Proceedings of the ASME 2015 Pressure Vessels and Piping Conference

PVP2015
July 19-23, 2015, Boston, Massachusetts, USA

PVP2015-45938

EFFECTIVE IMPLEMENTATION OF RISK BASED INSPECTION (RBI) APPROACH IN


ASSET INTEGRITY MANAGEMENT OF OIL AND GAS FACILITIES

Joseph Akanni
Senior Inspection Engineer
Shell Nigeria Exploration and Production Co,
Nigeria

Oladipo Alonge
Materials, Corrosion and Inspection Engineer
Shell Petroleum Development Company of Nigeria Ltd.

ABSTRACT or production facility by considering all credible damage


Effective implementation of asset integrity mechanisms that could be expected to affect an
management in oil and gas facilities requires a structured equipment and identification of other risk-reducing
approach to the inspection of all equipment to get actions. Risk levels are prioritized in a systematic manner
maximum value for time and resources. This is what Risk so that an inspection programme can be planned that
Based Inspection (RBI) strives to achieve by optimizing focuses resources on higher risk equipment while
inspection and monitoring efforts based on degradation reducing lower value inspection activities.
effects and other associated risks. The risk based
approach entails a detailed assessment of all possible The RBI plan produced combined with a set of integrity
degradation mechanisms for equipment, operating operating windows for process units in a facility provide
context of the facility as well as the health, safety and the basis for asset integrity management in oil and gas
environment impact of equipment failure. All these facilities. Technical integrity is maintained by executing
assessments and considerations extend the impact of inspections and process monitoring at the right locations
RBI beyond its initial objective of achieving an optimised using appropriate techniques with the appropriate
inspection frequency to also ensuring process safety, coverage and at the right frequencies.
increased understanding of degradation risk and assuring
asset integrity. Corrosion control and mitigating impact of degradation is
This paper focuses on the workflow, process, benefits a general business challenge and areas for consideration
and challenges of a typical RBI implementation for static include but are not limited to the following:
equipment in facilities. • Effective management of degradation
• Optimal use of existing and new inspection methods
INTRODUCTION • Fixed inspection intervals for all equipment regardless
of degradation mechanisms, operating environment and
The objectives of Risk Based Inspection (RBI) are to process conditions.
determine inspection scope, extent, locations and • Deferment of production/extended turn around for
optimised inspection cycle for static equipment based on unnecessary inspection
susceptibility to failure, the health, safety, environmental
and economic risks of its operation and remnant life of the RBI implementation is a proactive approach to addressing
equipment. Thus, RBI is a process which comprises risk these business challenges by replacing time based
analysis to develop effective/optimized inspection inspection with the application of flexible periodic
plan/requirements for static process equipment in a plant inspection programmes using risk assessment based on

1 Copyright © 2015 by ASME

Downloaded From: http://proceedings.asmedigitalcollection.asme.org/ on 01/30/2016 Terms of Use: http://www.asme.org/about-asme/terms-of-use


operational, materials, environmental parameters and the • Generating the loop descriptions (loop, process
operating conditions of equipment in a facility. and corrosion)
• Reviewing loop description and development of
integrity operating window
RBI is applicable to static equipment such as process
• Assessing criticality of failure, confidence rating
piping, pressure vessels, heat exchangers, above ground
storage tanks and pressure relief devices, boilers and and inspection interval
heaters. It takes into account only degradation • Determine the maximum inspection intervals
mechanisms related to the operation of an installation • Recommend appropriate inspection strategy for
(corrosion, fatigue, etc.). Failures resulting from non-age related failure
excursions outside the defined Integrity Operating • Inspection and process monitoring planning
Window (IOW) are not considered.

NOMENCLATURE

CUI Corrosion Under Insulation


IOW Integrity Operating Window
MIC Microbial Induced Corrosion
RBI Risk Based Inspection
Stf Susceptibility to failure

RBI ASSESSMENT WORKFLOW

The implementation of RBI in any asset starts with an


assessment process which typically requires a workshop.
The RBI assessment is a multidisciplinary task and it is
best to nominate a core team consisting of the:

• Inspector;
• Asset operator; Figure 1: RBI Assessment Workshop Workflow
• Maintenance engineer
Asset Integrity Data
• Process engineer/Technologist
• Materials & Corrosion engineer The RBI process starts with a precise definition of its
• Representatives of local legislative body boundaries and identifying all static equipment to be
included. The next step is to compile and check all
The RBI team may be supplemented by additional relevant asset integrity data such as:
expertise including production chemist and IT support • Process data and drawings
engineer on an ad hoc basis. • Engineering design data
• Description and evaluation of degradation
It is essential to bring together all relevant information mechanisms
including asset integrity data in preparation for the RBI • Compilation of inspection history
assessment. After completion of the preparation, the
workshop which is preferably off-site can be organised. It The RBI is a live process and must include update of the
is best practise to schedule the RBI workshop as full week asset integrity database with results of inspections,
or 2 week session depending on the asset and equipment monitoring and process/asset changes. This will
to be assessed. progressively eliminate uncertainties in assessments and
calculations, and result in an effective inspection
The RBI assessment workflow is represented in Figure 1 programme.
and also stated below:
Corrosion Loop Definition
• Review of asset integrity data
• Identification of corrosion loops All facilities are subjected to several potential degradation
• Marking of the loops on PEFS mechanisms, which need to be carefully controlled to

2 Copyright © 2015 by ASME

Downloaded From: http://proceedings.asmedigitalcollection.asme.org/ on 01/30/2016 Terms of Use: http://www.asme.org/about-asme/terms-of-use


avoid unsafe situations and /or high costs. Corrosion The worst case determines the overall consequence
loops are means to describe and control degradation class.
mechanisms in sections of a facility. They contribute
immensely to improving the application of correct The economic consequence considers the financial effect
inspection techniques. A corrosion loop is a section of a of a failure on assets and production. Damage to assets
facility that: typically includes material and labour costs of repair
and/or replacement of equipment. Costs associated with
• Consists of similar materials of construction: this product value such as lost revenues due to production
means that pipings are made of similar piping losses are also determined. Production loss is deferred
classes and equipment are made of comparable income plus product wasted.
materials.
• Operates under similar process conditions: this Health and safety consequences consider impact effects
means that for each corrosion loop, the corrosive of equipment failure on humans and also mitigating
species shall be the same throughout the loop factors. Exposure of people in a hazardous zone and the
and temperatures shall be such that no stepwise possibility of averting a hazardous event are also
changes in corrosion phenomena occur. considered.
• Exposed to similar degradation/corrosion
mechanisms and rates. The environmental consequences of an incident consider
the effects of liquid release on soil and water and also the
The RBI assessments consider all possible degradation release of gas which result in pollution of the atmosphere.
mechanisms that the equipment is exposed to. The
mechanisms are considered as age related and non-age
related. Age related degradation rate can be measured
Confidence Rating
and its trend established over time while non-age related
failures tend to occur suddenly and it is usually not This reflects the confidence that the inspector and the
possible to estimate a degradation rate or remnant life, as
corrosion engineer have in the assessment of
they are dependent more on process conditions and
generally associated with excursions outside the IOW. Susceptibility to Failure and for age-related failure failures,
the remnant life. It depends on their judgement on the
Some of the commonly addressed degradation stability and control of degradation mechanisms; the
mechanisms include CO2 corrosion, Microbial Induced number and quality of inspections carried out; and
Corrosion (MIC), Oxygen corrosion, under deposit whether reliable process (Integrity Operating Window)
corrosion, erosion corrosion, fatigue and Corrosion Under monitoring is carried out.
Insulation (CUI) etc.
Confidence rating is one of the parameters that determine
Criticality Assessment inspection intervals or process monitoring extent.

Criticality is the combination of two parameters; the Remnant Life Determination


susceptibility to failure (StF) and the consequences of
failure. Criticality is failure mode related and for each The assessment of remnant life of equipment with regard
important failure mode, the aforementioned parameters to degradation mechanism and failure characteristics is
have to be determined. essential to the RBI process.

The susceptibility to failure is subdivided into 4 classes: For non-age related (random) failure characteristics, the
negligible, low, medium and high. It is assessed using remnant life cannot be assessed because the onset and
questionnaires based on relevant information regarding rate of degradation cannot be predicted. These failure
process conditions, degradation mechanisms and also the characteristics require a separate approach based on
materials, corrosion and inspection knowledge. control of internal and/or external operating conditions. A
proper monitoring scheme for the integrity operating
Three consequence categories are considered for a window should be agreed for such cases.
failure mode: economic, health/safety and environment.

3 Copyright © 2015 by ASME

Downloaded From: http://proceedings.asmedigitalcollection.asme.org/ on 01/30/2016 Terms of Use: http://www.asme.org/about-asme/terms-of-use


Age related (trendable) degradation mechanisms allow a corrosion loop. Examples are welds, nozzles and dead
quantitative determination of the remnant life. For legs.
degradation mechanisms that cause wall thinning, the
remnant life can be assessed by considering the Technique: An inspection technique matching the credible
remaining corrosion allowance and the corrosion rate. degradation mechanisms must be selected. For example,
to monitor pitting in small-bore piping, radiography is more
Remnant life = Remaining corrosion allowance/Selected appropriate as opposed to the use of ultrasonic wall
corrosion rate. thickness measurements. However, the latter technique is
more suitable for monitoring general wall loss. Similarly,
When an item’s failure mechanism is a result of appropriate process monitoring to reliably monitor the
simultaneous degradation, calculation of the remnant life integrity operating window must be selected.
should be based on the worst case corrosion rate, e.g.
addition of internal and external corrosion rates. Coverage: The inspection coverage describes the amount
Alternatively, the remaining corrosion allowance may be of affected area to be inspected to confidently monitor the
split over the competing degradation mechanisms. condition of an item and where possible, predict its
remaining life.

Inspection/Process Monitoring Plan Frequency: This is the frequency determined by the


criticality, confidence rating and remaining life of
For age related degradation, the criticality values together equipment. This frequency may vary as the confidence
with the confidence rating are used to determine the rating and remaining life can change over time.
maximum inspection interval as a fraction of remnant life.
This fraction, inspection interval factor is established by
combining the confidence rating and criticality. The Update/Review
remnant life is multiplied by the interval factor to derive a
maximum inspection interval. After the inspection tasks have been executed, it is
important to update the asset database. Information like
Maximum inspection interval = Interval factor X Remnant inspection and test results, condition monitoring data and
life actual condition revealed during the maintenance tasks
shall be fed back into the system. It is necessary to review
A recommended maximum inspection interval defined by RBI analyses regularly. Events that typically prompt a
local legislation may only be exceeded after approval by review are plant shutdown, major integrity operating
the statutory body. window excursion and major plant change including
changes in process conditions.
For non-age related degradation, it is not possible to
estimate a remnant life as this form of degradation is In order to realise the full benefits of an RBI study, it is
more dependent on process conditions and it is very necessary to link the output of RBI to the maintenance
difficult to establish a time-dependent degradation rate. management system or processes. This will enable the
Very high degradation rates and rapid changes are workflow to be managed, equipment condition to be
possible if the process conditions are not properly recorded and performance trends to be analysed.
controlled. For this reason, it should be recognised that
time based inspections cannot help in preventing the RBI Team Responsibilities
failure of these equipment. Process monitoring (Integrity
Operating Window) monitoring is most essential here. The section gives a typical description of the
An inspection task is defined by the following parameters: responsibilities in the RBI process. The Table 1 below
delineates process steps and also who is responsible.
Location: This refers to the location representative of the “RBI” in the table stands for the complete RBI team, “M”
condition of the subject equipment or system. for the materials and corrosion engineer, “I” for the asset
Representative locations (affected area) can usually be inspector, “PO” for the process/operations engineer and
derived from the corrosion description/analysis for the “ME” for the maintenance engineer.

4 Copyright © 2015 by ASME

Downloaded From: http://proceedings.asmedigitalcollection.asme.org/ on 01/30/2016 Terms of Use: http://www.asme.org/about-asme/terms-of-use


Table 1: Typical RBI Responsibility Chart The IOW is established from only measurable and
controllable parameters and is usually determined for a
Responsible definite corrosion loop based on design, operational
S/N Section Contents Party considerations and economic considerations to
1 Asset integrity Acceptance of data in the I assure asset integrity. The IOW is the basis for risk
database asset integrity database assessment and operating outside of the defined
limits will have negative impact on the integrity of the
2 Production Define production loss PO
asset/equipment and inspection strategies derived
loss equation rate (dollars per hour) in
from the analysis.
case of business
interruption for The parameters used to define IOW should have one
subsequent time intervals or more of the following characteristics:
3 Repair cost Calculate all costs and ME
and time time required to restore a • IOW parameters are either single,
failed equipment to its independently controlled process variables
required performance
such as temperature, pressure, pH, chemical
4 Labour cost Calculate the labour costs ME
related to a specific injection rate, concentration, etc. or they are
failure calculated variables such as flow ratios, dew
5 Corrosion loop Define corrosion loops on RBI point conditions etc.
definition process diagrams
6 Corrosion loop Prepare descriptions of all O&M • The IOW can be based on a physical
description credible corrosion condition of the equipment, such as degree of
mechanisms, their vibration.
morphologies, areas of
susceptibility and In order to achieve a controllable IOW, the
materials of construction parameters establishing the IOW must meet the
7 Process Prepare a corrosion PO
following criteria:
description oriented process
description for each loop
8 Criticality Answer probability and RBI • All IOW parameters must be quantifiable and
rating consequence questions the measurement of each parameter must
9 Equipment Briefly outline historical I become an established procedure
history inspection results and
calculate actual corrosion • All IOW parameters must be either controlled
rates by the operating or inspection staff or they
10 Confidence Assign confidence rating RBI should themselves control the maintenance
rating and inspection schedules.
11 Remnant life Determine remnant life RBI
12 Inspection Inspection scope, I It is important to monitor the operating parameters
plan strategy and specific identified as part of the IOW during the RBI study.
recommendations This monitoring of the integrity operating window is a
condition of assuring the validity of the maximum
INTEGRITY OPERATING WINDOW (IOW) inspection intervals recommended in the RBI study. The
monitored parameters are also to be used in trending of
The integrity operating window (IOW) is a key deliverable relevant degradation mechanisms and fitness for purpose
for the RBI assessment. It represents a further limitation assessment of facilities as they approach end of design
within the broader plant Operating Window, and refers to life. Hence, quantification and monitoring of IOW
the recommended range of values for relevant operating parameters results in building higher confidence in the
(corrosion and process) parameters to be monitored in carious degradation modes, increasing remnant life of
the process fluid. The broader plant Operating Window is equipment and improving equipment integrity.
established from the process and equipment design and
is safeguarded by alarms, trips, pressure relief valves and RBI BENEFITS
other delimiting devices, but it may not have fully
addressed all possible degradation issues. The Benefits of implementing RBI on a facility are
numerous with positive impacts on the business, process

5 Copyright © 2015 by ASME

Downloaded From: http://proceedings.asmedigitalcollection.asme.org/ on 01/30/2016 Terms of Use: http://www.asme.org/about-asme/terms-of-use


safety, people and the overall technical integrity of assets • Company leadership commitment for
as listed below: implementation
• Commitment and competence of members of RBI
Business
• Reduced maintenance cost: cost saving from team
optimized inspection cycle and reduced • Timely availability of resources
scheduled deferment • Quality of asset integrity data available
• Effective use of resources with less unplanned • Ownership of RBI implementation process by
inspection plant/asset team
• Increased equipment availability and reduced • Participation of local regulatory bodies – capturing
shutdown scope: RBI provides basis for concerns and demonstrating compliance
lengthening inspection intervals and optimising
CHALLENGES
maintenance and inspection scope for less critical
items. Also, equipment can be monitored on- Typical Challenges encountered in implementing RBI are:
stream in lieu of the traditional out-of-service
methods. • Unavailability of adequate Inspection history
• Basis for assurance of asset technical integrity to which makes it difficult to establish actual
stakeholders (Regulators/Audits) corrosion rates
• Data quality and assurance
Process safety • Limited inspection tools/methods in place
• Identification of highly critical static equipment • Insufficient information to fully assess some non-
and required inspection age related failures
• Identification of safe integrity operating window
• Improved knowledge of the facility risk and
degradation mechanisms RECOMMENDATIONS
• Enhance assessment for impact of process
Recommendations for improvement of the process and to
change on asset integrity
obtain maximum value for work done are:
• Compliance with changing Health, Safety and
Environment (HSE) and legal requirements • Deploy enhanced inspection method – improved
techniques and other non-intrusive methods
People • Ensure effective monitoring of Integrity Operating
• Collaboration among relevant disciplines Window (IOW) to assure the validity of inspection
responsible for asset integrity tasks recommended in the RBI study
• Cross-discipline competence development: • Conduct Fitness for Service (FFS) assessment of
improved corrosion/degradation knowledge for critical equipment. An assessment of fitness for
plant operators and plant operations knowledge continued service is a key part of RBI
for inspectors implementation as it further helps to accomplish
• RBI awareness for workshop participants across effective degradation risk reduction.
all disciplines • Ensure update of asset integrity database and
• Enhance inspector’s competence in risk based review RBI analysis either on a period or ad-hoc
monitoring approach basis to ensure that most recent inspection and
maintenance information are included.
Industry
• Identifying areas for application of new
REFERENCES
technologies in facilities
1. Akanni Joseph, Oseahon Edmund, “Managing
Corrosion with Risk Based Inspection (RBI)” Paper at
RBI IMPLEMENTATION CRITICAL SUCCESS Offshore West Africa (OWA) Conference 2015
FACTORS
There are certain factors and conditions that contribute to 2. Risk-Based Inspection Downstream Segment
a successful implementation of RBI approach. These API RECOMMENDED PRACTICE 580
critical success factors are: Second Edition, November 2009

6 Copyright © 2015 by ASME