Sie sind auf Seite 1von 27

UNSAFE CONDITIONS IN BOILER # 2 LHS SIDE

Unsafe Condition

Hand Rail / Mid Rail Level in


S.No. / Toe Guard / RHS / LHS
Mtrs.
Gratings / Floor
Openings /
Access /Scrap

1 Access 88 mtr LHS

2 Access 88 mtr LHS

3 Scrap 88 mtr LHS

4 Access 88 mtr LHS

5 Access 81 mtr LHS

6 Hand Rail 81 mtr LHS

7 Toe Guard 81 mtr LHS

8 Hand rail 81 mtr LHS

9 Hand rail 81 mtr LHS

10 Opening 79 mtr LHS

11 Mid Rail 79 mtr LHS

12 Toe Guard 79 mtr LHS

13 Opening 79 mtr LHS

14 Access 79 mtr LHS

15 Hand rail 79 mtr LHS

16 Access 79 mtr LHS

17 Hand Rail 79 mtr LHS

18 Access 75 mtr LHS

19 Toe Guard 72 mtr LHS

20 Access 72 mtr LHS


21 opening 72 mtr LHS

22 Hand rail 72 mtr LHS

23 Hand rail 72 mtr LHS

24 Toe Guard 68 mtr LHS

25 Hand rail 68 mtr LHS

26 Hand rail 68 mtr LHS

27 Hand rail 68 mtr LHS

28 Hand rail 68 mtr LHS

29 Access 65 mtr LHS

30 Access 65 mtr LHS

31 Access 65 mtr LHS

32 Access 65 mtr LHS

33 Hand rail 65 mtr LHS

34 Hand rail 58 mtr LHS

35 Scrap 58 mtr LHS

36 Hand rail 58 mtr LHS

37 Hand rail 58 mtr LHS

38 Toe Guard 58 mtr LHS

39 Access 54 mtr LHS

40 Hand rail 54 mtr LHS

41 Access 54 mtr LHS

42 Hand rail 54 mtr LHS

43 Toe Guard 54 mtr LHS

44 Access 50 mtr LHS

45 Toe Guard 50 mtr LHS

46 Scrap 50 mtr LHS

47 Access 50 mtr LHS


48 Access 50 mtr LHS

49 Hand rail 50 mtr LHS

50 Hand rail 50 mtr LHS

51 Hand rail 50 mtr LHS

52 Access 50 mtr LHS

53 Hand rail 50 mtr LHS

54 Hand rail 48 mtr LHS

55 Access 48 mtr LHS

56 Toe Guard 48 mtr LHS

57 Access 45 mtr LHS

58 Hand rail 45 mtr LHS

59 Hand rail 45 mtr LHS

60 Hand rail 45 mtr LHS

61 Hand rail 45 mtr LHS

62 Toe Guard 45 mtr LHS

63 Toe Guard 42 mtr LHS

64 Hand railing 42 mtr LHS

65 Hand railing 42 mtr LHS

66 Mid Rail 42 mtr LHS

67 Access 39 mtr LHS

68 Toe Guard 39 mtr LHS

69 Access 36 mtr LHS

70 Hand rail 36 mtr LHS

71 Mid Rail 36 mtr LHS

72 Access 36 mtr LHS

73 Hand rail 36 mtr LHS

74 Hand rail 36 mtr LHS


75 Hand rail 36 mtr LHS

76 Hand rail 33 mtr LHS

77 Access 33 mtr LHS

78 Hand rail 33 mtr LHS

79 Toe Guard 33 mtr LHS

80 Hand rail 33 mtr LHS

81 Hand rail 33 mtr LHS

82 openings 33 mtr LHS

83 Hand Rail 30 mts LHS

84 Hand Rail 30 mts LHS

85 Hand Rail 30 mts LHS

86 Hand Rail 30 mts LHS

87 Toe Guard 30 mts LHS

88 Scrap 26 mts LHS

89 Hand Rail 26 mts LHS

90 Hand Rail 26 mts LHS

91 Hand Rail 22 mts. LHS

92 Scrap 22 mts. LHS

93 Hand Rail 22 mts. LHS

94 Hand Rail 22 mts. LHS

95 Hand Rail 22 mts. LHS

96 Access 9 mts LHS

97 Hand rail 9 mts LHS

98 Floor Opening 9 mts LHS

99 Scrap 9 mts LHS

100 Hand Rail APH 25 mts. APH AREA

101 Hand Rail APH 25 mts. APH AREA


102 Scrap APH 25 mts. APH AREA

103 Hand Rail APH 19 mts. APH AREA

104 Scrap APH 19 mts. APH AREA

105 Hand Rail APH 19 mts. APH AREA

106 Floor Opening APH 19 mts. APH AREA

107 Acess 61 mtr LHS

108 Toe Guard 61 mtr LHS

109 Hand rail 61 mtr LHS

110 Scrap 61 mtr LHS


Photo
Unsafe Condition Details Number

Improper access from platform to pent house. 1

Insulation material on access. 2

Loose material scattered on the floor. 3

Impropar cable laying near staircase. 4

Insulation material Kept on access. 5

Hand Rail not provided. 6

Toe guard not provided. 7

Top rail missing near pipe line. 8

Hand rail missing front side of boiler. 9

Unprotected opening near CRH pipe line. 10

Midrail missing near CRH pipe line 11

Toe guard not provided. 12

Unprotected opening near corner of water wall panel. 13

Insulation material kept on access. 14

Hand rail not provided near HRH line. 15

Loose material and Insulation material lying on platform. 16

Top rail missing HRH line. 17

Insulation material improper stacking on access platform. 18

Toe guard not provided. 19

Loose material lying on access 20


Unprotected opening with out handrail near soot blower. 21

Hand rail not provided near water wall panel. 22

Hand rail not provided near main steam valve. 23

Toe guard not provided. 24

Top rail missing near soot blower. 25

Hand rail missing near shoot blower. 26

Hand rail missing near shoot blower. 27

Insulation material kept on access. 28

Debris and loose material kept on platform. 29

Electrical cable and loose material lying on platform near soot blower. 30

Electrical distribution box obstructing access 31

Toe guard not provided. 32

Hand rail not provided near soot blower. 33

Top rail not provided near water wall panel. 34

Loose material haphazardly kept on buckstay. 35

Hand rail not provided near soot blower. 36

Hand rail missing near star column. 37

Toe guard not provided. 38

Loose material kept on access. 39

Mid rail not provided at water wall panel corner. 40

Loose material stacked on platform. 41

Hand rail not provided on temporary platform. 42

Toe guard not provided. 43

Insulation material kept on access. 44

Toe guard not provided. 45

Loose material kept on buckstay 46

Material kept on Acess. 47


Insulation material and scrap kept on access 48

Top rail missing near soot blower at front side of boiler. 49

Hand rail not provided near water wall panel. 50

Hand rail not provided near soot blower . 51

Material kept on access. 52

Hand rail missing near soot blower. 53

Hand rail not provided near water wall panel. 54

Insulation debris and loose material lying on platform 55

Toe guard not provided. 56

Insulation material and hand rail pipes kept on access. 57

Hand rail not provided on platform near water wall panel. 58

Hand rail not provided at water wall panel corner. 59

Top rail not provided near star column. 60

Hand rail missing on platform. 61

Toe guard not provided. 62

Toe guard not provided. 63

Hand rail not provided near soot blower. 64

Hand rail not provided near hanger support 65

Midrail not provided on platform 66

Insulation Material Kept on access. 67

Toe guard not provided. 68

Insulation Material Kept on access. 69

Hand rail missing at water wall panel corner. 70

Mid rail not provided at water wall panel corner. 71

Insulation material and scraps kept on access 72

Hand rail not provided near coal pipe area 73

Top rail missing near water wall panel. 74


Hand rail not provided near coal pipe area at back side of 1st pass 75

Mid rail not provided near duct. 76

Insulation material improperly stacked on access 77

Temporary platform without hand rail. 78

Toe guard not provided. 79

Mid rail missing near star column. 80

Mid rail missing on plat form near water wall panel. 81

Unwanted opening on access 82

Handrail not provided near coal pipe area. 83

Handrail not provided near column 84

Handrail not provided beside down comer joint 1 85

Hand rail not provided beside down comer joint 2 86

Toe guard not provided. 87

Insulation material kept on access. 88

Hand rail not provided near water wall panel. 89

Hand rail not provided near coal pipe. 90

Hand rail not provided, in beetween Instrumentation panel 91

Scrap material kept on acess. 92

Hand rail not provided near down comer. 93

Top rail not provided, beside Wall Deslager 94

Hand rail not provided at water wall panel corner. 95

Scaffolding pipe,Gratings lying on platform. 96

Hand rail not provided on platform. 97

Floor opening, beside duct, near 2nd pass 98

Scrap material kept haphazadly near water wall panel. 99

Handrail not provided near APH Duct 100

Top rail and mid rail missing APH area 101


Scrap material kept on platform. 102

Top rail & Midrail not provided 103

Scrap material not cleared 104

Hand rail not provided 105

Unprotected floor opening on platform 106

Insulation meterial kept on access 107

Toe guard not provided. 108

Hand rail not provided near CRH line. 109

Scrap kept on platform. 110


Compliance Action Details Compliance
(To be submitted by Agency within one week) Date
UNSAFE CONDITIONS IN BOILER #

Unsafe Condition

Hand Rail / Mid Rail Level in


S.No. / Toe Guard / RHS / LHS
Mtrs.
Gratings / Floor
Openings /
Access /Scrap

1 Access 90 mtr RHS

2 Hand Rail 90 mtr RHS

3 Access 90 mtr RHS

4 Scrap 90 mtr RHS

5 Mid Rail & Scrap 87 mtr RHS

6 Hand Rail 87 mtr RHS

7 Access 87 mtr RHS

8 Scrap 85 mtr RHS

9 Access 85 mtr RHS

10 Access 85 mtr RHS

11 Access 82 mtr RHS

12 Toe Guard 82 mtr RHS

13 Hand Rail 82 mtr RHS

14 Hand Rail 82 mtr RHS

15 Toe Guard 82 mtr RHS

16 Access 79 mtr RHS

17 Hand Rail 79 mtr RHS

18 Access 79 mtr RHS

19 Floor Opening 79 mtr RHS

20 Floor Opening 79 mtr RHS


21 Hand Rail 79 mtr RHS

22 Toe Guard 75 mtr RHS

23 Hand Rail 75 mtr RHS

24 Grating 75 mtr RHS

25 Toe Guard 71 mtr RHS

26 Grating 71 mtr RHS

27 Hand Rail 71 mtr RHS

28 Scrap 71 mtr RHS

29 Access 71 mtr RHS

30 Hand Rail 71 mtr RHS

31 Mid Rail 71 mtr RHS

32 Toe Guard 69 mtr RHS

33 Hand Rail 69 mtr RHS

34 Mid Rail 69 mtr RHS

35 Access 65 mtr RHS

36 Toe Guard 58 mtr RHS

37 Mid Rail 58 mtr RHS

38 Access 58 mtr RHS

39 Hand rail 58 mtr RHS

40 Toe Guard 54 mtr RHS

41 Hand Rail 54 mtr RHS

42 Access 54 mtr RHS

43 Access 54 mtr RHS

44 Gratings 54 mtr RHS

45 Toe Guard 51 mtr RHS

46 Access 51 mtr RHS

47 Hand Rail 51 mtr RHS


48 Toe Guard 49 mtr RHS

49 Access 49 mtr RHS

50 Hand Rail 49 mtr RHS

51 Toe Guard 46 mtr RHS

52 Access 46 mtr RHS

53 Hand Rail 46 mtr RHS

54 Hand rail 46 mtr RHS

55 Toe Guard 43 mtr RHS

56 Hand Rail 43 mtr RHS

57 Hand Rail 43 mtr RHS

58 Hand Rail 43 mtr RHS

59 Toe Guard 40 mtr RHS

60 Access 40 mtr RHS

61 Scrap 40 mtr RHS

62 Toe Guard 37 mtr RHS

63 Mid Rail 37 mtr RHS

64 Toe Guard 34 mtr RHS

65 Access 34 mtr RHS

66 Hand Rail 34 mtr RHS

67 Access 34 mtr RHS

68 Hand rail 34 mtr RHS

69 Toe Guard 30 mtr RHS

70 Hand Rail 30 mtr RHS

71 Hand Rail 30 mtr RHS

72 Openings 30 mtr RHS

73 Access 30 mtr RHS

74 Hand Rail 26 mtr RHS


75 Toe Guard 22 mtr RHS

76 Hand Rail 22 mtr RHS

77 Access 12 mtr RHS

78 Access 9 mtr RHS

79 Hand rail 9 mtr RHS


UNSAFE CONDITIONS IN BOILER # 2 RHS SIDE

Photo
Unsafe Condition Details Number

Loose material on gratings near access. 1

No hand rails, mid rails & toe guards. 2

No proper access to up & down on the roof. 3

Scrap near staircase 4

Mid rail missing. Scrap Material all around. 5

No hand rails, mid rails & toe guard at the edge of the pent house. 6

Access obstructed by electrical switch box, insulation debris. 7

Staircase platform obstructed with scrap materials, unused materials. 8

Improper cable laying near staircase obstructing walkway plat form. 9

Unused material blocking access 10

Staircase obstructed by scrap material, unused material, damaged Slings 11

No toe guard provided. 12

Missing of top rails. 13

Hand rail missing near water wall panel. 14

Toe guard not provided near HRH line. 15

Near staircase the access is obstructed with scrap material. 16

Hand rail, mid rail, toe guard missing near HRH pipe line. 17

Insulation sheets hanged near HRH line with a binding wire. 18

Opening at pent house without guard and no access/ladder provided. 19

Opening without hard barricading. 20


Missing of hand rails, mid rails, toe guards at the water wall corner. 21

No toe guards provided. 22

Hand rail, mid rail, toe guard missing at the middle and corner of water panel wall. 23

Grating missing near water panel wall. 24

No toe guards provided rear side of boiler. 25

Grating missing near HRH line. 26

Hand rail, mid rail at the middle and corner of water panel wall. 27

Loose material kept on back stay. 28

Material (pipes) stacked on the access. 29

No hand rails, mid rails, toe guard near RHS main steam bypass valve. 30

Mid rail missing. 31

Toe Guard not provided. 32

Top rail missing. 33

Midrail missing. 34

Pipe pieces lying on platform. 35

No toe guard provided. 36

Midrail missing near HRH Line. 37

Material (pipes,Channel) stacked on access. 38

Hand rail missing at water wall panel corner. 39

Toe Guard not provided. 40

Handrail missing. 41

Insulation material kept on the acess. 42

Loose material found on the access. 43

Grating and railing not provided near buckstay 44

Toe Guard not provided. 45

Insulation material kept on acess. 46

Hand railing not provided. 47


Toe Guard not provided. 48

Loose material found on the access. 49

Top rail missing near water wall panel platform 50

Toe guard not provided. 51

Loose material Kept on access. 52

No hand rail on platform near water wall panel. 53

Top rail missing near down comer pipe line . 54

Toe guard not provided. 55

Railing not provided on platform near water wall panel. 56

Railing not provided near hanger support. 57

Railing not provided on column between S2 and S3 Column 58

Toe Guard not provided. 59

Insulation material Kept on access. 60

Waste material, scrap on the duct. 61

Toe guard not provided. 62

Midrail missing near water wall panel front side of boiler. 63

Toe Guard not provided. 64

Material laying over platform. 65

Handrails are not provided near APH area on access. 66

Loose material lying on platform and also no hand rail provided APH area 67

Hand rail missing near APH corner area. 68

Toe Guard not provided. 69

Hand rail not provided near coal piping area in front side of boiler. 70

Top rail missing near down comer pipe line . 71

Unprotected opening near water pipe line. 72

Material lying on acess. 73

Railing not provided near coal pipe. 74


Toe guard not provided. 75

Hand rail not provided near coal piping area front side of boiler. 76

Loose material laying on platform. 77


Poor housekeeping (Material like scrap, damaged scaffolding pipes, insulation 78
debris, insulation sheets etc.) on floor.

Hand railing not provided. 79


Compliance Action Details Compliance
(To be submitted by Agency within one week) Date