RAINY
Clear Fair Cloudy Shower Rain Heavy R. SHOWER
x x RAIN
15 - 20 20 - 25 25 - 30 30 -35 35 -40 HEAVY RAIN x x x x x
TEMP
x NUMBER OF PERSONNEL AND MAJOR EQUIPMENT
Still Low Med High
SUPERINTENDENT
WIND
UNSKILL LABOR.
SKILL LABORERS
TRUCK (WATER)
MESIN POTONG
TOTAL STATION
TRUCK (DUMP)
TRUCK DRIVER
x
TOWER LAMP
COMPACTOR
COMPRESOR
EXCA. H. 450
SUPERVISOR
OPERATOR
FUEL TANK
SURVEYOR
MESIN LAS
MANAGER
FOREMAN
GRADER
LOADER
GENSET
Dry Low Med High
PC 300
PC 200
DOZER
HUMIDITY
LV
x
CONTRACTOR/SUBCON/SUPPLIER HOURS
BEP 18 1 2 1 2 1 1 1
PT.ARJA WAHANA BAKTI 0 1 5 1 1 1 7 1 1 1
BENGKEL LAS KEMBAR REJEKI 9 1 6 1 1 2
ESTIMATED QUANTITIES PROGRESS
LOCATION AND/OR DESCRIPTION OF WORK
ITEM VOL SAT THIS DATE TOTAL
BLOK A HR BEP/ATP Pembangunan HR BEP ATP Pekerjaan Fill Jalan Blok A/LW 95%
BLOK B HR BEP/ATP Cut & Fill 75%
HR BEP/ATP Perkuatan gorong-gorong Container Fabrikasi Besi UNP Container 93%
HR BEP/ATP Pengukuran batas pembebasan lahan Pengukuran batas lahan 5% 85%
REMARKS: Include condition of traffic control and roadway; important discussions with contractor; rejected work or materials and reasons; delays, difficulties, accidents, utility damage and other unusual conditions and events; arrivals and
departures of major equipment, visitors.
PREPARED BY: CERT. NO. SIGNATURE: SHIFT Su. Mo. Tu. Wed. Th. Fr. Sa. WORK DATE:
Asdiansyah 180313.CIV.DPR.BEP DAY/NIGHT x 18-Mar-13
Page 2 of 2