2 of 32
23 Fit-up Inspection Record
JIMT-C02-Q-13-20087-
26 Vacuum Box Test Record
T61/T62/T01/T02/T03/T04/T05/T06/T07/-001
JIMT-C02-Q-13-20088-
27 T61/T62/T01/T02/T03/T04/T05/T06/T07/T11/T Oil Chalk Test Record
12/T13-001
JIMT-C02-Q-13-20041- A-
28 RT Report (Refer to the RT report master list)
1/CIWE/JIMT/RT-001 to 550
JIMT-C02-Q-13-20043-
29 PT Report
A-1/CIWE/JIMT/PT-001 to 015
JIMT-C02-Q-13-20044- A-
30 MT Report
1/CIWE/JIMT/MT-001 to 056
31 0004,0042,0012,0014,0031,0037,0060,0077 PDA Test Report
3 of 32
Inspection Record and Report Master List
32 PIT/16/00023 PIT Test Report
33 SA0013/2016 Compaction Test Results for Sand Sample
34 TSR/16/0838 Compaction Test Results for Sandstone Sample
35 SA0014/2016 Particle Size Distribution
36 TSR/16/0863 Laboratory Test on Sandstone Sample
37 DCOR1701/010 Core Test Report
38 Refer to the cube test report master list Cube Test Report
39 MM-57181/LCL/1 Rebar Test Report
40 MM-57181/LCL/2 Rebar Test Report
41 MM-57257/ZQD Rebar Test Report
42 DCOR1703/035 Core Test Report
43 0040-2017,0048-2017,0062-2017,0095-2017 Plate Bearing Test Results
44 JIMT-C02-Q-13-20100 Quality record and report
45 JIMT-C02-Q-13-20101 Quality record and report (Welder Qualification Certificate)
46 JIMT-C02-Q-13-20102 Quality Record and Report (RC Pile Receiving Inspection Record 002~020)
47 JIMT-C02-Q-13-20103 Quality Record and Report (Driven Pile Records 002~015)
48 JIMT-C02-Q-13-20104 Qualification Certificate of NDT Personnel for Tank Fabrication (Shop)
49 JIMT-C02-Q-13-20105 Mill Certificate of Steel Plate for Tank
50 JIMT-C02-Q-13-20106 Mill Certificate of Steel Shape for Tank
51 JIMT-C02-Q-13-20107 Quality Record and Report (RC Pile Receiving Inspection Record 021~042)
52 JIMT-C02-Q-13-20108 Quality Record and Report (Request for Inspection 005~010)
53 JIMT-C02-Q-13-20109 Quality Record and Report (Driven Pile Records 016~031)
54 JIMT-C02-Q-13-20110 Quality Record and Report (2017-Jan-11)
55 JIMT-C02-Q-13-20111 Quality Record and Report (WPS and PQR for Tank Fabrication)
56 JIMT-C02-Q-13-20112 Quality Record and Report (Monitoring and Measuring Devices for Tank Fabrication)
57 JIMT-C02-Q-13-20113 Quality Record and Report (Welder Qualification for Tank Fabrication)
58 JIMT-C02-Q-13-20114 Quality Record and Report (RC Pile Receiving Inspection Record 043~097)
59 JIMT-C02-Q-13-20115 Quality Record and Report (Driven Pile Records 032~051)
60 JIMT-C02-Q-13-20116 Quality Record and Report (01-Feb-2017)
61 JIMT-C02-Q-13-20117 Quality Record and Report (Driven Pile Records 052~072)
62 JIMT-C02-Q-13-20118(dms no have Inspection and test report for temporary office
4 of 32
Inspection Record and Report Master List
63 JIMT-C02-Q-13-20119 Quality Record and Report (Cube Test Report for Concrete Trial Mix)
64 JIMT-C02-Q-13-20120 Quality Record and Report (T61 Bottom Plate Fabrication)
Quality Record and Report
65 JIMT-C02-Q-13-20121
(Concrete and Rebar Works for T61 & 62)
Quality Record and Report
66 JIMT-C02-Q-13-20122
(Monitoring and Measuring Devices Calibration)
67 JIMT-C02-Q-13-20123 Quality Record and Report (Rebar Receiving Inspection for T61,62,01,02 Foundation)
68 JIMT-C02-Q-13-20124 Audit Report at QingDao Workshop (Part 1)
69 JIMT-C02-Q-13-20125 Audit Report at QingDao Workshop (Part 2)
70 JIMT-C02-Q-13-20126 Qualified Personnel and Calibrated Equipment for NDT Works
71 JIMT-C02-Q-13-20127 Quality Record and Report (Tank Nozzles Mill Certificate)
72 JIMT-C02-Q-13-20128 Quality Record and Report (PDA Report for Tank Pile)
73 JIMT-C02-Q-13-20129 Quality Record and Report (Welding Consumable Material for Tank)
74 JIMT-C02-Q-13-20130 Quality Record and Report (T61/T62/T01/T02 Tank Fabrication)
75 JIMT-C02-Q-13-20131 Quality Record and Report (1st Batch Welder Qualification Test)
76 JIMT-C02-Q-13-20132 (Rev 1) Quality Record and Report (RT Report and Summary)
77 JIMT-C02-Q-13-20133 Quality Record and Report (Concrete Trial Mix)
78 JIMT-C02-Q-13-20134 Quality Record and Report (Foundation Final Survey Inspection)
79 JIMT-C02-Q-13-20135 Quality Record and Report (Plate Bearing Test)
80 JIMT-C02-Q-13-20136 Quality Record and Report (Tank Erection of T61/62/01/02)
81 JIMT-C02-Q-13-20137 Quality Record and Report (PDA of Pile No.806,807,699,785,784,713)
82 JIMT-C02-Q-13-20138 Quality Record and Report (Sound and Vibration Meter Calibration)
83 JIMT-C02-Q-13-20139(dms no have) Settlement and Movement Surveillance Record
84 JIMT-C02-Q-13-20140 Quality Record and Report (Cube Test Report)
Quality Record and Report
85 JIMT-C02-Q-13-20141
(Concrete and Rebar Works for T01~07 & T11~13)
Settlement, Lateral Movement & Vibration Monitoring Report for Substation Piling
86 JIMT-C02-Q-13-20142
Work
87 JIMT-C02-Q-13-20143 Rev 1 Investigation Report
88 JIMT-C02-Q-13-20070-001-009 Quality Audit Meeting Attendance List
89 JIMT-C02-Q-13-20068-001-007 Quality Audit Plan
5 of 32
Inspection Record and Report Master List
90 JIMT-C02-Q-13-20069-001-007 Quality Audit Checklist
91 JIMT-C02-Q-13-20091-001~008 & 101~123 Concealed Works Inspection Record
Quality Record and Report
92 JIMT-C02-Q-13-20144
(Tank Foundation Handover Report)
93 JIMT-C02-Q-13-20145 Corrective and Preventive Action Report for NCN-003
94 JIMT-C02-Q-13-20146 Quality Record and Report (Concealed Works Inspection Record)
95 JIMT-C02-Q-13-20147 Quality Record and Report (Plate Bearing Test for Sleeper and Office)
96 JIMT-C02-Q-13-20148 Quality Record and Report (PDA Report for Substation)
97 JIMT-C02-Q-13-20149 Quality Record and Report (WLT Report for Substation)
98 JIMT-C02-Q-13-20150 Blasting and Painting Inspection Report for Jet Fuel Sample Tank
99 PUI/RMC/L05/NDT008/17 Rebound hammer test report
100 25414 (R.A.K.) Windsor probe test
101 JIMT-C02-Q-13-20051-001~027 Application Form of Welder Qualification Test
102 JIMT-C02-Q-13-20050-01~033 Welder Performance Qualification
103 JIMT-C02-Q-13-20052-01~033 Welder Qualification Certificate
104 JIMT-C02-Q-13-20151 Quality Record and Report (T61 Hydrostatic Test Report)
105 JIMT-C02-Q-13-20152 Reply of Audit Report No.001 from PMC
106 JIMT-C02-Q-13-20153 Quality Record and Report For Sumps Among Tanks (03-07 and 11-13)
107 JIMT-C02-Q-13-20154 dms no have
108 JIMT-C02-Q-13-20155 Quality Record and Report For Pipe Rack
109 JIMT-C02-Q-13-20156 dms no have
110 JIMT-C02-Q-13-20157 dms no have
111 JIMT-C02-Q-13-20158 dms no have
112 JIMT-C02-Q-13-20159 Quality Record and Report For RC Wall and Cover Slab
113 JIMT-C02-Q-13-20160 Quality Record and Report (Hydrostatic Test Report for T01-T07 and T62 )
114 JIMT-C02-Q-13-20161 Quality Record and Report for Tie In 4 Pipe Spool(Hydro Test)
115 JIMT-C02-Q-13-20162 dms no have
116 JIMT-C02-Q-13-20163 Windsor Probe Tests For Reinforcement Concrete Structure
117 JIMT-C02-Q-13-20164 Hydrotest for Potable Water Ductile Iron -Cement Lined Pipe
118 JIMT-C02-Q-13-20165 Investication for tee
119 JIMT-C02-Q-13-20166 E&I
6 of 32
Inspection Record and Report Master List
120 JIMT-C02-Q-13-20167 E & I,EOT Crane
121 JIMT-C02-Q-13-20168 TANK 01 Sprinkler & fire foam system
122
123
124
125
126
127
128
7 of 32
SN Document / Record No Document / Record Name
1 JIMT-C02-Q-13-20000-001 Request for inspection master list
2 JIMT-C02-Q-13-20001-001~ 471 Request for inspection
3 JIMT-C02-Q-13-20002-100~129 Non-conformance report
4 JIMT-C02-Q-13-20003-001 Non-conformance report master list
5 JIMT-C02-Q-13-20004-003 Corrective and preventive action request
6 Corrective and preventive action request master
JIMT-C02-Q-13-20005-ZZZ
list
7 JIMT-C02-Q-13-20006-001~013 Monitoring and measuring devices master list
8 Certified and qualified, registered personnel
JIMT-C02-Q-13-20007-001~005
master list
9 JIMT-C02-Q-13-20008-001~004 Summary of welding consumable materials
10 JIMT-C02-Q-13-20009-001~115 Welding material request
11 JIMT-C02-Q-13-20010-001~180 Welding material issue and return record
12 JIMT-C02-Q-13-20011-001~125 Welding electrode storage and drying record
13 JIMT-C02-Q-13-20012-ZZZ Welding procedure specification
14 JIMT-C02-Q-13-20013-ZZZ Procedure qualification record
15 JIMT-C02-Q-13-20014-001~002 WPS and PQR master list
16 JIMT-C02-Q-13-20015-001~012 Fit-up inspection record
17 JIMT-C02-Q-13-20016-ZZZ Fit-up inspection record master list
18 JIMT-C02-Q-13-20017-ZZZ Visual inspection report
19 JIMT-C02-Q-13-20018-ZZZ Visual inspection report master list
20 JIMT-C02-Q-13-20019-ZZZ Welder performance record
21 JIMT-C02-Q-13-20020-001~012 Welding joint traceability record
22 JIMT-C02-Q-13-20021-ZZZ Summary of material stock/stores inventory
23 JIMT-C02-Q-13-20022-001~110 Material receiving inspection report
24 JIMT-C02-Q-13-20023-ZZZ Material issue record
25 JIMT-C02-Q-13-20024-ZZZ Material return to stock record
26 JIMT-C02-Q-13-20025-006 Material receiving inspection report master list
27 JIMT-C02-Q-13-20026-ZZZ Quarantine sticker or tag master list
28 JIMT-C02-Q-13-20027-001~027 General inspection report
29 JIMT-C02-Q-13-20028-ZZZ General inspection report master list
30 JIMT-C02-Q-13-20029-ZZZ Inspection and test plan
31 JIMT-C02-Q-13-20030-ZZZ Summary of inspection and test plan
32 JIMT-C02-Q-13-20031-ZZZ Punch list form
33 JIMT-C02-Q-13-20032-ZZZ Punch list summary status (Discipline)
34 JIMT-C02-Q-13-20033-ZZZ Punch list summary status (System/subsystem)
35 JIMT-C02-Q-13-20034-ZZZ Welding joint repair traceability record
36 JIMT-C02-Q-13-20035-ZZZ Annual training schedule
37 JIMT-C02-Q-13-20036-008 Training attendance list
38 JIMT-C02-Q-13-20037-ZZZ Tank fabrication data sheet
39 JIMT-C02-Q-13-20038-ZZZ Material identification & traceability record
40 JIMT-C02-Q-13-20039-001~012 Dimension inspection report
41 JIMT-C02-Q-13-20040-ZZZ Dimension inspection report master list
42 JIMT-C02-Q-13-20041-ZZZ RT report
43 JIMT-C02-Q-13-20042-ZZZ UT report
44 Liquid Penetrant Test Report for
JIMT-C02-Q-13-20043 Rev 0
Tank61,62,T01~T07,T11~13
Quality Record and Report,Magnetic Particle
45 JIMT-C02-Q-13-20044 Rev 0 Testing Report (MT) for Tank 61,62,Tank 01~07
and Tank 11~13 (Report No.01~26)
Quality Record and Report,Magnetic Particle
Testing Report (MT) for Tank 61,62,Tank 01~07
JIMT-C02-Q-13-20044-001 Rev 0
and Tank 11~13 (Report No.027~052 &
056)
Quality Record and Report,Magnetic Particle
Testing Report (MT) for Tank 61,62,Tank 01~07
and Tank 11~13 (Report No.xxxx)
46 JIMT-C02-Q-13-20045-ZZZ
47 JIMT-C02-Q-13-20046-ZZZ
48 JIMT-C02-Q-13-20047-ZZZ
49 JIMT-C02-Q-13-20048-ZZZ Summary of painting materials
50 JIMT-C02-Q-13-20049-ZZZ Surplus Material List
51 JIMT-C02-Q-13-20050-01~033 Welder performance qualification
52 JIMT-C02-Q-13-20051-001~027 Application form of welder qualification test
53 JIMT-C02-Q-13-20052-01~33 Welder qualification certificate
54 JIMT-C02-Q-13-20053-ZZZ Qualified welders master list
55 JIMT-C02-Q-13-20054-ZZZ Visual inspection report for painting works
56 JIMT-C02-Q-13-20055-001~165 RC pile receiving inspection record
57 JIMT-C02-Q-13-20056-001~006 Pile (Ultimate) load test record
58 JIMT-C02-Q-13-20057-ZZZ Preliminary trial piling record
59 JIMT-C02-Q-13-20058-001~069 Survey inspection record
60 JIMT-C02-Q-13-20059-001~200 Pile driving inspection record/Driven Pile Record
61 JIMT-C02-Q-13-20060-ZZZ Surveillance report
62 JIMT-C02-Q-13-20061-ZZZ Working load test report
63 JIMT-C02-Q-13-20062-ZZZ Pile cutting record
64 JIMT-C02-Q-13-20063-ZZZ Piling driving analyser report
65 JIMT-C02-Q-13-20064-ZZZ Management review meeting attendance list
66 JIMT-C02-Q-13-20065-ZZZ Improvement plan
67 JIMT-C02-Q-13-20066-ZZZ Minutes of meeting for management review
68 JIMT-C02-Q-13-20067-ZZZ Internal audit schedule
69 JIMT-C02-Q-13-20068- 01~007 Internal audit plan(Quality)
70 JIMT-C02-Q-13-20069-001~007 Internal audit checklist(Quality)
71 JIMT-C02-Q-13-20070-001~009 Internal audit meeting attendance list(Quality)
72 JIMT-C02-Q-13-20071-ZZZ Internal audit report
73 JIMT-C02-Q-13-20072-001~005 Master list of welders (sample)
136 JIMT-C02-Q-13-20133
137 JIMT-C02-Q-13-20134
138 JIMT-C02-Q-13-20135
6-Jun yes
JIMT-C02-Q-04-20039
JIMT-C02-Q-04-20039
JIMT-C02-Q-04-20039
JIMT-C02-Q-04-20039
JIMT-C02-Q-04-20017
JIMT-C02-Q-04-20014
JIMT-C02-Q-04-20014
JIMT-C02-Q-04-20014
JIMT-C02-Q-04-20014
JIMT-C02-Q-04-20039
JIMT-C02-Q-04-20019
JIMT-C02-Q-04-20019
JIMT-C02-Q-04-20019
JIMT-C02-Q-04-20019
JIMT-C02-Q-04-20019
JIMT-C02-Q-04-20019
JIMT-C02-Q-04-20019
JIMT-C02-Q-04-20019
JIMT-C02-Q-04-20019
JIMT-C02-Q-04-20005
JIMT-C02-Q-04-20005
JIMT-C02-Q-04-20005
JIMT-C02-Q-04-20004
JIMT-C02-Q-04-20004
JIMT-C02-Q-04-20004
JIMT-C02-Q-04-20004
JIMT-C02-Q-04-20004
JIMT-C02-Q-04-20013
Rev.1
JIMT-C02-Q-04-20053
Rev.0
JIMT-C02-Q-04-20012
Rev.1
JIMT-C02-Q-04-20012
Rev.1
JIMT-C02-Q-04-20022
JIMT-C02-Q-04-20022
submitted yes
dms no have
? ?
23-May yes
5-Jun yes
24-May yes
25-May yes
5-Jun yes
26-May yes
31-May yes
31-May yes
1-Jun yes
1-Jun yes
? ?
dms no have
dms no have
dms no have
dms no have
dms no have
dms no have
DMS Done
20.04.18 Yes
20.04.18 Yes
20.04.18 Yes
21.04.18 Yes
21.04.18 Yes
21.04.18 Yes
Yes
Yes
Yes
30.04.18
Yes
30.04.18
Yes
30.04.18
Yes
30.04.18
Yes
30.04.18
Yes
30.04.18 Yes
30.04.18 Yes
30.04.18 Yes
30.04.18 Yes
30.04.18 Yes
7-May-18 Yes
7-Jun-18 yes
11-May-18 Yes
12-May Yes
14-May Yes
14-May Yes
14-May Yes
14-May Yes
14-May Yes
14-May Yes
14-May Yes
14-May Yes
15-May Yes
15-May Yes
15-May Yes
15-May Yes
25-May yes
26-May yes
7-May-18 Yes
Project procedure and plan
JIMT-C02-Q-04-20000 Project Quality Manual
JIMT-C02-Q-04-20001 Project Quality Plan
JIMT-C02-Q-04-20002 Non-conformance Product Control Procedure
JIMT-C02-Q-04-20003 Corrective and Preventive Action Procedure
JIMT-C02-Q-04-20004 Internal Audit Procedure
JIMT-C02-Q-04-20005 Management Review Procedure
JIMT-C02-Q-04-20006 Training Procedure
JIMT-C02-Q-04-20008 Quality Record Control Procedure
JIMT-C02-Q-04-20009 Factory Inspection Procedure
JIMT-C02-Q-04-20010 Material Control Procedure
JIMT-C02-Q-04-20011 Monitoring and Measuring Devices Control Procedure
JIMT-C02-Q-04-20012 Field Inspection Procedure
JIMT-C02-Q-04-20013 General Welding Control Procedure
JIMT-C02-Q-04-20014 Welder and Welding Operator Qualification Procedure
JIMT-C02-Q-04-20015 Welding Consumable Material Control Procedure
JIMT-C02-Q-04-20016 Welding Repair Procedure
JIMT-C02-Q-04-20017 Material Identification and Traceability Procedure
JIMT-C02-Q-04-20018 Punch Handling Procedure
JIMT-C02-Q-04-20020 Inspection and Test Plan for Piling Works
JIMT-C02-Q-04-20022 Inspection and Test Plan for Tank Foundation
JIMT-C02-Q-04-20025 Quality Control Procedure for Tank Fabrication
JIMT-C02-Q-04-20026 Inspection and Test Plan for Tank Fabrication
JIMT-C02-Q-04-20028 Rev 0 - Inspection and Test Plan for Tank Erection
JIMT-C02-Q-04-20034 - Inspection and Test Plan for Piping Works
JIMT-C02-Q-04-20039 Quality Control Procedure for Painting Works
JIMT-C02-Q-04-20040 Inspection and Test Plan for Painting Works
JIMT-C02-Q-04-20041- Non-destructive Testing Procedure
JIMT-C02-Q-04-20053 Inspection and Test Plan for Site Backfilling Works
JIMT-C02-Q-04-20054 WPS & PQR of FCAW for Tank Erection
JIMT-C02-Q-04-20055- Heat Treatment Procedure for Tank Fabrication
JIMT-C02-Q-04-20056 Painting Repair for T61 Bottom Plate Underside
JIMT-C02-Q-04-20057 - WPS and PQR for Tank Fabrication and Erection
JIMT-C02-Q-04-20058 - WPS & PQR (Q345R+304L & Q235B+304L)
JIMT-C02-Q-04-20059 - Inspection Test Plan for Panel installation & visual inspection