VINHOMES CENTRAL
PARK
LIFT AUDIT AND INSPECTION
Lift Pitt
Condition
Recommended Schindler to provide VHCP the schedule to clean all 125 lift
pits, and all lift pitt light must be function at all times, any unused socket to
be properly covered.
1
6/7/2018
2
6/7/2018
3
6/7/2018
ETSI Cable
Recommended and standardize all bended ETSI device and update VHCP of the rectification
schedule.
4
6/7/2018
5
6/7/2018
6
6/7/2018
7
6/7/2018
8
6/7/2018
9
6/7/2018
10
6/7/2018
11
6/7/2018
Controller wires
Recommended to neatly arrange with proper and standardize installation methods and
ensure controller cabinet is always in close condition
12
6/7/2018
13
6/7/2018
14
6/7/2018
15
6/7/2018
16
6/7/2018
17
6/7/2018
18
6/7/2018
19
6/7/2018