Beruflich Dokumente
Kultur Dokumente
FE
FDC
PIPE HANGER
TWO WAY BRACE PIPE HANGER
PIPE SLEEVE
1 16
FHC FHC
FHC FHC
ELEVATION
GROUND FLOOR LINE
DET. OF FIRE DEPT. CONNECTION FIRE HOSE CABINET DETAIL FIRE EXTINGUISHER DETAIL
REVIEWED AS TO
DESIGNED: SUBMITTED: RECOMMENDING APPROVAL APPROVED:(FOR ISSUANCE) PROJECT & LOCATION / BARANGAY: SHEET CONTENTS: SET NO. SHEET NO.
DESIGN CONCEPT:
VARIOUS DPWH
PARTIAL GROUND FLOOR (SHOWING LOCATION OF
PROPOSED PROJECTS
(SEE COVER SHEET) (SEE COVER SHEET) CISTERN, PARTIAL ROOF PLAN, ELEVATION OF BOD
MANUEL D. TORRES PABLO G. RACINES STANDARD TWO-STOREY OVERHEAD WATER TANK, ISOMETRIC DIAGRAM OF 51
MECHANICAL DESIGN MANAGING PARTNER JOSEPHINE P. ISTURIS DANTE B. POTANTE RAUL C. ASIS SCHOOL BUILDING WATER PUMPING SYSTEM, SCHEMATIC DIAGRAM FP-2
POSITION: MECHANICAL ENGINEER
OF WATER LEVEL CONTROL, LEGEND, SCHEDULE 57
PRC No.: 2195 TIN No.: 145-553-983 CHIEF, DIRECTOR IV, BOD UNDERSECRETARY ( 8 - CLASSROOMS )
PTR No.: 3399286 BUILDINGS DIVISION, BOD (REVISED 3-24-17) OF EQUIPMENT