Beruflich Dokumente
Kultur Dokumente
Construction time
County: Alamance
< 6 months (Y/N)?
HQW (Y/N)?
Y
N Elevation Location:
1
Road Name ERODES
Trout (Y/N)? N Tool (ft) Prepared By: Name EROsion DESign
From Sta.: 0 + 0 0 Date Prepared: XX/XX/XXXX
to Sta.: 0 + 0 0 Level III A #: XXX
Right/Left: Rt. No Elev Data % Level III A Expiration: XX/XX/XXXX Version
% Ditch Grade: 0.000 % Reviewed By: Name 2.10.2012
Contributing Date Reviewed: XX/XX/XXXX
R/W Width: 0 feet Level III A #: XXX
Length of Run X 0 feet Level III A Expiration: XX/XX/XXXX
Disturbed Area = 0.00 acres
Drainage Area: 0 acres
*Drainage Area must equal or exceed the Disturbed Area found above
Surface Dewatering Device Y
Is this a Typical Section (Y/N)? Y
Will RUSLE2 be used to model
the Non-Typical sections? N
STEP 2: Ditch Liner requirements: Utilize the Required Liner tab and note recommendations on plans.
*See the HELP Tab for additional clarification and an example on how to place on plans.
OPTION 4A: For DRAINAGE AREA < 3 Acre: Use V=CRKs to determine storage
Regression Constant, C 0
Rainfall Factor, R 0
Erodibility Factor, K 0 From Step 1 above
Soil Type Enter Soil Label and Name
Ditchline Slope, s 0.00000 ft/ft
V= 0.00 ft3/ac/yr
Required Storage Volume= 0.00 ft3 Using 82% of Rainfall Factor-see note in cell
C4 - Move on to Option 4C
OPTION 4B: For DRAINAGE AREA > 3 Acre: Use RUSLE2 Modeling to determine storage
OPTION 4C: Using the Required Storage Volume from Option 4A or 4B to determine # of Wrapped TRSC-A/Wattles Required
* These devices can be used to satisfy the velocity requirements in Step 3.
Storage from Wrapped Type A Rock Silt Checks or Wattles Option of using Wrapped Type A Rock Silt
Enter Ditch Front Slope Gradient (H:V): 0 :1 Checks or Wattles
Enter Ditch Back Slope Gradient (H:V): 0 :1
Enter Device Height: 0.0 ft
Area Behind Device: 0.00 ft2
Length of Ditch Behind Device: N/A ft
#DIV/0!
Storage Behind Device (assumes 65% effeciency): 0.00 ft3
Wrapped TRSC-A/Wattles required: X #DIV/0!
Total #DIV/0! ft3
COMMENTS: *Designer still has the option of using Option 5 or 6
OPTION 5: IF DRAINAGE AREA > 1 Acre: Use Surface Area Calculations to determine storage, A=325Qp
a. Determine the Peak Runoff Rate, Qp (Qp = Q10 (Q25 for HQW or Trout)) USE Q10
Qp=CiA
Runoff Coefficient, C 0 Table 1-4,1-5,1-6
Time of Concentration, tc (minutes)
1 Shortcut Method, tc (A<4.6S)
Watershed Slope, S 0%
tc= 5 minutes
2 Kirpich Method
Flow Path, L 0 feet *see Module 1 Eq. 3
Watershed Slope, S 0 ft/ft *see Module 1 Eq. 3
Kirpich, tc= N/A minutes
Using a Return Period (T) of 10 yrs (25 for HQW) and a tc of 5.00 minutes,
the rainfall intensity, i (in/hr), can be read from Appendix A or the
NOAA website, http://hdsc.nws.noaa.gov/hdsc/pfds/orb/nc_pfds.html
c. Use Surface Area (A) to determine required VOLUME of Temporary Type-B Sediment Dam
Design Depth:
3 3
Required VOLUME using the design depth: 0.00 ft3
* Baffles are required for infiltration and skimmer basins that are located at drainage turnouts.
If the device is greater than 20' in length, it will require 3 baffles. If it is 10'-20' in length, it will require 2 baffles.
If it is less than 10', it will require 1 baffle.
OPTION 6: Alternative Designs
IMPORTANT: Before using Option 6, be sure that the information in Step 1 is accurate!
There may be cases where the RUSLE2 Analysis (Option 4) yields an excessive number of devices to achieve
storage requirements, and site constraints disallow infiltration and skimmer basin (option 5) installation.
Therefore it will be necessary to utilize the option below that best fits your situation. The 60 Day Option
is not available for projects involving HQW or Trout Waters.
30 DAY OPTION
Under these circumstances it will be necessary to provide a minimum of 23% of the storage calculated using
the RUSLE2 analysis (Option 4) during the Clearing and Grubbing Phase. This section must then be permanently
stabilized within 30 days from the time clearing and grubbing begins. This is derived from Table 2-1
of the Level III Reference Manual which indicates that for any given 30 day period in NC, the maximum amount of
Rainfall Energy that can be expected is 23% of the annual total.
In this situation:
23% of RUSLE2 Required Volume: 0.00 ft3
Design Depth (ft): 3 3
Proposed Basin Side Slopes: 1.5 :1 side slopes
60 DAY OPTION
Under these circumstances it will be necessary to provide a minimum of 43% of the storage calculated using
the RUSLE2 analysis (Option 4) during the Clearing and Grubbing Phase. This section must then be permanently
stabilized within 60 days from the time clearing and grubbing begins. This is derived from Table 2-1
of the Level III Reference Manual which indicates that for any given 60 day period in NC, the maximum amount of
Rainfall Energy that can be expected is 43% of the annual total.
In this situation:
43% of RUSLE2 Required Volume: 0.00 ft3
Design Depth (ft): 3 3
Proposed Basin Side Slopes: 1.5 :1 side slopes
GENERAL NOTES:
*If the project involves HQW or Trout Waters, wattles in conjunction with PAM (polyacrylamide) must be installed according
to Step 3 and Option 4 above. If Step 3 does not call for velocity control, an additional wattle will be required
up the grade to deliver the PAM during a runoff event. PAM should not be placed on the last BMP at the outlet.
*If the project does not involve HQW or Trout Waters, install the Type B Rock Silt Checks (TRSC-B) or wattles according to Step 3 and the
Wrapped Type A Rock Silt Checks (TRSC-A) or Wattles according to Option 4. If Option 4 only calls for 1 Wrapped TRSC-A or
wattle, an additional Wrapped TRSC-A or wattle will be required up the grade to deliver the PAM during a runoff event.
PAM should not be placed on the last BMP at the outlet.
*Baffles are required for Silt Basin Type B, infiltration and skimmer basins that are located at drainage turnouts.
-If the device is greater than 20'' in length, it will require 3 baffles. If it is 10''-20'' in length, it will require 2 baffles.
-If it is less than 10', it will require 1 baffle.
*If the Silt Basin Type B, infiltration or skimmer basin can not be installed properly due to the
steepness of the ditchline grade, recommend utilizing the Tiered Basin method to ensure sediment storage is achieved.
*Install a Type A Rock Silt Check or Wattle in conjunction with the Silt Basin Type B, infiltration or skimmer basin.
*Always show required device and dimensions on EC Plan per spreadsheet. If Option 6 is used, note on the plans if this site
must be stabilized within 30 or 60 days from the time clearing and grubbing begins.
COMMENTS:
Temporary Liner (Matting) in Ditchline Calculations (English)
Construction Sheet #
Construction Line (-L-,-Y-,etc.)
Left or Right (LT.,RT.,Median)
Upper Station No.
Upper Station Elevation (ft.)
Lower Station No.
Lower Station Elevation (ft.)
Design Ditch Flow Depth (ft.) 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
Actual Ditch Depth (ft.)
Frontslope Grade (i.e. 2 for 2:1)
Backslope Grade (i.e. 2 for 2:1)
Base Width (ft., 0 for V-Ditches)
Measured Ditchline Length (ft.)
Ditch Grade (%) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Velocity (ft/s) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Shear Stress in Ditch (lb/ft2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ditch Liner Requirement None None None None None None None None None None
Matting Quantity (yd2) 0 0 0 0 0 0 0 0 0 0
PSRM Matting Quantity (yd2) 0 0 0 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
None None None None None None None None None None None None None
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
None None None None None None None None None None None None None
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
None None None None None None None None None None None None None
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
None None None None None None None None None None None None None
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
None None None None None None None None None None None None None
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
None None None None None None None None None None None None None
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
None None None None None None None None None None None None None
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
None None None None None None None None None None None None None
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
None None None None None None None None None None None None None
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
None None None None None None None None None None None None None
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0.33 0.33
0.00 0.00
0.00 0.00
0.00 0.00
None None
0 0
0 0
0.33 0.33
0.00 0.00
0.00 0.00
0.00 0.00
None None
0 0
0 0
0.33 0.33
0.00 0.00
0.00 0.00
0.00 0.00
None None
0 0
0 0
0.33 0.33
0.00 0.00
0.00 0.00
0.00 0.00
None None
0 0
0 0
0.33 0.33
0.00 0.00
0.00 0.00
0.00 0.00
None None
0 0
0 0
0.33 0.33
0.00 0.00
0.00 0.00
0.00 0.00
None None
0 0
0 0
0.33 0.33
0.00 0.00
0.00 0.00
0.00 0.00
None None
0 0
0 0
0.33 0.33
0.00 0.00
0.00 0.00
0.00 0.00
None None
0 0
0 0
0.33 0.33
0.00 0.00
0.00 0.00
0.00 0.00
None None
0 0
0 0
0.33 0.81
0.00 0.00
0.00 0.00
0.00 0.00
None None
0 0
0 0
0 0
0 0
Table 2.7 Regression
Constant, C
Ditch Side Slope
Constan, C
(H:V)
4:1 291
3.5:1 341
3:1 399
2.5:1 467
2:1 549
1.5:1 659
1:1 808
0.75:1 916
0.5:1 1067
B-Horizon
Soil Permeability
Series HSG in/hr
Ailey B 0.6 to 2.0
Appling B 0.6 to 2.0
Autryville A 2.0 to 6.0
Badin B 0.6 to 2.0
Belhaven D 0.2 to 6.0
Cecil B 0.6 to 2.0
Centenary A 6.0 to 20.0
Chastain D 0.06 to 0.2
Chewacla C 0.15 to 0.24
Cowee B 0.6 to 2.0
Creedmoor C 0.2 to 0.6
Emporia C 3.0 to 6.0
Evard B 0.6 to 2.0
Fannin B 0.6 to 2.0
Goldsboro B 0.6 to 2.0
Goldston C 2.0 to 6.0
Gritney C 0.06 to 0.2
Helena C 0.06 to 0.2
Hiwassee B 0.6 to 2.0
Hyde B/D 0.2 to 0.6
Johnston D 1.25 to 1.45
Lynn Haven B/D 1.35 to 1.6
Madison B 0.6 to 2.0
Mayodan B 0.6 to 2.0
Norfolk B 1.30 to 1.75
Pacolet B 0.12 to 0.16
Polkton D 1.15 to 1.60
Portsmouth B/D 0.6 to 2.0
Rains B/D 1.30 to 1.60
Rion B 0.6 to 2.0
Roanoke D < 0.02
Roper B/D 0.16 to 0.46
State B 0.6 to 2.0
Tatum B 1.10 to 1.60
Tomotley A 0.6 to 2.0
Torhunta C 1.35 to 1.60
Vance C 0.06 to 0.2
Wakulla B/D 0.4 to 1.6
Wedowee B 0.6 to 2.0
Weeksville B/D 0.6 to 2.0
White Store D 0.06 to 0.6
Woodington A 0.6 to 2.0
gic Soil Group (HSG), Permeability, K and T values for
typical North Carolina soils.
g/web/wq/ps/csu/classifications
3/ac/yr).
3).
omatically by the percent grade given in Step 1.
.
3/ac/yr).
3).
omatically by the percent grade given in Step 1.
.
m^3.
ell F58.
ard Drawings.
on the project section.
ty (Ksat) refers to the ease with which pores in a saturated soil transmit water. The estimates are
eters per second. They are based on soil characteristics observed in the field, particularly structure,
ed hydraulic conductivity is considered in the design of soil drainage systems and septic tank
te is actually recorded as three separate values in the database. A low value and a high value
bute for the soil component. A "representative" value indicates the expected value of this attribute
oil property, only the representative value is used. The numeric Ksat values have been grouped
ss limits.
Version Revision Notes
03.23.2007.sta Released for use.
05.09.2007.sta Required Storage Worksheet: Made cell H103 (Step 7) display the RUSLE2
volume even if the Drainage Area exceeds 3 acres.
Removed page number references
Corrected Soil Data Mart link
07.13.2007.sta Reference to the Regression Constant Table has been changed from Table 2-6 to Table 2-7 (cell H27)
in the Level III Manual.
07.26.2007.sta Step 5 revised to show that the volume from the equation V=CRKs is actually an annual sediment
volume with units, ft3/ac/yr. V must be multiplied by the disturbed area in order to obtain
the Required Sediment Storage.
The weir calculation in Step 7 was revised to 2/3 of the Sediment Dam width.
The weir calculation in Step 6 was revised to be calculated according to the chart
in the NCDOT Roadway Standard Drawing for a Type B Sediment Dam.
07.27.2007.sta The formula in Cell H103 (Step 7) was revised to include the multiplication by the drainage area.
09.04.2007.sta Updated the Required Liner tab to include the most current version of Matting_english_V5.01c spreadsheet.
12.21.07 Consolidated 09.07.2007 and 09.07.2007.sta into a single spreadsheet.
Required Storage Tab:
Added a Comments sections under Step 5 and Step 7.
Shifted the reference tables to D219 to make future revisions easier.
Divided Step 5 into Step 5A, 5B, and 5C to help handle non-typical situations.
Revised the Weir Reference Chart (D224) to better reflect what the Standard Drawings recommend.
Revised Step 7 to read "30 days from the time clearing and grubbing begins".
Revised Step 7 Cell E26 to read "Type B Basin" instead of "Type B Sediment Dam"
Made it to where the spreadsheet would print on 3 pages. User can customize printable area as needed.
Fixed bug that was making "300" instead of "600" show up in cell B18 when "Beaufort" was chosen.
Revised Step 3 to give the number of checks required and a recommended spacing.
Revised Step 5C to allow for differing front and back slope gradients.
Added a space where user could number pages or sections.
Added section to enter Prepared By, Date Prepared, and Level III Cert # information.
Required Liner Tab: updated to most recent verison of Matting_english_V5.01c spreadsheet
Revised the Help Tab
DID NOT RELEASE THIS VERSION
3.20.2008 Step 7: Added a note concerning the use of wattles in conjunction with PAMs when the project involves
HQW or Trout Waters.
Step 6 and Step 7: Added a note concerning the requirements of using baffles in sediment dams, skimmers,
and basins at drainage outlets.
Step 5: Added a cell for soil type entry.
Step 5: Added a note in the "gray box" to alert the designer to install the first check dam as close to the
outlet as possible and then to space them up the grade evenly.
Revised the Help Tab
DID NOT RELEASE THIS VERSION
4.4.2008 Step 3: Revised to allow for a choice between using Type B Rock Silt checks and Wattles for velocity control.
Added a Tables and Figures Tab
Revised the Help Tab
DID NOT RELEASE THIS VERSION
4.29.2008 Added entry for Trout designation.
Added comments in B5 and B6 to help with determining HQW and Trout water classifications.
Step 3: Revised the gray information box to clarify when Type B Rock Silts and Wattles are required.
Revised the Help Tab
RELEASED FOR USE.
8.4.2008 Updated the Required Liner tab to include the most current version of Matting_english_V5.01c spreadsheet.
RELEASED FOR USE.
10.1.2008 Required Storage Tab:
Added section to enter Reviewed By, Date Reviewed, and Level III Cert # information.
Step 3: Revised section so that Wattles are spaced according to traditional Type B Check spacing intervals.
Step 5: Revised wording to allow Wattles to be used interchangeably with Type A Checks.
Step 7: Added a 60 Day Option
Added Runoff Coefficient Charts (C) and updated the Rainfall Factor (R) diagram in the Tables and Figures Tab.
Revised the Help Tab
DID NOT RELEASE THIS VERSION
10.8.2008 Cell D65: added note to ensure the ditchline depth is adequate for the check height shown.
Renamed Step 5, 6, and & 7 to Option 4, 5, and 6
The variables R, C, and K will now be entered in under Step 1 to ensure they are correct for Option 6 (old Step 7)
Option 6: Removed the influence of cell D4 (no longer takes 23% or 43% of the 82% value if project time is less than 6 months.
Disabled Options 4 and 6 for Non-Typical sections when the designer chooses not to utilize RUSLE2.
DID NOT RELEASE THIS VERSION
12.1.2008 Clarified the defintintion of Non-Typical vs. Typical Section. Revised definition note in cell D17 and on the Help Tab.
The basin volume is now determined by Soil and Water's equation (adopted by Land Quality) to take basin side slopes into consideration.
Revised the Help Tab
DID NOT RELEASED THIS VERSION
5.1.2009 Added notes to Option 4 and Option 6 outlining the requirement to use Wrapped Type A Rock Silt Checks or Wattles to deliver PAM.
Updated the Help Tab
RELEASED FOR USE
5.4.2009 Revised the Basin Designer section for Options 5 & 6 so that the user can now input both the Final Design Top Width and Length.
Removed all other options for the Basin Designers now that the user can build their own. Must meet 2:1 (L:W) ratio.
RELEASED FOR USE
6.4.2009 Fixed problem with the design depth in Option 7's 60 Day Option.
Updated the Required Liner Tab with Soil and Water's most recent version.
RELEASED FOR USE
11.1.2011 Added 1 acre or greater must utilize surface dewatering device
Updated Option 5 and 6 basin designs to include skimmer orifice design and infiltration analysis.
Updated Notes throughout Required Storage tab
Updated HELP tab
RELEASED FOR USE
2.10.2011 Removed skimmer and infiltration basin design from Option 6
Updated HELP tab
Updated Notes throughout Required Storage tab
RELEASED FOR USE