terrain. 56
built by U.T.E. LA HERRADURA, a
joint venture comprising the construction The Sika®-PM500 P have an extensive All of the Sika®-PM500 used at the LA
companies PLODER S.A., AZVI S.A. and working reach and are therefore well suited HERRADURA site are standardly equip-
OBRAS SUBTERRÁNEAS S.A. runs over for shotcreting jobs on high embankments ped with a liquid metering device (Sika®-
a distance of 1.8 km joint, 4-lane carriage- as well as in underground chambers and Aliva-403.5) and one or two tanks for con-
way and then over a distance of 7.3 km in tunnels. Dimensions range from 4.5 m to crete accelerating agent (capacity in each
each direction of traffic as a separate route 17.5 m. The Putzmeister twin-piston pump case 1000 l). As the site already provided
through three twin-bore tunnels (in total installed lengthwise at the rear of the truck compressed air lines in the tunnels, the
2.52 km long) and four bridges (in total has over 1000 mm lift and 180 mm spraying devices were not supplied with
2.17 km long). The project commissioners, delivery cylinder diameter, as does the their own compressors. A total volume of
the Ministerio de Fomento, had initially stationary pump BSA 1005. With a capa- 75,000 m3 of shotcrete was placed in the
calculated construction costs totalling city of 30 m3/h and just 19 strokes/minute, six tunnels. The pumping of concrete for
A 180 million for the complex track this core pump is simply ideal for vibrat- the tunnels – approximately 80,000 m3 in
routing; which meant the highest motor- ion-free shotcreting jobs. The horizontal strength class C40/50, 180,000 m3 high-
way costs in the whole of Europe – A 20 automatic on the spraying arm has proven strength concrete C 60/75 and 100,000 m3
million for each kilometre. Construction very helpful in shotcreting work in the six in strength class C25/30 – was placed using As no metal collars or metal rollers have
costs are now put at A 157 million. Work LA HERRADURA tunnel bores. stationary concrete pumps, which had been been used, it is, on the one hand, irrelevant
commenced in March 2003 and completion This device enables the cradle to be ex- previously used for building the bridge at what height the rubber collar is attached
is expected for September 2006. tended by 3 m and held in a horizontal piers. Here, too, only Putzmeister machines to the hose. On the other hand, the new
position. In conjunction with the highly were used. switch-off valve is so light, that when fitted
Whereas the bridges consist of two parallel manoeuvrable head of the spraying nozzle to the standard boom end hose, stability is
girders each 350 m, 2 x 580 m and 630 m this results in an extraordinarily even spray not impacted. That means that the end hose
The horizontal automatic of the telescopic arm proved The pinch valve is placed over the
long, the tunnels in each direction of traffic pattern with little rebound. to be very helpful when securing excavation work with need not be shortened by one meter, as is end hose like a collar and is activated
shotcrete (Photo: José Luis Rivas, Sika®) usually the case. pneumatically

One of three Sika®-PM 500 P seen here placing concrete for the upper arches of a tunnel portal of ARGE “LA HERRADURA“ (Photo: José Luis Rivas, Sika®) 57 61
59

An inside view of the closed pinch valve

18
PM 3582 GB
19
PM 3582 GB
International International
64 67

France – the
62

land of
the rotor fans
For years now, the demand for is part of the large fleet of vehicles belong- foundations in the garden of a 300 year-old
Putzmeister rotor PUMI s among our
® ing to BETON DE FRANCE, a pump ser- farmhouse, 20 m3 normal concrete, boom The large hopper on the rotor pump is easy to charge
vice company operating all over France. tip extended with a 15 m hose, lots of time
neighbours in France has been considera- Operator Alain Meroy has been working on spent just waiting – the usual situation. 65
bly higher than that for PUMI®s with a the rotor pump for three years delivering a
piston pump. The rotor system – in whole range of different materials. In the Waiting for concrete
evening, he does not go back to his depot,
France it is also known as “ROMIX” – is
but takes his ROMIX home with him! At 7.15 a.m., the rotor pump arrives at the
so well-known and successful that some “That’s better for me because I save myself construction site. In half an hour, the pump
customers would like to install the rotor the trip to the depot and in the morning, I is ready for operation. The boom has been
onto a “normal” truck-mounted concrete can drive straight to the construction site. placed over the wall in position and the
All the many traffic jams in and out of 100 mm pipe and delivery line have been
pump with boom. Putzmeister is only too Paris mean you need to calculate extra time connected with a reducer. It’s late – and
pleased to put this request into practice. to get to the site punctually”, he explained. around 9.00 a.m. the first of three truck
We came across one of these truck-mount- As the operator and the machine are prac- mixers turns up. So there is enough time
tically left to their own devices, the BQF is for a chat at the vehicle and then for an
ed concrete pumps from the BQF series
equipped with all the accessories needed espresso with the PM visitor in the café
on a typical construction site south of for “an emergency”. next door. Along the way, we are told that
Paris. Alain Meroy pumps using a 4,000 m3 rotor
This morning, Alain Morey is on his way hose, a wearing part, which is replaced
The machine is a BQF 24.08, built in 1999. to his first job in the what used to be rural about 3 or 4 times a year. “No – we don’t The hose is placed around the side of the building The 24 m boom serves as a “pipe bridge” taking the garden wall in its stride
The rotor pump with a 24 m Z-fold boom landscape around Paris to place concrete just turn the hose around in order to length-
63 en its service life”, states operator Meroy 66
clearly, and he goes on to tell us all about
the different materials his rotor delivers, Even a pump hose
with never a word of complaint! “I pump
everything the pinch valve can cope with –
has only one life
whatever happens to come along: lean con-
crete, lean mortar, steel fibre reinforced
concrete, light-weight concrete, that means It doesn’t happen too often but
materials which would not be so suitable occasionally it has been observed that
for a piston pump. So, I am never at a loss after the rotor hose has dealt with a
for work!“ certain quantity it is not replaced, but
simply turned around. This attempt
No need to dispose of concrete residues – assumes saving costs and extending
saving detours and time the service life of the wearing part.
Jörg Herrmann, head of the Central
This job also reveals other strengths of the Service Station at PM AG in Aichtal
rotor system. The whole of the concrete doesn’t think much of such reputedly
can be pumped forward into the formwork economizing measures: “It takes more
- an important feature - as otherwise there time to turn the pump hose around
would be no way of cleaning the pump than it does to replace it with a new
system and the delivery line on the con- one because the hose spout must be
struction site. This speciality is also an removed from the ends and then push-
important reason that the M 24 rotor con- ed on again after the hose has been
crete pump earns its keep on average at two turned. And afterwards, the operator
sites each day in spite of frequent traffic still has a worn rotor hose, in which
congestions. It would have cost operator the fabric lining has been subjected to
Meroy a lot of time in those traffic conditi- great stress. The risk of the hose burst-
ons to drive off to the next disposal site. ing is therefore very high, And all
that just to save A 840 for a new rotor
hose? There is nothing to be gained
from it, you only lose out!”

20
PM 3582 GB
When the truck gets stuck in a jam, there’s time for a chat for the operators Without holding up the flow of traffic, the BFQ 24.08 can be set up along the road
21
PM 3582 GB
Domestic Domestic
69

Formwork dismantled just 16


One-side support
After placing an improved sub-base, a
BSF 42.16. H belonging to BNA Beton-
pumpendienst (Reutlingen) delivered about

hours day following placement 100 m3 of C 20/25 concrete to the masonry.


Pump operator Achim Baierl needed not

of high-strength concrete on Neckar weir only sure instincts when setting up the
machine but also OSS – one-sided supports
as only a very narrow pedestrian or cycle
path – in former times a towpath – could
be considered as a possible location which
Well-conceived site logistics, modern stationary PM concrete pump type BSA The walls of the Neckar weir in The wall runs from the Cloister Mill about could also be reached by the truck mixers.
formwork methods and a reliable fleet of 1408 E took over the delivery of concrete 200 m upstream, separating the Neckar Achim Baierl is a fully qualified, trained
Mittelstadt were renovated in the summer
via a high-pressure pipeline to the station- from its old natural river bed. The surface and tested concrete pump operator and was
machines are today’s essentials when it ary boom MX 32 T. months using a Putzmeister BSF 42.16 H. of the sloping shoulder of the weir had therefore very much aware of the risks of
comes to saving time and money on high- The narrow banks provided very little been increasingly washed away over the setting up the machine so close to the river
rise projects. The latest example of rapid The RWE tower is built on a lens-shaped space for setting up the machine. years. The work immediately next to and in banks and of the need to comply with
foundation in the middle of which is the the Neckar had been planned to take place safety regulations.
project completion are the 91 m high
central core of the building. Whilst at low water.
RWE towers in Dortmund where a OEVERMANN installed MEVA formwork
stationary Putzmeister concrete pump for the ceilings, the stationary concrete
and a concrete boom climbing up with the boom was anchored to a DOKA formwork 70 71
platform which was supported in the ele-
formwork platform played a decisive role. vator shaft. Half of the ceiling area and the
walls of the building’s core were to be rein- The BSA 1408 E being charged from a truck mixer
In the early stages the construction com- forced and simultaneously concreted wet
pany responsible for carrying out the work on wet in a five-day rhythm. Using hy-
OEVERMANN GmbH & Co. KG draulic cylinders, the formwork platform Delivering concrete through
(Münster, branch in Dortmund) rented climbed upwards together with the MX high-pressure line
truck-mounted concrete pumps with long- boom. One storey every five days (3.45 m).
reach booms from local pump service com- The concrete used was of strength class Concrete was delivered from the BSA
panies for placing concrete for the floor C 50/60 of which 120 m3 went into the two stationary pump as far as the boom through
slab, the ceilings in the ground floor and ceiling sections in each storey and around a high-pressure pump line, totalling 120 m
the first four upper storeys. Afterwards, a 49 m3 into each half of the shaft. in length. It comprised for the most part
ZX pipes which were supplemented on two
short sections by high-pressure SK lines
Half of the ceiling area and the walls of the building’s core were to be reinforced and simultaneously concreted wet on wet (130 bar operational pressure). At the inter-
68 face between riser pipe and stationary
boom pipework, a delivery hose – likewise
able to withstand 130 bar – ensures flexible
transition. Concrete was installed up to a
maximum of 30 m3/h.

During the whole period of installation, the


piston side of the BSA 1408 E was under
pressure. At a height of 91 m (max. height
of the facade), hydraulic pressure was
about 220 bar which equals concrete
pressure of 67 bar (i = 3.3). To facilitate
cleaning, a gate valve was installed into
the delivery line about 12 m downstream
of the BSA stationary pump.

From Spring 2005, the 91 m RWE office


high-rise will provide the Ruhr metropolis
with yet another point of orientation,
visible for miles around. The RWE tower
in Dortmund is in the immediate vicinity
of the railway station and on completion,
will boast a 3-storey underground car park
as well as 25,000 m3 of modern office
space. The project costs amount to about
A 50 million. A construction time of just
18 months has been scheduled (from
November 2003 to May 2005) for the
22-storey high-rise until it is handed over
as turnkey premises to the tenants.

Concrete pump and end hose in view – operator Achim Baierl can control concrete placement using the EBC radio remote controls down to the last millimetre

22
PM 3582 GB
23
PM 3582 GB
Applications

Shotcrete job using Imprint:


Publisher
Putzmeister AG, Max-Eyth-Str. 10, D-72631 Aichtal
PSdg, Deutsche Post AG, Entgelt bezahlt, E 60458

universal pump Putzmeister AG


Max-Eyth-Str. 10 · D-72631 Aichtal
Tel. +49 (71 27) 599-0 · Fax 599-520
Telford football stadium, about 80 kilo- Internet: http://www.putzmeister.de
E-mail: pmw@pmw.de
metres north west of Birmingham was
renovated and converted at a considerable ■ Editor: Jürgen Kronenberg
■ Design: Friedrich Pippich
financial cost. The building measures
comprised a new leisure centre complete 73

with swimming pool. The construction


company BUCKINGHAM POOLS used
a small concrete pump BSA 702 D which
had been rented from machine rentals
CBL PLANT HIRE at short notice for
lining the reinforced pool basin with
shotcrete.

72

Placing 12 m3 of schotcrete per hour by hand

The BSA 702 D is excellently suited for shotcrete jobs


by the compressed air was fed into the liver shotcrete, mortar and self-levelling
delivery stream just in front of the nozzle. screed. Just like the larger models in the
The shotcreting job began at the lower end Effective spray performance was 12 m3/h BSA series, the 702 D is equipped with
of the pool and was followed by evenly concrete, an astonishingly high quantity for hard chromium-plated delivery cylinders,
shotcreting the walls. A 70 mm slump the little universal concrete pump with pressure-proof S-transfer tubes and infinite-
material was used for the first shotcrete manually operated nozzle. ly variable output adjustments. The hori-
layer, later the vertical areas were layered zontally dual-division pump hopper can be
with a 50 mm slump concrete. A separate Putzmeister designed the compact BSA folded down sideways and makes for easier
compressor provided the compressed air 702 D as a multi-functional concrete pump cleaning.
required for the shotcreting process where- with a maximum output of 20 m3/h to de-

Your fax for further information Name .........................................................................................................


■ Would you like more information on certain topics in this edition of Putzmeister Post?
Company ...................................................................................................
If so, just copy this page, make a cross next to the topics you are interested in and fax
the form to us. We will then send you detailed information immediately.
Position .....................................................................................................
❏ Truck-mounted concrete pump M 52-5 „Multi-Z“ ..............................MT 3231
❏ Truck-mounted concrete pump M 42-4 „R“ ........................................MT 2391 Street .........................................................................................................
❏ Truck-mounted concrete pump M 36.4 „Z“..........................................BP 3180
❏ Truck-mounted concrete pump M 28-4 „Z“ ........................................MT 3512 Post Code/City ..........................................................................................
❏ Truck-mounted concrete pump BQF....................................MT 1085, BP 3536
❏ Truck-mounted concrete pump MOLI ..................................................BP 3530 Tel. No. ......................................................................................................
❏ City-pump............................................................................................BP 2844
❏ Pneumatic squeeze valve ....................................................................BP 3551 E-mail ........................................................................................................
❏ Stationary concrete pumps ..................................................................BP 2632
❏ Fine concrete pump BSA 702 D ........................................................MM 3541
❏ Stationary placing booms ..................................................................MT 2059 Putzmeister AG
❏ Mechanical distributors RV 10 and RV 12 ..........................................MT 3534 Max-Eyth-Str. 10 · D-72631 Aichtal
❏ Delivery line systems..........................................................................PM 2300 P.O.Box 21 52 · D-72629 Aichtal
❏ Concrete spraying system Sika®-PM500 P..........................................TS 3573 Tel. +49 (71 27) 599-0
❏ DYNAJET high pressure cleaner ........................................................MM 3474 Fax +49 (71 27) 599-520
❏ KOS-sludge pump ................................................................................IP 1082 Internet: http://www.putzmeister.de
❏ HSP-sludge pump ................................................................................IP 1971 E-mail: pmw@pmw.de

PM 3582 GB All rights reserved. Subject to technical amendments without notice. The illustrations in some cases show special-purpose machine designs and snapshots of site
practice which do not always comply with the regulations determined by professional bodies.© 2004 by Putzmeister Printed in Germany (2.50412 RR)

Das könnte Ihnen auch gefallen