Sie sind auf Seite 1von 9

Air System Sizing Summary for Administration Building

Project Name: Adminstration Building 06/08/2018


Prepared by: mu 06:42PM

Air System Information


Air System Name Administration Building Number of zones 1
Equipment Class CW AHU Floor Area 16417.1 ft²
Air System Type VAV Location Cairo, Egypt

Sizing Calculation Information


Calculation Months Jan to Dec Zone CFM Sizing Peak zone sensible load
Sizing Data Calculated Space CFM Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 75.6 Tons Load occurs at Jul 1600
Total coil load 906.8 MBH OA DB / WB 103.3 / 77.9 °F
Sensible coil load 706.1 MBH Entering DB / WB 80.7 / 66.8 °F
Coil CFM at Jul 1600 28853 CFM Leaving DB / WB 57.8 / 56.6 °F
Max block CFM at Jul 1600 31964 CFM Coil ADP 55.3 °F
Sum of peak zone CFM 31964 CFM Bypass Factor 0.100
Sensible heat ratio 0.779 Resulting RH 51 %
ft²/Ton 217.3 Design supply temp. 57.2 °F
BTU/(hr-ft²) 55.2 Zone T-stat Check 1 of 1 OK
Water flow @ 10.0 °F rise 181.45 gpm Max zone temperature deviation 0.0 °F

Supply Fan Sizing Data


Actual max CFM at Jul 1600 31964 CFM Fan motor BHP 19.02 BHP
Standard CFM 31685 CFM Fan motor kW 15.09 kW
Actual max CFM/ft² 1.95 CFM/ft² Fan static 2.01 in wg

Outdoor Ventilation Air Data


Design airflow CFM 3088 CFM CFM/person 7.72 CFM/person
CFM/ft² 0.19 CFM/ft²

Hourly Analysis Program v4.90 Page 1 of 9


Zone Sizing Summary for Administration Building
Project Name: Adminstration Building 06/08/2018
Prepared by: mu 06:42PM

Air System Information


Air System Name Administration Building Number of zones 1
Equipment Class CW AHU Floor Area 16417.1 ft²
Air System Type VAV Location Cairo, Egypt

Sizing Calculation Information


Calculation Months Jan to Dec Zone CFM Sizing Peak zone sensible load
Sizing Data Calculated Space CFM Sizing Individual peak space loads

Zone Sizing Data

Maximum Maximum Zone


Cooling Design Minimum Heating Floor
Sensible Airflow Airflow Time of Load Area Zone
Zone Name (MBH) (CFM) (CFM) Peak Load (MBH) (ft²) CFM/ft²
Zone 1 603.6 31324 3088 Jul 1600 130.2 16417.1 1.91

Zone Terminal Sizing Data


No Zone Terminal Sizing Data required for this system.

Space Loads and Airflows

Cooling Time Air Heating Floor


Zone Name / Sensible of Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
1st floor Call Center 1 9.4 Sep 1600 490 2.9 174.4 2.81
1st floor Comm Room 1 6.3 Jul 1500 325 0.4 36.6 8.88
1st floor High tech 1 17.3 Jun 1600 896 4.3 334.8 2.68
1st floor Office 1 11.2 Jul 1500 583 3.6 241.1 2.42
1st floor Open Offices 1 87.1 Aug 1600 4519 17.1 2583.3 1.75
2nd floor Comm Room 1 6.3 Jul 1500 325 0.4 36.6 8.88
2nd floor High tech 1 21.0 Jun 1600 1091 5.8 373.5 2.92
2nd floor Open Offices 1 94.2 Aug 1500 4889 20.5 2561.8 1.91
3rd floor Comm Room 1 6.4 Jul 2100 333 0.5 36.6 9.10
3rd floor High tech 1 22.5 Jun 1600 1168 6.7 373.5 3.13
3rd floor Open Offices 1 103.9 Aug 1600 5389 26.7 2561.8 2.10
Basement Auditing Depart 1 5.2 Aug 1700 269 0.8 153.9 1.75
Basement Comm Room 1 6.2 Jul 1500 321 0.3 36.6 8.76
Basement Legal Devlop 1 7.1 Jul 2300 370 0.9 102.3 3.61
Basement Open Offices 1 49.6 Jul 1600 2576 9.8 2206.6 1.17
Basement Security 1 6.9 Jul 1700 357 2.5 156.1 2.29
Basement Server 1 14.6 Jun 1600 760 1.2 118.4 6.42
Basement Ups 1 9.7 Aug 1600 503 0.7 107.6 4.67
Ground Floor Call Center 1 5.0 Jun 1600 261 1.2 105.5 2.48
Ground Floor Comm Room 1 6.3 Jul 1500 325 0.4 36.6 8.89
Ground Floor Entrance 1 18.2 Jul 1600 942 4.2 505.9 1.86
Ground Floor Meeting 1 2.4 Jul 1500 122 0.0 105.5 1.16
Ground Floor Office G12 1 8.5 Jul 1700 444 3.0 216.4 2.05
Ground Floor Office G-17 1 6.0 Jun 1500 311 1.5 183.0 1.70
Ground Floor Office G-18 1 13.3 Aug 1500 691 4.6 349.8 1.98
Ground Floor Office G-21 1 16.3 Aug 1500 844 5.2 419.8 2.01
Ground Floor Open Office 1 45.7 Aug 1500 2371 5.0 2299.2 1.03

Hourly Analysis Program v4.90 Page 2 of 9


Ventilation Sizing Summary for Administration Building
Project Name: Adminstration Building 06/08/2018
Prepared by: mu 06:42PM

1. Summary
Ventilation Sizing Method Sum of Space OA Airflows
Design Ventilation Airflow Rate 3088 CFM

2. Space Ventilation Analysis Table


Floor Maximum Required Required Required Required Uncorrected
Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air
Zone Name / Space Name Mult. (ft²) Occupants (CFM) (CFM/person) (CFM/ft²) (CFM) (% of supply) (CFM)
Zone 1
1st floor Call Center 1 174.4 7.0 489.7 5.30 0.06 0.0 0.0 47.4
1st floor Comm Room 1 36.6 1.0 324.9 5.30 0.06 0.0 0.0 7.5
1st floor High tech 1 334.8 20.0 896.1 5.30 0.06 0.0 0.0 125.7
1st floor Office 1 241.1 10.0 582.6 5.30 0.06 0.0 0.0 67.2
1st floor Open Offices 1 2583.3 60.0 4519.1 5.30 0.06 0.0 0.0 470.4
2nd floor Comm Room 1 36.6 1.0 324.9 5.30 0.06 0.0 0.0 7.5
2nd floor High tech 1 373.5 20.0 1091.1 5.30 0.06 0.0 0.0 128.0
2nd floor Open Offices 1 2561.8 60.0 4888.6 5.30 0.06 0.0 0.0 469.1
3rd floor Comm Room 1 36.6 1.0 332.9 5.30 0.06 0.0 0.0 7.5
3rd floor High tech 1 373.5 20.0 1168.4 5.30 0.06 0.0 0.0 128.0
3rd floor Open Offices 1 2561.8 60.0 5389.1 5.30 0.06 0.0 0.0 469.1
Basement Auditing Depart 1 153.9 10.0 268.8 5.30 0.06 0.0 0.0 62.1
Basement Comm Room 1 36.6 1.0 320.6 5.30 0.06 0.0 0.0 7.5
Basement Legal Devlop 1 102.3 5.0 369.7 5.30 0.06 0.0 0.0 32.5
Basement Open Offices 1 2206.6 20.0 2575.7 5.30 0.06 0.0 0.0 236.3
Basement Security 1 156.1 4.0 356.6 5.30 0.06 0.0 0.0 30.4
Basement Server 1 118.4 3.0 760.0 5.30 0.06 0.0 0.0 22.9
Basement Ups 1 107.6 3.0 503.0 5.30 0.06 0.0 0.0 22.2
Ground Floor Call Center 1 105.5 4.0 261.1 5.30 0.06 0.0 0.0 27.4
Ground Floor Comm Room 1 36.6 1.0 325.4 5.30 0.06 0.0 0.0 7.5
Ground Floor Entrance 1 505.9 24.0 942.4 5.30 0.06 0.0 0.0 157.0
Ground Floor Meeting 1 105.5 4.0 122.4 5.30 0.06 0.0 0.0 27.4
Ground Floor Office G12 1 216.4 8.0 443.7 5.30 0.06 0.0 0.0 55.2
Ground Floor Office G-17 1 183.0 4.0 311.5 5.30 0.06 0.0 0.0 32.0
Ground Floor Office G-18 1 349.8 5.0 691.4 5.30 0.06 0.0 0.0 47.1
Ground Floor Office G-21 1 419.8 14.0 843.7 5.30 0.06 0.0 0.0 99.0
Ground Floor Open Office 1 2299.2 30.0 2370.8 5.30 0.06 0.0 0.0 294.7
Totals (incl. Space Multipliers) 31474.1 3088.4

Hourly Analysis Program v4.90 Page 3 of 9


Air System Design Load Summary for Administration Building
Project Name: Adminstration Building 06/08/2018
Prepared by: mu 06:42PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jul 1600 HEATING DATA AT DES HTG
COOLING OA DB / WB 103.3 °F / 77.9 °F HEATING OA DB / WB 45.0 °F / 37.8 °F
Sensible Latent Sensible Latent
ZONE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr)
Window & Skylight Solar Loads 1566 ft² 64958 - 1566 ft² - -
Wall Transmission 11648 ft² 89832 - 11648 ft² 82751 -
Roof Transmission 2972 ft² 11847 - 2972 ft² 7279 -
Window Transmission 1566 ft² 36785 - 1566 ft² 37838 -
Skylight Transmission 0 ft² 0 - 0 ft² 0 -
Door Loads 207 ft² 2296 - 207 ft² 2362 -
Floor Transmission 2879 ft² 0 - 2879 ft² 0 -
Partitions 5692 ft² 14791 - 5692 ft² 0 -
Ceiling 0 ft² 0 - 0 ft² 0 -
Overhead Lighting 18302 W 62447 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 35542 W 121268 - 0 0 -
People 400 97999 82000 0 0 0
Infiltration - 73679 50334 - 0 0
Miscellaneous - 27741 4606 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 603641 136940 - 130230 0
Zone Conditioning - 569319 136940 - -25178 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 28853 CFM 0 - 3151 CFM 0 -
Ventilation Load 3088 CFM 83745 63727 3088 CFM 37779 0
Supply Fan Load 28853 CFM 46966 - 3151 CFM -13855 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 1% 6036 - 1% 1302 -
>> Total System Loads - 706067 200668 - 49 0
Central Cooling Coil - 706067 200694 - 0 0
>> Total Conditioning - 706067 200694 - 0 0
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page 4 of 9


System Psychrometrics for Administration Building
Project Name: Adminstration Building 06/08/2018
Prepared by: mu 06:42PM

July DESIGN COOLING DAY, 1600

TABLE 1: SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°F) (lb/lb) (CFM) (ppm) (BTU/hr) (BTU/hr)
Ventilation Air Inlet 103.3 0.01492 3088 400 83745 63727
Vent - Return Mixing Outlet 80.7 0.01101 28853 1129 - -
Central Cooling Coil Outlet 57.8 0.00953 28853 1129 706067 200694
Supply Fan Outlet 59.3 0.00953 28853 1129 46966 -
Cold Supply Duct Outlet 59.5 0.00953 28276 1129 - -
Zone Air - 78.3 0.01056 28276 1218 569319 136940
Return Plenum Outlet 78.3 0.01056 28276 1218 0 -
Duct Leakage Air Outlet 59.3 0.00953 577 1129 - -
Return Duct Outlet 78.0 0.01054 28853 1216 - -

Air Density x Heat Capacity x Conversion Factor: At sea level = 1.080; At site altitude = 1.071 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746.6; At site altitude = 4705.2 BTU/(hr-CFM)
Site Altitude = 242.0 ft

TABLE 2: ZONE DATA

Zone Terminal Zone


Sensible Zone Zone Zone CO2 Heating Heating
Load T-stat Cond Temp Airflow Level Coil Unit
Zone Name (BTU/hr) Mode (BTU/hr) (°F) (CFM) (ppm) (BTU/hr) (BTU/hr)
Zone 1 603641 Cooling 569319 78.3 28276 1218 0 0

Hourly Analysis Program v4.90 Page 5 of 9


System Psychrometrics for Administration Building
Project Name: Adminstration Building 06/08/2018
Prepared by: mu 06:42PM

WINTER DESIGN HEATING

TABLE 1: SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°F) (lb/lb) (CFM) (ppm) (BTU/hr) (BTU/hr)
Ventilation Air Inlet 45.0 0.00318 3088 400 -37779 0
Vent - Return Mixing Outlet 45.2 0.00318 3151 400 - -
Central Cooling Coil Outlet 45.2 0.00318 3151 400 0 0
Supply Fan Outlet 49.3 0.00318 3151 400 13855 -
Cold Supply Duct Outlet 49.0 0.00318 3088 400 - -
Zone Air - 56.6 0.00318 3088 408 25178 0
Return Plenum Outlet 56.6 0.00318 3088 408 0 -
Duct Leakage Air Outlet 49.3 0.00318 63 400 - -
Return Duct Outlet 56.4 0.00318 3151 408 - -

Air Density x Heat Capacity x Conversion Factor: At sea level = 1.080; At site altitude = 1.071 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746.6; At site altitude = 4705.2 BTU/(hr-CFM)
Site Altitude = 242.0 ft

TABLE 2: ZONE DATA

Zone Terminal Zone


Sensible Zone Zone Zone CO2 Heating Heating
Load T-stat Cond Temp Airflow Level Coil Unit
Zone Name (BTU/hr) Mode (BTU/hr) (°F) (CFM) (ppm) (BTU/hr) (BTU/hr)
Zone 1 -130230 Deadband 25178 56.6 3088 408 0 0

Hourly Analysis Program v4.90 Page 6 of 9


Hourly Air System Design Day Loads for Administration Building
Project Name: Adminstration Building 06/08/2018
Prepared by: mu 06:42PM

Data for July

Total Cooling Total Heating


900

800

700

600
Load ( MBH )

500

400

300

200

100

0
00 02 04 06 08 10 12 14 16 18 20 22
01 03 05 07 09 11 13 15 17 19 21 23
Hour of Day

Hourly Analysis Program v4.90 Page 7 of 9


Hourly Zone Design Day Loads for Administration Building
Project Name: Adminstration Building 06/08/2018
Prepared by: mu 06:42PM

Zone: Zone 1
Data for July

Zone Sensible Zone Conditioning


600K
550K
500K
450K
400K
350K
BTU/hr

300K
250K
200K
150K
100K
50K
0
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Hour of Day

Hourly Analysis Program v4.90 Page 8 of 9


Psychrometric Analysis for Administration Building
Project Name: Adminstration Building 06/08/2018
Prepared by: mu 06:42PM

Location: Cairo, Egypt


Altitude: 242.0 ft.
Data for: July DESIGN COOLING DAY, 1600
0.020
1. Outdoor Air
2. Mixed Air
3. Central Cooling Coil Outlet
4. Supply Fan Outlet 0.018
5. Duct Heat
6. Room Air
7. Return Duct Outlet
1
0.016

Specific Humidity ( lb/lb )


0.014

2 0.012
6
7
3 45 0.010

0.008

0.006

0.004

0.002

0.000
30 40 50 60 70 80 90 100
Temperature ( °F )

Hourly Analysis Program v4.90 Page 9 of 9

Das könnte Ihnen auch gefallen