I was too thrilled & felt extremely joyous to pursue my vocational training at such a big
enterprise in the field of Indian industries. I was really looking forward to my vocational
training as an interface between my theoretical knowledge & its technical application.
In the very first look, B.H.E.L seemed to be far big than the general perception I had
about an industry. B.H.EL is a self sufficient city in itself giving a reflection of the
growing industrial manufacturing standards in India.
ARRIVAL:
All of us were sorted in different groups & assigned different blocks. With three other
people in the group I was assigned BLOCK 3 – TURBINE MACHINES.
Our field of training was General Awareness in Steam Turbines Machining &
Their Assemblies under the able guidance of Mr. Subroto Haldar, Deputy
General Manager Block 3.
MANUFACTURING UNIT:
Our First day at the B.H.E.L got consumed for the paper work, formalities & issuing of
security passes. All my excitements were jumping out of my limits to enter the
manufacturing unit which could happen only on the second day. As directed at H.R.D.D,
we reported to Mr. Subroto Haldar at Block 3.
BAY-1 LAYOUT
MACHINE SPECIFICATIONS
In Bay-1, we got good exposure to many state of the art technology Drilling & Boring
machines. Some were much bigger than that we had expected. We got opportunity to
machine parts on our own under the supervision of the supervisors. We drilled holes on
various turbine parts such as Guide Blade Carriers, casings (inner, inner-outer, outer).
Apart from turbine parts we also drilled holes in some of the valves, breech nuts etc.
Out of all the machines there was a machine which stood tall in terms of size as well as
technology. This machine was a Vertical Boring Machine manufactured by an Italian
company Carnaghi – Pietro.
THE LEADING ASSET OF BAY – 1
Spindle Taper BT 50
Special Features:
BAY – 2
After acquiring adequate knowledge about various boring & drilling operations
beings performed in Bay-1 as well as the machines we had to report in second week to
Mr. S. Bajaj who was our instructor for Bay-2. He introduced us to the bay with the same
professionalism as by Mr. Gulati & gave us the same instructions.
Bay -2 comprised of C.N.C, D.N.C Lathes, & few Drilling, Milling & Planer machines.
BAY-2 LAYOUT
MACHINE SPECIFICATIONS
Out of all the above mentioned machines of Bay-2, there was a machine which was
unique in its features & could perform on its own almost all the operations being carried
out in the bay. This was INNSE BERARDI, the C.N.C Lathe Machine.
TECHNOLOGY AT PAR WITH EXCELLENCE
INNSE BERARDI
BLOCK DIAGRAM
Special Features:
Main Specifications:
The first two weeks of our training were quite educative & informative giving us an apt
knowledge of almost all the known machines & machining techniques being used at bays
1 & 2 of Block- 3. So far, we had only seen various machines & turbine parts (work
piece) being machined on them. Till this stage, we could identify all the parts of the
turbines & now it was the time for us to know about the assembly of these parts to form
the turbine.
As per our route sheet, for our third week of training at Bay-3 i.e. Assembly Section we
had to report to Mr. Saxena, whose behavior towards us was no different from others.
Now it seemed to us that pure professionalism is one of the main characteristics of all the
B.H.E.L employees irrespective of their post.
Mr. Saxena introduced us to assembly section in a bit different way. He personally took
us to different stands (where turbines of different wattages were assembled) & explained
us that which one is for which kind of turbine. We could see around ten stands in all
marked with the specifications for the turbines ranging from 250MW to 1000MW for
assembly of Gas, Hydro & Steam Turbines. But due to non availability of orders only one
stand was being prepared to carry on the assembly work. Mr. Saxena told us that
assembly of a 500MW Low pressure steam turbine would start the next day on which we
had to report at Bay-3 & so he decided to take a theory class on Day 1.
BLOCK DIAGRAM
The whole set up is laid up as shown in the block diagram. The three turbines, generator
& the governor are connected to each other with shafts further being connected by
couplings.
Steam first of all enters H.P Turbine which on one side is coupled to governor & on the
other side to I.P Turbine. H.P Turbine has the smallest of the dimensions of the three
turbines. Steam after expanding through H.P Turbine is supplied to I.P Turbine
(intermediate dimensions) which is supplied with additional steam also. Steam now
expands through I.P Turbine & is fed to L.P Turbine (max. dimensions) where it is
further expanded. Additional steam is also fed to L.P Turbine. The over all expanded
steam is taken out from a valve of L.P Turbine. This whole procedure generates torque in
the interconnected shafts of the three turbines & this torque is further transmitted to the
rotor of the generator & thus electricity is obtained. With all such details, two & a half
hour long lecture of Mr. Saxena ended.
On our second day at Bay-3, we were instructed to move directly to the assembly stand.
In the first site we could see an L.P Inner Outer Lower Half Casing clamped on the stand.
A senior supervisor being called upon as “Master Ji’’ took us in his charge. He was
supervising the whole assembly progress. He kept explaining us the various activities
being carried out during assembly. First of all, a large over head crane came with L.P
Inner Outer Upper Half Casing which with much labour made to sit accurately on lower
half & further was clamped on the stand & also fitted on lower half using bolts & nuts.
The whole procedure took around one & half hour & it seemed to us that three hours’
allowed time for training was not enough to understand the full assembly process. We
talked about this to our incharge Deputy General Manager Mr.S.Haldar and got our
training time extended from three hours to six hours till our training in assembly section
which could be implemented from third day only because of various security checks.
On our third day at the assembly stand, a dummy rotor was installed at the center of inner
outer casing using various gauges to rule out any possibility of it getting offset from
center point of inner outer casing. Further, the overhead crane brought Guide Blade
Carriers-1(G.B.C-1) to be fixed on first bored ring of Inner Outer on both sides. Again
the G.B.Cs-1 were brought in two parts viz. upper halves & lower halves & the work to
fix G.B.Cs started. G.B.Cs one by one were first clamped to Inner Outer at their
respective bored rings with reference to dummy rotor & were bolted using pneumatic
bolting gun.
On the fourth day in Bay-3, G.B.Cs 2& 3 were fixed in the same manner.
On the fifth day, upper half of the whole assembly assembled till now was lifted by a
crane & L.P Inner was made to sit on the platforms of lower assembly & the upper half
was again bolted.
On our last day in the bay the whole assembly was enclosed in L.P Outer Casing Lower
& L.P Outer Casing Upper & by the time we left at our timings bolts were still being
bolted. We were told that the rotors are fixed only at the site of the installation of the
turbines.
FOURTH WEEK
O.S.B.T
Till now in the three weeks of our training , we had seen only machining of various
turbine parts & their assembly. But in the fourth week we were directed to go to Mr.
Sheesh Ram in the O.S.B.T . The term O.S.B.T was very new for us & only after talking
to Mr. Sheesh Ram, we got to know that it was a over speed vacuum balancing tunnel, a
set used to balance the rotors to prevent vibrations. So it was our first chance to see the
inspection work.
The H.E.E.P unit of B.H.E.L, Hardwar is having two balancing facilities known as over
speed balancing installation located in Block-1 (O.B.-1) & the other one located in
Block-3 (O.S.B.T ) called as over speed vacuum balancing tunnel. As we were in Block-
3, so we only got the chance to see O.S.B.T.
Although, like each component made at B.H.E.L. with precise accuracies due to use of
C.N.C machines, rotors are also made with state of the art technology but then also due to
some unavoidable errors, even difficult to be detected by C.N.C machines, the rotors
produced are not fully balanced. Unbalanced rotors lead to vibrations of rotors as well as
the whole turbine at the time of operation. As we know, the vibrations have major ill
effects on the efficient functioning of any machine or set up they have to minimize &
O.S.B.T performs this function for the rotors.
O.S.B.T. basically is a vacuumized tunnel equipped with all the facilities to balance a
rotor. Vacuum is created as while balancing rotors are rotated at very high R.P.M’s & the
presence of air would develop great friction & thus would cause damage to the rotor
blades.
To start with the balancing, the first major task is to bring the rotor to the O.S.B.T & the
purpose is served by the two Pedestal Bearings which are made to move out of O.S.B.T
through rails at the place where rotor lies. The rotor is fixed on the bearings using a crane
& then the whole set up is moved inside the O.S.B.T & the front wall of tunnel is
hydraulically pressed against the wall of tunnel. Now, the entry could be made to the
tunnel by only one small rear door. Once, the rotor is brought inside O.S.B.T its
monitoring starts in a separate big hall outside the tunnel using various advanced
machines & multi screen system.
BLOCK DIAGRAM
The position of the rotor is monitored by two screens, on which the virtual views of front
& rear faces of the rotor ends appear. Position of both the ends of the rotor is marked on
the screen at the X & Y Axes. After this, workers in the tunnel are directed to make the
adjustments as per the calculations made in the control room & the rear door of the tunnel
to generate the vacuum. The vacuum in the tunnel is generated by using vacuum pump &
the vacuum pump keeps on doing that until a vacuum of 2 torr is achieved in the tunnel.
This process of creating vacuum in the tunnel may take from two to three hours. Now the
rotor is made to rotate with the help of a set up installed outside the O.S.B.T. comprising
of two large D.C. generators each having a capacity of 2x3.8 MW. These generators are
connected to the motor which rotates the carton shaft. The carton shaft is in turn coupled
with the rotor thus rotating the rotor at high speeds. The rotor is made to rotate at about
3000 R.P.M which is the balancing sped for the rotor. The vibrations are generated in the
rotor which can be analyzed along the four axes (+X, +Y, -X, -Y ) on the two screens in
the control room. To eliminate the vibrations in the rotor, weights are applied to the
opposite axis of the vibration. To put the correction weights on the rotor, the whole
arrangement is brought to a halt. This process is continued till we get sufficiently low
value of vibrations at 3000 R.P.M. Although the rotor is balanced at 3000 R.P.M but it is
rotated at much higher speeds up to 3750 R.P.M which is the maximum limit of the speed
of rotors in order to put them on an overspeed test so that the rotors do not fail while
operating in the industries. This is known as OVERSPEED BALANCING of a ROTOR.