VINHOMES CENTRAL
PARK
LIFT AUDIT AND INSPECTION

Total Units: 125


Lift Manufacturer: Schindler
Prepared By: Shye (Peng UK)

Lift Pitt
Condition
Recommended Schindler to provide VHCP the schedule to clean all 125 lift
pits, and all lift pitt light must be function at all times, any unused socket to
be properly covered.

1
6/7/2018

Lift Pitt Associate Equipment


Recommended Schindler to standardize all 125 lift pitt associate device and install the flexible
conduit and/or proper termination

Lift Pitt Associate Equipment Condition


Recommended all 125 lifts Buffer Switches to be properly secured and to ensure the safety
switches contact to be free from any dust so as to prevent breakdown due to poor contact.

2
6/7/2018

Car Bottom Wires Arrangement


Recommended to arrange neatly with wires properly secured

Car Bottom Roller


Recommended to apply the grease with the correct amount as recommended by the
roller manufacturer. Excessive grease will dripped to the rollers and will affect the
ride quality.

3
6/7/2018

ETSL BREAKDWON CASES


(4)

ETSI Cable
Recommended and standardize all bended ETSI device and update VHCP of the rectification
schedule.

4
6/7/2018

Travelling cables cases and signal


communication issues (12)

Travelling Cable Installation


Recommended to provide rectification schedule to VHCP for all 125 lifts travelling cable installation
methods. Some lifts travelling cable seen either rubbing against the lift shaft wall and/or improper
installation.

5
6/7/2018

Effect Of A Poor Installation


Refer to previous for the effect of poor installation, breakdown can occur due to
poor communication between the car and the controller. All power and signal
communication is been transmitted through the traveling cable.

Car Comp Rope Condition


Recommended to clean before lubricating the rope and to follow the rope
manufacture recommendation and remove stuck object to prevent breakdown
related to rope issuer

6
6/7/2018

DOOR BREAKDOWN CASES


(53)

Lift Hoistway Construction and Associate


wiring Recommended to patch the lift shaft evenly and all hoist way wires to sealed with
the flexible conduit or trunking. Overtime expose cable may cause breakdown due
to communication signal between the landing door operator and the controller.

7
6/7/2018

Lift Hoistway Construction and Associate


wiring Recommended all hoist way wires to sealed with the flexible conduit or trunking.
Overtime expose cabel may cause breakdown due to communication signal
between the landing door operator and the controller.

Landing door adjustment


Recommended Schindler to share with VHCP on the improvement plan to get all the
lifts landing door adjusted. Horizontal scratch indicate that the door is rubbing on
the jamb during closing and opening condition.

8
6/7/2018

Car Door Operation


Recommended to ensure car door thread to be free from obstruction and/or
environmental issues so as to prevent breakdown related to stuck object to the door
thread.

Landing door sill condition


Recommended to Schindler provide VHCP the schedule to clean all 125 lift
landing door thread.

9
6/7/2018

Car Door Switches Operation


Recommended and provide VHCP the proper methods to secure all car door flexi conduit and to
standardize the installation methods, loose end may cause breakdown when contacted to the
door switch.

Hoist way door shaft wall liner.


Recommended to standardize the installation methods related to the shaft liner
rectification.

10
6/7/2018

Car COB panel cover


Recommended to fully install and standardize the COB panel installation methods, hoist
way shaft can be seen whilst the lift is travelling.

Car Interior wires


Recommended to fully sealed and standardize the interior wires installation methods

11
6/7/2018

Car Top Condition


Recommended to store the used items on a safe storage area, car top must be in a clean
condition with the station wires neatly arrange.

Controller wires
Recommended to neatly arrange with proper and standardize installation methods and
ensure controller cabinet is always in close condition

12
6/7/2018

Error Logs data analysis


Observed and Recommended to provide VHCP team with the daily technical data and/or event log updating and/or after
every lift breakdown occurrence so as to understand the nature of the breakdown and clear the error log system when the
error has been recorded or rectified. 125 lifts

Machine Room Rescue Device


Recommended to standardize and update VHCP the proper methods to store the
rescue device and exercise acceptable housekeeping methods. 125 lifts

13
6/7/2018

Machine Room Associate Device


Recommended to cover properly any used and/or unused wall mounted device

Machine Room Floor Trunking


Recommended to cover properly all floor trunking properly so as to prevent
tripping hazard.

14
6/7/2018

Machine Room Associate Equipment


Recommended to provide VHCP the proper installation methods of the rope
termination cover and standardize the installation methods for all 125 lifts.

Machine Room Associate Equipment


Recommended to check and update VHCP the status to label properly the rope
termination and to ensure it is maintain in an acceptable condition with the correct
tension as per manufacturer manual.

15
6/7/2018

Machine Room Condition


Machine room must be maintain in a clean and dry condition. VHCP and Schindler
to discuss amicably to resolve the AC condensation issues and the uneven flooring

Machine Room Lighting Condition


Machine Room lighting must always be in operating condition. VHCP and Schindler
to discuss amicably on the rectification schedule.

16
6/7/2018

Machine Room Motor Beam


Recommended to ensure all lift motor beam to be fully sealed, overtime may cause
structural issues due to movement from the lift machine. Defects arise from poor
installation methods.

Lift Speed Governor


Observed and Recommended to update VHCP the rectification schedule to clean 125 units of the GOV unit and to ensure it is
free from rust and/or corrosion.

17
6/7/2018

Machine Associate Equipment


Recommended to standardize the proper way to secure the flexi conduit. 125 lifts

Machine Associate Equipment


Recommended and to provide VHCP the defects rectification schedule and to
ensure the brake plunger cover is been properly sealed. 125 lifts

18
6/7/2018

Machine Room AC Equipment


Recommended and AC system to be properly installed and cover to prevent any
electrical hazard to the machine room personnel whist working the machine room

Power related cases (19)

19
6/7/2018

Lift main power supply termination


Recommended to update VHCP the schedule to rectify the loose wire defect, defect found whilst taking the 3 phase current
reading and recommended to check on all 125 units wires termination to prevent power instability issues, also
recommended to install voltage stabilizer to prevent breakdown related to sudden voltage surge.

cảm ơn bạn
Thank you