JCB INSPECTION CHECKLIST

DATE AGENCY
TIME JCB No.
AREA

JCB OPERATOR
NAME
G.P No.
D.L No.
SL No. OBSERVATIONS OK NOT OK REMARKS
1 Brake
2 Front Light
3 Back Light
4 Front Horn
5 Auto-reverse Horn
6 Condition of Tyres
7 Hydraulic leakage
8 Seat Belt
9 Reflective Tape around cabin
10 Fire Extinguisher
11 Front glass & window
12 Both Side Indicator
13 Both Side Morror
14 All documents are with JCB
15 Registration Date
16 Vehicle Fitness Validity
17 Insurance Validity
18 Road Tax Validity
19 PUC Validity
Vehicle Pass Number (SEZ Pass
20
Holder)

Name & Signature of Agency Supervisor Name & Signature of SSL-Shift I/c
EX1050 CONCERTE (MIXTURE) INSPECTION CHECKLIST
DATE SERIAL No.
TIME AGENCY
AREA EQUIPMENT No.
AIC

SL No. OBSERVATIONS OK NOT OK REMARKS


Overall condition & build structure of
1 Equipment is safe

Guard on the rotating parts of the


2 mixture
3 No leakage of oil from tank
4 Stability of mixture during in opertation
Hydraulic systems are in good
5 condition,no oil leakage from hoses &
cylinder

Water pipes & Hradraulic hoses are to


6 be clamped properly
7 power cables to be in good codition
8 Body earth to be provided to Equipment

9 There is no loose Electrical connection

Electrical cables to mixture to be


11 routed properly.
12 Cover on the Electrical Junction box
Electrical control panel knobs are in
13 operating condition & should be
covered

Electrical connection (3phase) to be


14 taken through RCCB/ ELCB to the
mixture

Name & Signature of Agency Supervisor Name & Signature of SSL-Shift I/c
CONCRETE PUMP INSPECTION CHECKLIST
DATE SERIAL No.
TIME AGENCY
AREA EQUIPMENT No.
AIC

SL No. OBSERVATIONS OK NOT OK REMARKS


Overall condition & build structure of
1 Equipment is safe
2 Body earth to be provided to Equipment

3 There is no loose Electrical connection

power cables to concrete pump routed


4 properly.
5 Cover on the Electrical Junction box
Electrical control panel knobs are in
6 operating condition & should be
covered
pressure gauges are to be in good
7 condition
No leakage of Hydraulic oil tank &
8 Hoses
9 Hoses are to be clamped
Electrical connection (3phase) to be
10 taken through RCCB/ ELCB to the
concrte pump
11

Name & Signature of Agency Supervisor Name & Signature of SSL-Shift I/c
VIBRATOR INSPECTION CHECKLIST
DATE SERIAL No.
TIME AGENCY
AREA EQUIPMENT No.
AIC

SL No. OBSERVATIONS OK NOT OK REMARKS


Overall condition & build structure of
1 Equipment is safe

2 There is no loose Electrical connection

power cables to the vibrator to be


3 routed properly.

Motor startor switches are in operating


4 condition & should be covered

Electrical connection (3phase) to be


5 taken through RCCB/ ELCB to the
vibrator

ELCB/RCCB Tripping healthiness to be


6 checked

7 condition of the Electrical cable

8 Emergency stop working or not

9 Hose is to be in good condition

3-pin plug top be used for power


10 connection

11 Earthing wire connected or not

Name & Signature of Agency Supervisor Name & Signature of SSL-Shift I/c
HILTI MACHINE CHECKLIST
DATE SERIAL No.
TIME AGENCY
AREA EQUIPMENT N
AIC

SL No. OBSERVATIONS OK NOT OK REMARKS


1 Overall condition & build structure of
Equipment
There is no isloose
safe Electrical
2
connection
power cables to the vibrator to be
3 Motor
routed startor
properly.switches are in
4 operating
Electrical connection&(3phase)
condition should beto be
5 covered
taken through RCCB/ ELCB to the
ELCB/RCCB Tripping healthiness to be
vibrator
6 checked
7 condition of the Electrical cable
8 Emergency stop working or not
9 Hose is to be in good condition
10 3-pin plug top be used for power
connection
11 Earthing wire connected or not

Name & Signature of Agency Supervisor Name & Signature of SSL-Shift I/c
BAR CUTTING MACHINE CHECKLIST
DATE SERIAL No.
TIME AGENCY
AREA EQUIPMENT N
AIC

SL No. OBSERVATIONS OK NOT OK REMARKS


1 Overall condition & build structure of
Equipment
There is no isloose
safe Electrical
2 connection
power cables to the vibrator to be
3 Motor
routed startor
properly.switches are in
4 operating
Electrical connection&(3phase)
condition should beto be
5 covered
taken through RCCB/ ELCB to the
ELCB/RCCB
vibrator Tripping healthiness to be
6 checked
7 condition of the Electrical cable
8 Emergency stop working or not
9 Hose is to be in good condition
10 3-pin plug top be used for power
connection
11 Earthing wire connected or not
Name & Signature of Agency Supervisor Name & Signature of SSL-Shift I/c