Sie sind auf Seite 1von 105

 

                                                               

     SAFETY MANUAL 
 

   

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

ISSUE DATE: DECEMBER, 2008 

 
 

Document Control 

 Issue Approval 

 
Mr. Virender Gupta 
 
Senior Associate Director 
23.08.2007 

  Date 
Signature 
 
Mr. T.R.Perumal Chetty,  
   
Dy.General Manager(Safety) 
23.08.2007 

  Signature  Date 

Register of Amendments 

This summary table will accompany amendments.  Discard the previous Table and replace it with the 
latest version. 

Date Of Issue  Section(s)  Amendment No.  Description 

June,2007  ‐  Revision‐ 0  Approved by Associate Director. 

23 Aug, 2007  18 & 19  Revision ‐ 1  Approved by Senior Associate Director. 

Dec, 2008  9,13,14,15,16,17,  Revision‐2  Approved by Senior Associate Director. 

Abbreviations 

EHS  Environment, Health & Safety 

OHS&E or HS&E   Alternative common terms for Environment, Health & Safety 

PM  Project Manager  

AM  Asst. Manager – Projects 

PC  Project Coordinator 

CBRE  CB Richard Ellis 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 2 of 105 
 

Contents                                  Page   

Document control                  2                                         
Issue Approval                      2                               
Register of Amendments                         2                 
Abbreviations                    2                                  

1. Introduction                    6                            
2.EHS Policy                    7                        
3.Safety Instructions and Procedures                       9                              
4.Roles and Responsibilities                9 
5.Communication                  11                                
6. Monitoring                    12   
7.Documentation                  12                     
8.Project Safety Committee                12     
9.Applicable Statutory Acts, Rules & IS Codes            13                              
9.1 Project Compliance Check‐list              16                               
10. Non‐Compliance of Safety and Health provisions          19                                   
11. Disciplinary Action                  19                                
12.Environment                   20                             
12.1 Noise                    20                                 
12.2 Material Safety Data Sheets (MSDS)            21                  
12.3 Waste Disposal                  21                            
12.4 House –Keeping                  21                         
12.5 Public protection                  21                      
13.Health                    21                                 
13.1 First‐aid                    21                                     
13.2 Contents of First‐aid box                23                            
13.3 Drinking Water                  24                                  
13.4 Latrines and Urinals                24                                  
13.5 Anti‐Malarial Precaution                24                            
14. Safety                    24                              
14.1 Excavation                   24                                   
14.2 Pilling                    25                       
14.3 Mobile Plant                  25                              
14.4 Concrete Vibrators                 26                           
14.5 Concrete Mixture                  26                            
14.6 Hoists, Cranes                  27                           
14.7 Motor Vehicles                  27                      
14.8 Trucks                    28                            
14.9 Traffic                    28                           
14.10 Fire Protection                  28                          
14.11 Ladders                    29                          
14.12 Scaffolding/Staging                29                           
14.13 Form Work                  30                         
14.14 Concrete Construction                30                          
14.15 Barricades                  31                         
14.16 Demolition                  31                          
14.17 Painting                    31                          
14.18 Welding and Gas cutting                32                          
14.19 Grinding                    33                            

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 3 of 105 
 

14.20 Work in Radiation Area                33                          
14.21Work in and around Water bodies             33                           
14.22 Guide lines and General procedures for use of Electricity at site      33                            
14.23 Installation                  34                           
14.24 Portable Electrical Equipment              36                 
15.General                    36                              
15.1 EHS Trainings                  36                               
15.1.1 EHS Induction                  36                       
15.1.2 Periodical training programmes              36                              
15.2 Hazard Identification &Control measures            37                            
15.2.1 EHS Inspections                  37                           
15.2.2 EHS audits                  37                        
15.2.3 Risk Assessment                  38                                 
15.3 Safe Work Permit System                38                                
15.4 Blasting Permit                  39                               
15.5 Excavation Permit                  42                              
15.6 Work at height Permit                44                            
15.7 Hot‐work Permit                  46                          
15.8 Confined space Permit                48                             
15.9 Isolated area Permit                50                           
15.10 Accident reporting & Investigation            51                             
15.11 Educating Labour                 51                                   
15.12 Reporting of accidents                51                               
15.13 Emergency Evacuation Plan              51                          
15.14 Personal Protective Equipment              52                         
15.15 Project EHS‐Status                52                      
15.16 Site Entry process                 53                             
16  Formats                    53                             
16.1 Site Safety Rules                  53                           
16.2 EHS Responsibility & Accountability for Contractors         55                               
16.3 EHS Induction                  56                         
16.4 Safety Pep‐talk                  57                            
16.5 Incident/Accident Investigation Report            58                               
16.6 EHS Inspection                  59                     
16.7 On the job safety Communications             60                             
16.8 EHS Status Report                  61                          
16.9 Safety Committee meeting               62                        
16.10 EHS Penality                  63                              
17. Safety Check‐Lists                  64                            
17.1General Safety                  64                           
17.2 Daily Inspection check‐list for Safety measures at site        66                             
17.3 Site‐Layout                  68                         
17.4 Personal Protective Equipment              69                          
17.5 Material Handling                  70                            
17.6 Material Storage                  71                          
17.7 Fire Prevention & Control                72                             
17.8 Excavation                   73                        
17.9 Demolition                   75                          
17.10 Scaffoldings                  76                         
17.11 Confined Space                  77                       
17.12 Radiography                  78                         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 4 of 105 
 

17.13 Painting                    79                     
17.14 Work at Height                  80                        
17.15 Electrical                    82                        
17.16 Hot‐work                   83                     
17.17 Form‐work                  85                           
17.18 Fall Prevention & Protection              86                         
17.19 Hand tools                  87                       
17.20 Vehicles,Equipment & Eart moving equipment          89                           
17.21 Cranes                    90                       
17.22 Tower Cranes                  92                      
17.23 Builders Hoist                  96                       
17.24 Transit Mixer                  98                      
17.25 Diesel Generator                  99                          
17.26 Motor Vehicles and Traffic              100                     
17.27 Plant & Mobile equipment              101                  
17.28 House‐Keeping                  103                     
18. Project Safety Documents                104                          
18.1 List of Project Safety Documents tobe maintained by CBRE        104                        
18.2 List of Welfare Documents required for Inspection          105   

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 5 of 105 
 

1 INTRODUCTION 

 
The  meaning  of  safety  is  ‘Freedom  from  unacceptable  risks’  or  ‘Freedom  from  danger’.  Safety  in  all 
construction  activities  is  a  prime  requisite,  but  is  often  neglected,  ignored  on  work  sites.  With  the 
enormous  growth  of  construction  industry  and  the  advancement  of  ‘Construction  Technology’  the 
need  for  proper  attention  to  Safety  aspects  has  become  essential  for  human,  social,  economic  and 
other  considerations.  The  complex  techniques  with  wide  range  of  construction  and  other  activities 
have lead to new challenges in Safety. 
 
The content aims is to explain the ways and means to create a safe and healthy work environment at 
our construction project sites for the protection of all personnel involved in the project construction 
activities from associated risks. 
 
The  EHS  plan  is  structured  for  effective  implementation  of  EHS  standards  as  per  the  Factories  Act 
1948, Amendment act 1987, Building and Other Construction Workers Act ‐1996 (BOCW Act‐1996) and 
other relevant State and central Acts of Govt., of India. 
 
The purpose of the EHS Plan is to make all our employees, contractors, consultants, workmen aware of 
minimum safety standards to be adhered in the process of execution of construction activities for the 
noble cause of accident prevention and to protect all from associated risks. 
 
The  overall  objective  of  the  plan  is  to  ensure  effective  implementation  of  Company  standards  and 
comply with all statutory provisions related to Environment, Health and Safety (EHS) and also to meet 
client’s specific EHS requirements 
 
Proper precautions based on risk assessments should be taken to improve Safety on construction sites 
to mitigate and minimize loss of limb, life, suffering and damage resulting from preventable incidents / 
accidents. 

CONTRACTUAL RESPONSIBILITES & MANAGEMENT COMMITMENT: 

It  is  the  prime  responsibility  of  project  management  to  prevent  /  control  all  risks  involved  in  the 
process of project construction. All contractors/Sub‐contractors and their staff and workmen  must co‐
operate in implementation of EHS rules and regulations mentioned in EHS plan without any excuse in 
the  interest  of  safe  guarding  Environment  health  and  safety  at  protect  site.  It  is  of  contractual 
responsibility  of  all  concerned  to  maintain  client’s  reputation  and  to  take  care  of  workers  safety  & 
welfare  as  a  social  obligation.  The  basic  requirement  of  plan  is  to  achieve  EHS  goals  for  successful 
completion of project.  

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 6 of 105 
 

  

2 EHS POLICY 

Management  of  CB  Richard  Ellis  South  Asia  Pvt  Ltd  is  vitally  interested  in  Safety  and  Health  of  its 
employees  and  attaches  utmost  importance  to  safeguard  the  employees  from  injury,  occupational 
disease  and  environment.  Management  shall  make  every  effort  to  provide  a  Safe,  Healthy  working 
Environment.    Ensures  that  the  plant,  machinery,  equipment  are  safe  for  use  in  compliance  with 
established safe working procedures and practices. 
 
The company has made it a requirement that all who work with us, visit us or do business with us must 
comply with CBRE‐  EHS policy.  It is  in  the  best interest of  practices  to consider  Environment,  Health 
and  Safety  in  every  activity.  Commitment  to  Health  and  Safety  forms  an  integral  part  of  this 
organization from management to the workers. 
 
We shall operate our projects in such a way that the Safety and Health of our employees, contractors, 
visitors  local  residents  and  Environment,  are  ensured  and  they  will  not  be  exposed  to  unacceptable 
risks. 
 
 

2.1* Company’s Health, Safety and Environment Policy is Enclosed 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 7 of 105 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 8 of 105 
 

  SAFETY ORGANISATION 
 
 
*   Safety Organization chart. 
 

3 SAFETY INSTRUCTIONS AND PROCEDURES 

• Clear safety instructions and procedures are the basis for functioning of all at site. These safety 
instructions and procedures are the minimum safety requirements to be followed by all always at 
site.   
• Every  employee,  contractor  and  visitor  is  responsible  for  fulfilling  all  safety  instructions  and 
procedures. 
• Report unsafe conditions, situations and handlings to the Project Manager. 
• Safety  instructions  from  Management,  Safety  team  and  site  conditions,  generated  are  to  be 
followed. 
• First Aid, Fire section, concerning Safety and Health care are to be followed always. 

4 ROLES AND RESPONSIBILITIES 

The  Project  Manager  CBRE  shall  be  totally  responsible  for  compliance,  implementation  of  Health, 
safety and Environment Policy.  

1. Project Manager 

• Responsible  for  the  overall  management  of  safety,  safety  planning  and  organization  on  this 
site. 
• The  Project  Manager  is  the  team  leader  and  should  be  the  role  model  for  all  staff  and 
employees to follow. 
• Prepare and instigate safety policy and procedures  on site, delegate responsibilities to other 
competent persons, then check these roles and responsibilities are fulfilled. 
• Fix the roles and responsibilities in writing and ensure they are fulfilled for each staff member 
so as each person is aware of and complying with his role. 
• Attend all safety meetings. 
• Review Safety Plans and Workplace Risk Assessments prepared by the contractors prior to that 
trade being given commitment and starting on site. 
• Review preliminary design and drawings for potential safety risks and advise the Consultants 
of these and remedies for same. 
• Carry  out  informal  and  formal  safety  inspections  when  on  site  and  report  findings  to  the 
Contractor for rectification. 
• Set a personal example of implementing the Project Safety Policy. 
• Educate  contractors  to  be  fully  conversant  with  all  CB  Richard  Ellis  safety  requirements  and 
incorporation of safe work practices in their operations. 
• Ensure contractor Safety Plans are implemented and modified as necessary on site. 
In connection with Indian Standards and Regulations the tasks and responsibilities of Safety and Health 
Manager as well as the Design‐engineer are defined at the design & construction phase: 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 9 of 105 
 

Safety Manager‐At Design Phase: 

• Co‐ordination of general aspects with respect to Safety, Health and Welfare. 
• Taking  care  of  EHS  plan  setup  in  “Draft”.  Putting  together  Safety  Health  &                
Environment files. 
• Handover EHS plan in draft and filed to the client for the construction phase. 

Safety Manager—At Construction Phase: 

• Organizing, coordinating and Co‐operation between contractors. 
• Co‐coordinating Safety, Health, Welfare measures by the contractors. 
• Co‐coordinating Supervision; to meet the joint facilities. 

Consultants 

• To  be  briefed  and  educated  by  the  Project  team  on  their  responsibilities  with  regards  to 
‘designing in safety’. 
• To  be  educated  and  shown  safety  problems  with  their  design  on  site  so  as  not  to  make  the 
same mistakes again. 
• To nominate, areas requiring special procedures or practices to reduce accident potential. 
• To  be  briefed  by  the  site  team  on  the  proposed  construction  methods  and  be  subsequently 
updated. 
• To take a pro‐active role in safety as part of the ‘Project Team’. 

Contractors and Their Employees 

• Safety  representative  from  each  company  to  be  nominated  to  attend  safety  meetings  on  a 
weekly basis.  The days of the meeting will be nominated by CB Richard Ellis. 
• The nominated person for the company will be responsible for all details and safety issues of 
the meeting and to be related back to fellow workers. 
• Any  chemicals,  plant  and  equipment  that  are  to  be  used  on  site  the  contractor  must  supply 
Material  Safety  Data  Sheet  (  MSDS)    and  the  Manager  or  Principal  of  the  contractor  is  to 
ensure  his  men  who  are  using  the  chemical  have  been  trained  with  the  correct  handling 
procedure for the use of this chemical. 
• Maintain a full safety kit on site at all times. 
• The  Manager  or  Principal  of  the  contractor  is  to  provide  evidence  that  the  men  he  has 
employed  have  had  adequate  training  to  be  able  to  work  safely  with  the  duties  that  will  be 
performed on site. 
• Any  lost  time  injuries  the  contractor  is  to  notify  CB  Richard  Ellis  and  provide  all  necessary 
details. 
• Contractors to supply risk analysis sheets and safety plan for review before work commences 
on site for critical activities identified. 
• Contractor to inform CB Richard Ellis of any known hazards that may occur during their scope 
of works. 
 
 
 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 10 of 105 
 

5 COMMUNICATION 

Kick‐off Meeting: 

• The kick‐off meeting should be seen as a start meeting, preliminary to the general or project 
oriented activities. 
Prior  to  starting  of  project  activities  a  meeting  with  all  consultants,  contractors  will  be  organized  in 
order to make all concerned aware of the EHS rules & procedures to be adopted by team during the 
construction of project. 
The Project Manager who is In charge of the project will chair the meeting and the following take part 
in the meeting. 
1) Regional Manger‐EHS/Project EHS‐Coordinator 
2) Site In charges of all Contractors/Sub‐contractors  
3) Consultants   
4) EHS coordinators of Contractors/Sub‐contractors    
In  the  meeting  the  EHS  plan  meant  for  the  project  will  be  disclosed  and  discussed  for  effective 
implementation.  
The client’s representative may also present in the meeting wherever possible  
The points discussed will be recorded and minutes will be distributed to all concerned  
The  document  which  speaks  the  “Responsibility  and  Accountability  “of  Contractors/Sub‐  contractors 
would be issued and acceptance would be obtained by duly signed and acknowledged. (Annexure‐1) 
• In the kick‐off meeting beside technical relevant information  pay attention to the aspects of 
Health, Safety and Environment in general. 

Safety Meeting: 

Specific appointment e.g. Action points as result of consultation between safety technicalities related 
to the project is discussed. 
Weekly  meeting  shall  be  conducted  by  contractors  for  the  entire  work  force  with  specific  agenda 
under observation from the Project Managers safety team. 

Pre‐Job Meeting / PEP talks: 

The Pre‐Job Meeting is meant for consultation before activities start.  A part of the meeting is a review 
to  make  detail  appointment  for  specific  plan  on  location  directed  to  Health  and  Safety  matters  and 
actual deviation of the normal situation.  At this meeting the “pre‐job checklist” shall be handed over 
and worked out with all persons involved. 
• This  is  to  be  conducted  at  once  in  week  by  respective  EHS  coordinators  of  contractors/Sub‐
contractors. 
• These are meant for developing safety awareness and to remind the various safety measures 
and rules to be followed by the working group  
• During  the  talk  the  safety  precautions  for  various  activities  and  general  EHS  rules  would  be 
highlighted. 
• Ensure active participation, interaction of workmen and encourage them to share their similar 
experiences of other sites 
•  The records of Pep talks are to be maintained and a copy of the same is to be sent to Project –
EHS coordinator  

 
 
 
 
Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 11 of 105 
 

Tool Box Meeting:  

Toolbox meetings are CBRE’s internal matter. With this kind of consultation, executing employees will 
be informed about the actual work. This information can be appointments, instructions, which are the 
result of above‐mentioned meetings. A toolbox meeting is a medium to inform executing employees. 
• The  meetings  will  be  organized  by  Contractors/Sub‐contractors  at  their  respective  work 
locations daily . 
• The meeting would be held with the concerned staff /workmen involved in the specific job. In 
the meeting the safety measures and the procedures to be adopted would be conveyed to all 
concerned after discussing/assessing associated risks prevailed in the work activity. 
• The  meeting  would  be  held  on  need  basis  and  conducted  by  Site  Engineer/Foremen/EHS 
coordinator as and when changes of procedure/machinery and for new teams. 
• The records of Tool Boxes are to be maintained and a copy of the same is to be sent to Project 
–EHS coordinator  

Progress Meeting: 

• The progress meeting is meant for the daily / weekly consultation between the client and the 
main contractor  
• EHS part in this meeting, should be a fixed item on the agenda and following discussed. 
• Measures  as  a  result  of  finding  from  risk  analysis,  which  are  related  to  interaction  between 
different disciplines. 
• Findings as a result of inspection observation on incident. 
• Explanation on procedures, instruction and special measures. 

6 MONITORING 

Arrangement  shall  be  made  for  Safety  and  Health  monitoring  of  the  site  on  a  regular  basis.  For 
example  a  few  of  this  shall  include  ensuring  safety  of  scaffoldings,  excavations,  plant,  equipment 
matters such as hazardous dusts, fumes, noise etc. Project Manager shall ensure periodical inspection 
by visiting the site along with Safety Manager / Officer and Engineers. 

7 DOCUMENTATION 

CBRE shall ensure that all state notifications, examination and inspections are carried out. Except for 
plant  used  exclusively  by  individual  contractor,  all  record  shall  be  kept  and  updated  by  Project 
Manager. 

8 PROJECT SAFETY COMMITTEE 

As prescribed by the Building construction act, 1996 a site safety committee has to be constituted. The 
Committee shall comprise of client representatives, project management representatives and equally 
represented by contractors. The Project Manager shall totally be responsible for compliance with this 
EHS plan and code. CBRE shall appoint a EHS Manager/Officer and form a safety committee along with 
operatives from sub‐contractors.  Project Manager shall chair safety Committee and report once in a 
month to Project Controller. The Project Manager shall take suitable measures to ensure the effective 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 12 of 105 
 

co‐ordination of the works from all contractors at site.  He should ensure that he is kept informed on a 
day‐to‐day basis of progress and problems. Clear line of communication shall be set up between each 
contractor and Safety Manager / Officer of CBRE.  Operatives shall know to contact over safety, health 
matters  requiring  action  on  a  decision.  Safety  committee  reports  shall  be  submitted  to  Project 
Controller in every project meeting. 
• A Project EHS committee will be constituted for the project to discuss, review and resolve all 
EHS matters of the project  
• The  project  Manger/In  charge  would  be  the  Chairman  of  the  committee  and  Project  EHS 
coordinator would be Secretary of the committee.  
• The Site In charges of contractors/Sub‐contractors and their safety coordinators would be the 
members of committee  
• The meeting would be held once in week/fortnight. 
• In  the  meeting  all  EHS  issues  would  be  discussed  and  resolved  for  necessary  measures.  The 
performance and effectiveness of EH&S Plan would be reviewed for achieving desired level of 
performance. 
• The  minutes  of  meeting  would  be  circulated  to  all  concerned  and  to  Regional  EHS 
Manager/Coordinator. 

9 APPLICABLE STATUORY ACTS, RULES & IS CODES: 

CBRE and all contactors shall comply with client rules and procedures, National legislation codes etc. 

Statutory Provisions 
• The Factories Act 1948, Amendment Act 1947 
• The Environment Act 1986 
• Workmen’s Compensation Act, 1938   
• Building and Other Construction Workers  
• (Regulation of employment and condition of service) Act, 1996 
• Buildings and Other Construction Workers Welfare Act, 1996 
• Payment of wages Act, 1936 
• Equal remuneration Act, 
• Minimum wages Act.1948 
• Employers liability Act, 1938 
• Industrial dispute Act, 1947 
• Maternity benefit Act, 1961 
• Contractor labour Act, 1970 
• (Regulation and abolition) 
• Provident fund Act, 1952 
• Payment of gratuity Act, 1972   
• Indian Explosives Act and the explosives Rules. 
• The Gas Cylinder Rules, 1981 
• Static and Mobile Pressure Vessels (Unfired) Rules. 
• The Indian Electricity Act 1910 and Indian Electricity Rules 1956 
• The Atomic Energy Act, 
• The Radiation Protection Rules. 
• NFPA, 
• National Building Code etc. 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 13 of 105 
 

Indian Standard (IS) Codes related to E&HS 

                         The main contractor and all sub‐contractors are to comply with client specific riles 
and procedures, the National legislations and codes in particular the following: 

IS: 4081 ‐1986   Safety code for Blasting and Related Drilling operations                                                      

IS: 3764 ‐1992   Safety code for excavation work 

IS: 5121 ‐1969  Safety code for pilling and other deep foundations 

IS: 2750 ‐1964  Specification for steel scaffoldings 

IS: 3696            Safety code for scaffolds and Ladders: Part‐ I Scaffolds 
(Part‐I)‐1987 

IS: 3696             Safety code for scaffolds and Ladders: Part –II Ladders 
(Part‐II) ‐1991 

IS: 4082 ‐1977  Recommendations on stacking and storage of construction materials at site (First 
revision)           

IS: 4130‐1976  Safety code for demolition of building (First revision) 

IS: 4912‐1978  Safety requirements for floor and wall openings, railings and toe boards             
(First  revision)                     

IS: 5916‐ 1970  Safety code for constructions involving use of hot bituminous materials 

IS: 7205 ‐1974  Safety code for erection of structural steel work 

IS: 7969 ‐1975  Safety code for handling and storage of building materials 

IS: 8989 ‐1978  Safety code for erection of concrete framed structures 

IS: 7293 ‐1974  Safety code for working with construction machinery 

IS: 2212 ‐1991  Pipe lines –Identification –Colour code 

IS: 5216 ‐1982   Recommendations on safety procedures &practices in Electrical works               
(Part ‐I &II)                       

IS: 875 ‐1964  Code of practice for structural safety of buildings and loading standards 

IS: 10386 ‐1983  General aspects Part‐1 ‐1983, Part‐2 ‐1982, Part‐6 ‐1983, Part‐10 ‐1983‐ Amenities, 
Protective clothing and equipment, construction, storage, handling, detection  and 
Safety measures for gases, chemicals and flammable liquids 

IS: 10500‐1991  Drinking water (Specification) 

IS: 10291 ‐1982   Code of dress in civil engineering works 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 14 of 105 
 

IS: 2925‐1984  Safety helmets 

IS: 1179‐1967  Welding helmets 

IS: 7524 ‐1979  Safety goggles 
(Part‐I) 

IS: 9167 ‐1979  Ear muff /Ear plugs 

IS: 6994 ‐1973   Canvas hand gloves, Cotton hand gloves, Chrome leather gloves 
(Part‐I) 

IS: 4770 ‐1991   Rubber hand gloves tested for 15,000 volts 

IS: 3521 ‐1999  Full body safety harness 

IS: 11057 ‐1984  Specification for Industrial safety nets 

IS: 13415 ‐1992  Protective Barriers in & around buildings (Code of safety) 

IS: 13416 ‐1992  Preventive measures against Hazards at work places‐Recommendations part‐I 
Falling materials hazards Prevention part‐I 

IS: 13416 ‐1992  Preventive measures against Hazards at work places‐Recommendations part‐II Fall 
Prevention  

IS: 5914 ‐1970  Safety shoes 

IS: 12254 ‐1993   Poly vinyl chloride (PVC) industrial boots 

IS: 5557:2004  Industrial and Protective Rubber knee and Ankle boots  

IS: 2878 ‐2004   Co2 Type fire extinguisher 

IS: 2171 ‐1999   Dry chemical powder fire extinguisher 

IS: 13849 – 1993   Fire extinguisher for ABC fires 

IS: 10204‐2001  Mechanical Foam type extinguisher  (Foam used shall conform to IS: 4989 ‐1974 
and Co2 cartridge shall conform to IS: 4947 ‐1985) 

IS: 3786 ‐1983  Methods for computation of Frequency rate and Severity rates for Industrial 
injuries and classification of Industrial accidents (First revision)                                         

    

 
Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 15 of 105 
 

9.1     PROJECT STATUTORY COMPLIANCE CHECK‐LIST 

S. No  Description of Approval/Licence  YES/No           Remarks 


1  Labour licence / Registration(Form‐IV) by Client     
2  Form‐V issued to contractors     
3  Labour licence by Contractor     
4  Contract agreements(b/w Clients & Contractors)     
5  CAR Policy taken by Contractors     
6  Provident Fund Coverage     
7  ESI for all vendors(where ever is applicable)     
8  Notice board at  project site     
9  Documents to be maintained by all contractors     
 

DOCUMENTS TO BE MAINTAINED BY ALL CONTRACTORS 

 
1. Under the Contract Labour (Regulation & Abolition)Act,1948   
  
a) Obtain a Licence under the Act (Apply in Form ‐IV along with a certificate from in Form‐ V) + 
Requisite fee and security deposit. A licence to be obtained by the contractor for each and every 
establishment and also for each and every establishment and also for the branch offices of the 
same establishment, in case if the branch officers are in more than one address.                              
Applicable only if employed 20 or more (per branch of) the company.                   Yes/No 
b) Ensure that the licence is renewed at least 60 days before expiry of licence.         Yes/No 

The following Registers/Returns to be maintained and submitted for verification: 

1  Combined Registers in Form‐ T  Yes/No 
2  Wage slips in Form‐ XIX  Yes/No 
3  Issue of employment card in Form‐XIV  Yes/No 
4  Send a Notice of commencement /completion of contract work in Form‐VIA  Yes/No 
5  Whether the half‐yearly return in Form‐XXIV is being sent every half year?  Yes/No 
6  Whether the leave card (in Form‐H) has been issued to the employees  Yes/No 
deployed?  
 
7  Whether leave with wages register in Form‐F has been maintained for those  Yes/No 
deployed? 
 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 16 of 105 
 

2. Under Payment of Bonus Act‐Produce the following for verification 

1  Bonus has to be paid to all the employees whoever has completed at least  Yes/No 
30 days of service with the contractor during a financial year. 
2  Whether bonus is paid to all those deployed in the company in the presence  Yes/No 
of company’s representative 
3  Whether Bonus register in Form A&B is maintained?   Yes/No 
4  Whether C register under Bonus Act is maintained for the those deployed in  Yes/No 
the company? 
5  Annual return in Form –D has to be sent with in a month of paying Bonus to  Yes/No 
all 
6  Whether copies of C register & annual return Form –D has been submitted  Yes/No 
for verification?  
 
3. Under Employees State Insurance Act,1948  

1  Whether all the coverable employee deployed in the company are covered  Yes/No 
under ESI? 
2  Whether ESI card has been obtained for all the coverable employees?  Yes/No 
3  Whether ESI challans have realized before 21 st of every month?   Yes/No 
4  Whether Form‐6 –Half‐yearly return  has been submitted in time                   Yes/No 
(12 th May/ 11 th Nov) 
5  Whether ESI challan copies are given every month?  Yes/No 
6  Whether the total gross wages shown in the salary register is 60% of the  Yes/No 
total billing last month if the services are only labour oriented? 
7  Whether the total gross wages shown in the salary register is 25% of the  Yes/No 
total billing if the services are both labour &material? 
 
4. Under Employees Provident Fund Act 

A  Whether PF number has been allotted to all those deployed in the  Yes/No 
company? 
B  Whether PF challans have realized before 15 th of every month?  Yes/No 
C  Whether monthly returns in Form‐5,10 &12 A are filled before 25 th of  Yes/No 
every month? 
D  Whether PF annual returns were filed by on 30 th April of every year?  Yes/No 
E  Whether PF slips in Form ‐23 are issued to all the employees till the last  Yes/No 
year? 
 

 
Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 17 of 105 
 

5  Labour Welfare Fund has been paid to all those deployed in the company?  Yes/No 
6  Minimum wages to be paid to all the employees  Yes/No 
7  Leave with wages to be extended to all the employees  deployed ( AL‐15,CL‐ Yes/No 
12‐Total=27 
8  National &Festival holidays to be given to all those contract employees(Total  Yes/No 
10 days which includes 5 National holidays & 5 Festival holidays) 
9  In case if the employees are required to work during National/Festival   
holidays, they shall be paid in double for those days(or)shall be given 
Yes/No 
another compensatory holiday. 
10  Leave with wages /NFH/Overtime/Com.holiday etc to be mentioned in the  Yes/No 
Muster roll 
11  Over time register has to be duly filled up as and when a employee works  Yes/No 
more than 8 hours of work. They should be paid double the wages 
12  Over time has to be mentioned on the salary register and ESI must be paid   
on the same. This would enable the contractor employee to get ESI benefits 
 
such as ESI leave /Maternity leave and also pension benefits in case of fatal 
accidents  Yes/No 
13  The employees have to be issued Wage slips at least 24 hours before the  Yes/No 
disbursement of payment in respective companies 
14  The salaries/Bonus/Overtime to be paid in the presence of the employer  Yes/No 
representative and the same shall be certified by the representative. 
15  Whether employees are given weekly off on the 7 th day as per Law?  Yes/No 
16  Whether appointment orders are given to all employees (in form Q under  Yes/No 
S&E Act?)  
17   Whether the employees work more than 10.5 hrs including the break shift  Yes/No 
timing in any day? 
18   Please submit  the following along with  Xerox copy of the current month  Yes/No 
bills to the HR/Admin.department every month 
A  Attendance register Xerox copy of the current month it was billed  Yes/No 
B  Salary register (duly authorised by representative) copy of the previous  Yes/No 
month of billing 
C  ESI challan of the previous month  Yes/No 
D  EPF challan of the previous month  Yes/No 
E  Profession tax challan of the previous month, if any body paid more than           Yes/No 
Rs 3000/‐ per month 
F  Half‐yearly return under the ESI Act along with  the May & November   Yes/No 
month bills 
G  Half‐yearly return under the Contract Labor Act along with the Jan.& July  Yes/No 
month bill 
H  Annual return under the EPF Act along with the April month bill  Yes/No 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 18 of 105 
 

I  A copy of Bonus annual return in Form‐D submitted to the Labour   
department on or before November every year. A copy of the same to be 
Yes/No 
given to the company 
J  Proof of sending Labour  welfare fund return by the contractor‐ copy of   
 Form‐D  Yes/No 
 
• All the above mentioned documents must be self attested /certified by the authorised 
signatory. 

10 NON‐COMPLIANCE OF SAFETY AND HEALTH PROVISIONS: 

The compliance of the Safety and Health provisions are utmost important to CBRE.  The prospective 
contractors  shall  take  note  of  statutory  requirements.  CBRE  will  take  a  serious  view  of  any  non‐
compliance  report  of  Safety  committee  and  EHS  Manager/Officer.    Based  on  the  safety  committee 
report or EHS Manager/Officer, CBRE has the right to order stoppage of work till rectification is carried 
out to the satisfaction of the Safety committee and EHS Manager/Officer.  All stoppage on this account 
will be at the entire risk cost and consequence of the erring individuals/contractors. 
 

11 DISCIPLINARY ACTION: 

Non‐compliance of Safety and Health and Environmental provisions will result in disciplinarian action. 

  Violations: 

  First time  ‐  Oral warning 
  Second time  ‐  Written warning 
  Third time  ‐             Monetary fine 
  Fourth time  ‐             Removal from site 
 
• Immediate removal from site by all violations wherein the offender brings himself or others in 
direct life threatening situations are where he/she creates a large material loss. 
• The contractor who regularly, repetitively violates the provisions will be removed from the 
site. 
 
 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 19 of 105 
 

12. ENVIRONMENT 

12.1‐Noise 

NOISE: 

                        Noise is defined as any unwanted sound produced while working with machines, 
tools (air operated/fuel operated), vehicles etc. 

Noise is measured with ‘Sound Level Meter’ and the unit of noise measurement is ‘decibels’ (dB) 

                  Permissible Exposure Limit Value (PEL) for continuous Noise exposure:                                                           
(As per Building and other Construction workers Act, 1996 and Rules made there under Schedule VI) 

Average sound pressure level dB(A)  Maximum exposure 

90  8 hours 

92  6hours 

95  4 hours 

97  3 hours 

100  2 hours 

105  1 hour 

110  30 minutes 

115  15 minutes 

Recommended measures to control noise: 
a) Enclosure of machinery using plywood boarding or steel sheets 

b) By substitution of quieter machinery and equipment 

c)  Reducing noise at source e.g. Using bearings, Lubrication etc 

d) Staggering the work to lean parts of the day i.e. when workmen are minimum 

e) Regular and effective maintenance of plant and machinery. 

f) Ultimately, using ear muffs and ear plugs. 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 20 of 105 
 

12.2‐Material Safety Data Sheets (MSDS) 

CBRE shall inform risks and dangers in handling chemicals and hazardous substances brought on the 
site.  MSDS shall be made available by OEM/contractor to the EHS department. 

12.3‐Waste Disposal: 

Arrangements for proper collection and disposal of wastes such as food drop outs, combustible and 
other miscellaneous debris is to be made by respective company /contractors at their work area. 
Disposal of such wastes at periodical intervals are to be ensured.  

12.4‐ House‐Keeping: 

• General house‐keeping in working places. 
• Regular collection and disposal of waste/trash. 
• Pathways/Walkways shall be clear as far as possible. 
• Adequate illumination provided. 
• All sanitary facilities shall be maintained and cleaned. 
• Water leakages and over flows shall be contained. 
• The contractor shall at all time keep his work site, site office and surroundings clean and tidy 
from rubbish, scrap, surplus materials and unwanted tools and equipment. 
• Welding and other electrical cables shall be so routed as to allow safe traffic by all concerned. 
• No materials on any of the sites of work shall be so stacked or placed as to cause danger or 
inconvenience to any person or the public. 
• At the completion of the work, the contractor shall ensure removal from the work premises all 
scaffoldings, surplus materials, rubbish and all huts and sanitary arrangements used/installed 
for workmen on the site. 
• The contractor shall at all time keep his work site, site office and surroundings clean and tidy 
from rubbish, scrap, surplus materials and unwanted tools and equipment. 
• Welding and other electrical cables shall be so routed as to allow safe traffic by all concerned. 
 
 

12.5‐Public Protection 

The contractor shall make all necessary provisions to protect the public.  He shall be held responsible 
for defense of every action of other proceedings at law that may be brought by any person for injury 
sustained owing to neglect of any precaution required to be taken to protect the public.  
 
13. HEALTH 

13.1 First‐Aid 

Trained First‐Aid person 

Main contractor shall provide appropriate number of suitable trained persons in the circumstances for 
rendering First‐aid to their people if they are injured or become ill at work.  Provisions for medical care 
Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 21 of 105 
 

are made available for every employee covered by the regulation. Near by dispensary, clinic/hospital 
in the proximity to the work site is provident. 
Emergency Vehicle for transportation of injured persons to a physician or Hospital shall be provided. 
 
In order to ensure  first  aid  to the personnel  in case of  injury  or suffering the first Aid kits are made 
available at designated locations 
 
It should be ensured by the all concerned In charges that the trained First Aider is always available at 
their respective work area to care of first aid in case of any injury to the employees 
 
o Electrocution – Switch off the mains/detach using non conductive material like wooden stick/ 
rubber material if the victim is still struck to the electrical source. 
o Fire – Extinguish the fire with the help fire extinguisher available nearby. 
o Fall ‐ Make the victim comfortable; raise his legs to keep the blood circulation to head. 
o Chemical Injury – Use lots of water to wash off. 
o Take the help of first Aiders available at site          
o  Maintain silence and arrange to send the victim to the hospital for further treatment. 
First‐Aid Kit 

Regardless  of  the  number  of  people,  first‐aid  center  shall  be  provided  on  site  by  main  contractor.  
Every trained first‐aider has easy access to first‐aid equipment and provision made for every person to 
have  reasonably  rapid  access  to  first‐aid.    First‐aid  kit  is  checked  regularly  and  contains  sufficient 
quantity of suitable first‐aid materials. 

First‐aid Centre 

Suitably staffed and equipped first‐aid center shall be organized near the area of work.  The first‐aid 
centre shall be under the charge of an occupationally trained first‐aider. 
 
Readily available trained first‐aider shall render first‐aid.  First aid center shall be suitably illuminated, 
ventilated and cleaned regularly. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 22 of 105 
 

13.2­Contents of a First­aid box                                                                                                                                               

                                        (As per The Building & Contractors, Act‐1996)  
1) A sufficient number of eye‐wash bottles filled with distilled water or suitable liquid clearly 
indicated by a distinctive sign which shall be visible at all times. 
2) 4% xylocaine eye drops, and boric acid eye drops and soda bicarbonate eye drops. 
3) 24 – Small sterilized dressings. 
4) 12 – Medium size sterilized dressings. 
5) 12 – Large size sterilized dressings. 
6) 12 – Large size sterilized burn dressings. 
7) 12 – (Fifteen cms) packets of sterilized cotton wool. 
8) (200 ml) bottle of centrimide solution (1%) or suitable antiseptic solution. 
9) One (200 ml) bottle of Mercurochrome solution (2%) solution in water. 
10) One (120 ml) bottle of salvolatile having the doses and mode of administration indicated on 
the label. 
11) One pair of Scissors. 
12) One roll of adhesive plaster (6 cm x 1metre). 
13) Two rolls of adhesive plaster (2 cm x1 metre). 
14) 12 pieces of sterilized eye pads in separate sealed packets. 
15) A bottle containing 100 tablets (each of 325 mg) of aspirin or any other analgesic. 
16) 12 – roller bandages 10 cms wide. 
17) 12 – Roller bandages of 5 cms wide. 
18) One tourniquet. 
19) A supply of suitable splints. 
20) 3 packets of safety pins. 
21) Kidney tray. 
22) A snake bite lancet. 
23) One (30 ml) bottle containing potassium permanganate crystals. 
24) Copy of First‐aid leaflet issued by Director General. 
25) 6 – Triangular bandages. 
26) 2 pairs of suitable, sterilized, latex hand gloves. 
 

 
 
 
 
 
 
 
 
 
 
 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 23 of 105 
 

13.3‐Drinking Water 

In every work place, sufficient amount of potable drinking water shall be provided. 
 
No  drinking  water  supply  points  shall  be  situated  within  6  meters  of  any  washing  place,  urinal  or 
latrine. 

13.4 Latrines and Urinals 

Latrines and Urinals shall be provided at the work places.  Shall be under a cover and portioned off as 
to secure privacy and shall have proper doors and fastenings. 
 
Clear notices in regional languages / English shall be displayed to understand “For Men only” and “For 
Women only” as the case may be. 
 
These  latrines  and  urinals  shall  be  adequately  illuminated  and  shall  be  maintained  in  a  clean  and 
sanitary condition. 

13.5‐Anti‐Malarial Precaution 

CBRE  shall  conform  to  all  anti‐malarial  instructions  given  to  by  client  including  the  filling  up  of  any 
narrow pits which might have been dug by Safety. 

14. Safety 

14.1‐Excavation 

Excavation is the essential element of the construction process for making foundations, drainage work 
and site re‐grading of all kinds. 

In carrying out excavations the soil condition can vary widely, often in short distances. No soil 
whatever its nature can be relied upon to support its own weight for any length of time. Even a small 
fall of earth is capable of inflicting serious injury even if it does not kill. Unless and until the excavation 
is battered, the sides need supporting to prevent the possibility of collapse. 

The following safety measures are to be ensured before and during excavation. 
• Check for underground utilities like electrical / telephone cables, sewage, water lines and 
proper care has to be exercised to protect and prevent damage to it  
• Proper and adequate slope is maintained while excavating  
• Adequate shoring or sheeting is done wherever require to prevent soil sliding  
• Safe access through ladder or steps for exit & entry to excavation 
• No material /excavated soil is  kept within one meter from the edge  
• Safe way is planned and provided for movement of HEM /transport equipment near 
excavation  
• Safety helmet and shoes/gum boots are provided and worn by the workmen at excavation 
works   
• Barricading is provided at excavated pits 
• Danger signs /Caution  boards are displayed at work spot   
• Dewatering arrangement is made where water seepage is prevailed. 
• Stop blocks are provided to avoid vehicles reversing into the excavated trenches 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 24 of 105 
 

14.2‐Piling 

It is the first and foremost activity of construction where load bearing capacity of soil is inadequate for 
foundation. The working condition of piling rig and  other associated tackles is a significant 
contributing factor for prevention of equipment failure during operation. 

 Ensure the following precautionary measures before starting piling works 
• Inspection of piling equipment by responsible person for its condition before initiating piling 
operation. 
• Testing and its certification wire ropes, slings, D‐shackles , chain pulley blocks using in the 
process of piling work by competent person   
• Adequate support and secured foundation of the piling equipment to avoid toppling  
• Hoses should be lashed and adequately secured  
• Proper work platform is to be provided on piling frame  
• Safe work procedures and close supervision to prevent unsafe acts of operators/any unsafe 
conditions that may arise  
• Only experienced and trained operators are engaged for the piling operation  
• Provision of Personal Protective Equipment (PPE) like safety shoes/gumshoes/safety 
helmet/safety belt etc and its use by their workmen. 
• Special care and precautions If  work is near electrical live cables/ electrical equipments  
• Cordoning of work area to prevent un authorized entry  
• Guarding of revolving parts 
• Specific measures to prevent over turning of pile driver/missing of hammer/ hammer 
movement out of range  

14.3‐Mobile Plant 

Mobile plant including tractors, trailers, dumpers, excavators, bulldozers, road rollers etc. for 
earthmoving purpose, concrete mixers, concrete transit mixtures, concrete pumps etc for concreting 
purpose are extensively used in construction Industry. Due to the very nature of their function and 
movement in difficult terrains, congested areas, working in tandem with manual work and other 
operations the danger is inherent. 

Many potentially hazardous situations and accidents could be avoided by the application of known 
safety principles and procedures  

Safety measures: 
1. Where movement around site is involved , routes should be planned, obstruction free and well 
maintained  
2. Observe specified speed limits 
3. Operating personnel should be aware of associated risks and its preventive measures  
4. Only  experienced,  trained  and  authorized  persons  with  valid  license  (wherever  applicable  ) 
should operate the mobile equipments/vehicles 
5. Provide and use Warning lights and reverse horn for cautioning the people around  
6. Operation should be on level and stable ground with adequate working clearance. 
7. Loading of out riggers/stabilizers should be well within safe ground bearing capacity  
8. No person should be on equipment or vehicle during loading and unloading of material  
9. Operators  should  be  protected  by  warning  barriers  or  switching  off  power  when  working  in 
close proximity of over head power lines  

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 25 of 105 
 

10. The equipment /vehicles should be well maintained and provided with effective brake system 
and other safety devices (wherever require) 
11. Rotating parts of equipment should be adequately guarded  
12. Provide  necessary  personal  protective  appliances  and  ensure  its  use  by  the  operating 
personnel  Ensure  effective  measures  at  source  to  control  harmful  emissions,  dust,  fumes 
contaminating  atmosphere  and  cause  health  hazards  to  the  operators  and  people  in  the 
vicinity.  
13. No overloading/over stressing of vehicles/plant is allowed 
14. Hoses,  pipes,  and  receivers  gauges  and  valves  involved  in  carrying  out  hydraulic  fluid/ 
compressed air should be checked for leaks and tested prior to operation. 
15. Adequate safe clearance for swing and movement is to be judged during operation   
16. Concrete mixture :   
17. Setting  of  machine  on  firm  and  level  ground  with  wheel  locked  to  prevent  movement  of 
machine  
18. Proper  instructions  and  Special  precautions  are  to  be  ensured  to  prevent  entry  in  to  the 
danger zone of projectile of bucket while dropping bucket  
19. Operator  leaving  work  spot  should  ensure  that  the  equipment/vehicle  is  kept  in  neutral 
position and place on firm and level ground. 
20. The hand brake should be kept in position and block road wheels as additional safety measure 
21. Blades/buckets should be kept low while moving  
22. The dozer blades should not be used as brakes except in emergency 
23. The  ground  should  be  examined  for  its  bearing  capacity  and  general  safety  especially  when 
operating road roller at the edges of slopes, embankments. 
24. The roller should not be moved down hill with the engine out of gear  
25. If operating near excavations the following precautionary measures are to be ensured 
26. Barricading, edge protection to prevent fall of persons/vehicles over running while reversing 
etc. 
27. Suitable support system and adequate allowance to avoid the danger of side collapsing  
28. Experienced  signaler  /attendant  should  be  always  accompanied  with  operator/driver    for 
proper  direction  /signal and  also  to  caution others in  the working Zone  during   operation  of 
mobile plant 

14.4‐Concrete Vibrators 
 
• Revolving parts/belt drives should be adequately guarded and Vibrating unit shall be completely    
enclosed  
• Electrically operated compact Vibrators is of completely enclosed type having suitable overload 
relays and effectively  earthed  
• Ensure sufficient length of cable to the Vibrator. 
• Ensure electric starters and other accessories are firmly fixed adequately supported  
• Ensure locking of needle load while inserting needle in to the vibrator,  
• Ensure periodical lubrication and maintenance 

14.5‐Concrete mixture  
• Setting of machine on firm and level ground with wheel locked to prevent movement of 
machine  
• Proper  instructions  and  Special  precautions  are  to  be  ensured  to  prevent  entry  in  to  the 
danger zone of projectile of bucket while dropping bucket 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 26 of 105 
 

Safety during material TRANSPORTATION  
 
• Consider  weight,  dimension,  capacity  of  the  carrier,  center  of  gravity  of  load,  clearance  required  etc 
while loading material for transporting  
• Load is adequately packed and lashed before transportation. 
• The vehicle /trailers are in good working condition especially the brakes/lights, Horns and other warning 
signals  
• No overloading /projecting of material above the height of side panel or beyond the side panels.  (May 
be allowed maximum projection of 1 to 1.5 mts at the back of deck. Display of red caution flag or red 
lamp in the nights on the projected end. 
• Observe prescribed speed limits and road safety rules for railway level crossing/turnings, overtaking etc.. 
• No get in and down from a moving vehicle. 
• No person should sit near or over the load and on side panels/top of driver’s cabin. 
• Ensure survey of route, If materials are transported in wagons/trailers, preventing possible fouling 
with any fixed structure/object/Overhead electrical Cable /another wagon etc. 
• In  case  of  transporting  hazardous  nature  of  materials  like  petroleum  products/chemicals  and 
compressed gas cylinders the prescribed safety measures are taken as per the relevant Acts. 
• Vehicle should be operated by only authorized driver having valid driving license and the vehicle 
should be provided with RC and other relevant prescribed certificates and insurance coverage 

14.6‐Hoist, Cranes 

• Manufacturer’s recommendations on operating conditions shall be followed. 
• Rated load capacities, operating speeds shall be followed 
• Lifting studies shall be made in concurrence with client if the load is more than 10 tones. 
• Standard hand signals shall be followed. 
• Accessible areas within the swing of rotating superstructure of crane shall be cordoned off. 
• For  tower  crane,  adequate  clearance  shall  be  maintained  between  the  moving  and  rotating 
structures, fixed objects. 
• Employees require to perform duties on horizontal booms of tower crane shall be protected 
against falling by guard rails or fall protection. 
• Safe Working Load (SWL) for tower crane shall be conspicuously displayed on each side. 
• Only trained and authorized operator shall operate the tower crane. 

14.7‐Motor Vehicles 

• Control of all traffic on the site and movement of materials, parking shall be planned and 
executed according to space availability. 
• Motor equipment left unattended at night near areas where work is in progress shall have 
appropriate light, reflectors or barricades to identify the equipment. 
• JCB’s scrapper blades or similar equipment shall be either fully lowered or blocked while being 
repaired or when it is not in use. 
• All controls shall be in neutral position and motor stopped and brake set. 
• Other standard accessories of vehicles, equipments such as seat belts, rear view mirrors and 
safety latches and operating levers shall be in accordance with standard vehicle codes and 
state‐inspected where appropriate. 
 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 27 of 105 
 

14.8‐Trucks 

Trucks used on site, traffic procedures shall be taken care of.  A reasonably smooth traffic surface shall 
be provided.  If practicable a loop road shall be provided to permit continuous operation of vehicles to 
eliminate their backing.  Backing operation shall be controlled by a banks man positioned so as to have 
a clear view of the area behind the truck.  Movement of workmen and plant shall be routed to avoid 
crossings as much as possible.   

14.9‐Traffic 

The contractor shall organize operations by taking approval to use the existing roads, if any, from 
Client. 
 
The contractor shall exercise full care to ensure that no damage is caused by him or workmen, during 
the operation, to the existing water supply, sewerage, power or telecommunication lines or any other 
services or works.  The contractor shall provide and erect before construction, substantial barricades, 
guardrails, and warning signs.  He shall furnish, place and maintain adequate warning lights, signage’s, 
etc., as required by Project Managers. 

14.10‐Fire Prevention 

• Electrical wiring equipment for heating, height on power shall be installed in compliance 
with statutory requirements.   
• Internal combustion engine powered equipment shall be located with exhaust well away 
from combustible materials. 
• Smoking is prohibited on the site. 
• No smoking signboards shall be posted consciously at appropriate locations 
• Storage areas shall be free from accumulation of unnecessary combustible materials. 
• Sufficient number of fire extinguishers shall be installed at all temporary buildings and 
storages. 
• All flammable liquids, gas cylinders and other inflammable materials stored properly and 
separately. 
• Flame cutting and welding take hot work permit. 

Preventing the spread of fire: 

• Waste accumulation in hoist shafts etc will be regularly removed. 
• Separate  metal  containers  for  oil  rags,  paint  rags,  paint  scrapings,  waste  flammable  liquids, 
wood warnings and off‐cuts provided. 
• All wastes will be regularly cleaned /cleared. 

Means of Escape: 

• All gangways, stairs, platforms shall be free from obstructions. 
• Everyone  on  the  site  shall  be  trained  and  shown  the  way  how  to  escape  safely  in  an 
emergency (Emergency drills/Exercise shall be conducted periodically). 

Fire Fighting: 

• All fire extinguishers are checked regularly and recharged. 
• Fire extinguishers shall be provided at vintage points for easy accessibility. 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 28 of 105 
 

• Fire fighting training shall be imparted to staff and literate contractors. 
 
Class of Fire  Suitable Type of Appliances 

Chemical extinguishers of Soda – acid Gas / 
A ‐ Fires in ordinary combustible (wood, vegetable 
expelled water and anti – freeze types, and 
fibers, paper and the like)  
water buckets. 

Chemical extinguishers of foam, carbon dioxide 
B – Fires in flammable liquids, paints, grease,  and dry powder  
solvents and the like. 
 Types, and water buckets. 

Chemical extinguishers of Dry powder & 
C‐ Fires in gaseous substances under pressure 
Carbon‐dioxide types  

Special type of dry powder extinguishers and 
D‐ Fires in reactive chemicals, Active metals etc. 
sand buckets 

Chemical Extinguishers of Carbon Dioxide & Dry 
E‐ Fires in Electrical Equipments 
Chemical Powder Sand buckets 

14.11‐Ladders 

Work activities situated above 2.5 meters from ground floor: 

Precaution shall be taken to avoid from falling down.  For work above 2.5 meters from ground floor 
level proper scaffolding/staging shall be erected. 

Use of Ladders: 

• Ladder shall be fixed near the top if practicable or near the bottom and secured. 
• Ladder shall be placed on a firm level base. 
• Ladder shall be intermediately secured to prevent swaying and sagging. 
• While working on ladder above 2.5 meters, fall protection shall be used. 
• Ladders  shall  extend  at  least  1.05  meters,  above  any  landing  place  beyond  the  highest  rung 
from which a person shall work or have a nearby hand hold of equivalent height. 
• Ladders shall be placed so that there is space behind each rung for proper foot hold    (No rung 
shall coincide with scaffold/staging tubes). 

14.12‐Scaffolding / Staging 

Work activities above 2.5 Meters from ground floor level: 

• Proper scaffolding/staging shall be erected for works above 2.5 mts .high above the floor level. 
• Ladder properly secured shall be used. 

 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 29 of 105 
 

Supervision of work and inspection of material: 

• Scaffolding/Staging shall be erected, altered or dismantled only under a competent supervisor 
as far as possible. 
• All scaffolding/staging materials shall be inspected before use. 
• All inspected scaffolding/staging shall bear a sign “Ready for Use”. 

Material and construction: 

• Sufficient sound material shall be provided for a scaffold/staging strong enough for the job. 
• Scaffolding/staging tubes and fittings shall not be bent, distorted and unduly rusted. 

Defective Material: 

• Scaffolding/Staging  tubes,  couplers,  fittings  bent  or  unduly  rusted  or  distorted  shall  be 
rejected. 
• All  scaffolding/staging  components  shall  be  properly  stored  when  not  in  use  and  kept 
separately from other building materials. 

Maintenance of Scaffolding/Staging: 

• Scaffolding/Staging  shall  be  kept  in  good  condition  and  every  effort  made  to  prevent  the 
accidental displacement of any parts. 

Partly erected or dismantled scaffolding/Staging: 

• If  any  scaffolding/staging  is  partly  erected  or  partly  dismantled  and  is  still  capable  of  being 
used  to  some  extent,  shall  have  a  warning  notice  fixed  and  all  access  blocked/barred  at  the 
point beyond which it cannot be safely used. 

Mobile Scaffolding/Staging: 

• Shall be stable, weighted at the base. 
• Used only on flat and leveled surface. 
• Have the wheels locked to prevent movement while in use. 
• Pushed/Pulled only at the base when moved. 

14.13‐Form Work 

• Formwork shall be designed taking into considering spans, settling temperatures of concrete, 
dead load and working load supported by safety factor for the material used. 
• All  timber  formwork  shall  be  carefully  inspected  before  use  and  member  having  cracks, 
excessive knots shall be discarded. 
• Vertical supports shall be adequately braced or secured not to allow falling. 
• All centering works shall be finally inspected for its soundness. 

14.14‐Concrete Construction 

 Handling of Plant: 

• All gears, chains and roller of mixer shall be properly guarded. 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 30 of 105 
 

• Railings shall be provided on the ground to prevent any one walking under the skip while it is 
being lowered. 
• All cables, clamps, hooks, wire ropes, gears, clutches etc. of mixer, shall be checked, cleaned, 
oiled, greased and services once in a week. 
• While cleaning the inside of drums and operating power shall be de‐energized, locked off and 
fuses removed.  A suitable notice shall be hung at the place. 

14.15‐Barricades 

• Barricades  shall  be  erected,  maintained  required  in  connection  with  concerned  Engineers  in 
order to protect people at hoisting areas. 
• Contractors  Supervisors  shall  become  acquainted  with  Project  Manager  and  EHS 
Manager/Officer and barricading practices and shall respect the provisions there of. 

Guarding of Floor Openings: 

• Floor  openings  shall  have  railings  or  constantly  attended  by  supervisors,  appointed  by 
contractor/concerned site Engineer. 
• Floor opening covers of adequate strength shall be in place.  When the cover is not in place, 
the  floor  opening  shall  be  constantly  attended  by  someone  or  shall  be  protected  by  a 
reasonable railing. 
• A railing shall guard every floor hole into which a person can accidentally fall. 
• Every ladder way, floor opening or platform shall be guarded by guard railing on all exposed 
sides. 
• Every  open  sided  floor  or  platform  level  shall  be  guarded  by120  Cms  high  railings.  All  open 
sides where there is entrance to ramp, stairway shall be provided with fixed ladder. The railing 
shall be provided beneath the open sides wherever. 

14.16‐Demolition 

Before any demolition work is commenced and also during the progress of the work: 
• All roads and open area adjacent to the work site shall either be closed or suitably protected. 
Appropriate warning signs shall be displayed for cautioning approaching persons. 
• Before demolition operations begin, the contractor shall ensure that the power on all electric 
service lines is shut off and the lines cut or disconnected at or outside the demolition site.  If it 
is necessary to maintain electric power during demolition operation, the required service lines 
shall be adequately protected against damage.  Persons handling heavy materials/equipment 
shall wear safety shoes. 
• No floor, roof or other part of the building shall be overloaded with debris or materials as to 
render it unsafe. 
• Entries to the demolition area shall be restricted to authorized persons only. 

14.17‐Painting 

The Contractor shall not employ women on the work of painting with products containing lead in any 
form.    Only  men  above  the  age  of  18  years  shall  be  employed  on  the  work  with  lead  paint.    The 
following precautions shall be taken during the work: 
• Supply air respirators for use by the workers when paint is applied in the form of spray, or a 
surface having lead paint is scraped. 
• The workmen shall use overalls and adequate facilities shall be provided to enable the painters 
to wash at the cessation of work. 
Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 31 of 105 
 

• All painting jobs, especially those in which lead paints are used shall be kept under industrial 
hygiene surveillance. 
Smoking,  open  flames  or  sources  of  ignition  shall  not  be  allowed  in  places  where  paints  and  other 
flammable  substances  are  stored,  mixed  or  used.    A  caution  board,  with  the  instructions  written  in 
national/regional language, “SMOKING‐STRICTLY PROHIBITED” shall be displayed in the vicinity where 
painting is in progress or where paints are stored.  Symbols shall also be used for caution boards. 
Suitable fire extinguishers/sand buckets shall be kept available at places where flammable paints are 
stored, handled or used. 
When  painting  work  is  done  in  a  closed  room  or  in  a  confined  space,  adequate  ventilation  shall  be 
provided.  If adequate ventilation cannot be provided, workers shall wear suitable respirators. 
Epoxy resins and their formulations used for painting shall not be allowed to come in contact with the 
skin.  The workers shall use plastic gloves or suitable barrier creams. 
Adequate ventilation shall be provided especially when working with hot resin mixes. 
Increased  personal  hygiene  shall  be  practiced  to  control  inadvertent  contact  with  the  resin  and 
eliminate its effects. 
Workers  shall  thoroughly  wash  hands  and  feet  before  leaving  the  work.    Work  clothes  shall  be 
changed and laundered frequently. 

14.18‐Welding And Gas Cutting 

• Welding and gas cutting operations shall be done by qualified and authorized persons and as 
per IS specifications and code of practice. 
• Welding  and  gas  cutting  shall  not  be  carried  out  in  places  where  flammable  or  combustible 
materials  are  kept  and  where  there  is  danger  of  explosion  due  to  presence  of  gaseous 
mixtures. 
• Welding  and  gas  cutting  equipment  including  hoses  and  cables  shall  be  maintained  in  good 
condition. 
• Barriers  shall  be  erected  to  protect  other  persons  from  harmful  rays  from  the  work.    When 
welding  or  gas  cutting  is  done  in  elevated  positions,  precautions  shall  be  taken  to  prevent 
sparks or hot metal falling on persons or flammable materials. 
• Suitable type of protective clothing consisting of fire resistant gauntlet gloves, leggings, boots 
and  aprons  shall  be  provided  to  workers  as  protection  from  heat  and  hot  metal  splashes.  
Welding shields with filter glasses of appropriate shade shall be worn as face protection. 
• Adequate  ventilation  shall  be  provided  while  welding  in  confined  space  or  while  brazing, 
cutting or welding zinc, brass, bronze, galvanized or lead coated materials. 
• Welding and gas cutting shall not be done on drums, barrels, tanks or other containers unless 
they  have  been  emptied,  cleaned  thoroughly  and  it  is  made  certain  that  no  flammable 
material is present. 
• Fire extinguisher shall be available near the location of welding operations.  Fire safety permit 
shall  be  obtained  for  working  at  vulnerable  areas  and  operating  areas  before  flame 
cutting/welding is taken up. 
• For electric (Arc) welding the following additional safety precautions shall be taken: 
1. When  electrical  welding  is  undertaken  near  pipelines  carrying  flammables,  such 
pipelines shall not be used as part of earth conductor, but a separate earth conductor 
shall be connected to the machine directly from the job. 
2. Personnel contact with the electrode or other live parts of electric welding equipment 
shall be avoided. 
3. Extreme  caution  shall  be  exercised  to  prevent  accidental  contact  of  electrodes  with 
ground. 
4. The welding cable shall not be allowed to get entangled with power cables.  It shall be 
ensured that movement of materials does not damage the cables. 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 32 of 105 
 

14.19‐Grinding 

• All portable grinders shall be used only with their wheel guards in position to reduce the 
danger from flying fragments should the wheel break during the use. 
• Grinding wheels of specified diameter only shall be used on a grinder ‐portable or pedestal  
in order not to exceed the prescribed peripheral speed. 
• Goggles shall be used during grinding operation. 

14.20‐Work In Radiation Area 

The  contractor  shall  follow  the  stipulated  procedure  regarding  work  in  the  radiation  are  and  other 
works related with radiography. 

14.21‐Work In and Around Water Bodies 

When  the  work  is  done  near  any  places  where  there  is  risk  of  drowning,  all  necessary  rescue 
equipment such a life buoys and life jackets shall be provided and kept ready for use and all necessary 
steps  taken  for  prompt  rescue  of  any  person  in  danger  and  adequate  provision  shall  be  made  for 
prompt first‐aid treatment of all injuries likely to be sustained during the course of the work.  Persons 
who do not know swimming shall not be engaged alone for any work where risk of drowning exists.  
Sufficient number of life buoys or life jackets shall be provided. 

14.22‐Guidelines and General Procedures for Use of Electricity At Site 

 GENERAL 

Following safety requirements shall be complied with before the contractor uses the power supply. 
• The contractor shall submit a list of licensed electrical staff to be posted at Site. 
• It shall be the responsibility of the contractor to provide and maintain complete installation on 
the load side of the supply point with regard to the safety requirements at Site.  All cabling and 
installation shall comply  with the appropriate latest statutory requirements given below and 
shall be subject to approval of the Engineer‐in‐Charge: 
o Indian Electricity Act. 
o Electricity (Supply) Act. 
o Indian Electricity Rules. 
o National Electricity Code. 
o Other relevant rules of Local Bodies and Electricity Boards. 
The power supply shall be regulated as per the terms and conditions of the supply of the respective 
electricity boards. 
• Where  distribution  boards  are  located  at  different  places  the  contractor  shall  submit 
schematic  drawing  indicating  all  details  like  size  of  wires,  Over  head  and  Cable  feeders, 
earthing etc.  The position and location of all equipment and switches shall be given. 
• The contractor shall make his own arrangement for main earth electrode and tapings thereof.  
The  existing  earth  points  available  at  site  can  be  used  at  the  discretion  of  Client  with  prior 
permission.    Method  of  earthing,  installation  and  earth  testing  results  shall  conform  to 
relevant I.S. Specifications (IS‐3043). 
• All  three  phases’  equipment  shall  be  provided  with  double  earthing.    All  light  fixtures  and 
portable equipment shall be effectively earthed to main earthing. 
• All  earth  terminals  shall  be  visible.    No  gas  pipes  and  water  pipes  shall  be  used  for  earth 
connection.  Neutral conductor shall not be treated as earth wire. 
• The contractor shall not connect any additional load without prior permission of Client. 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 33 of 105 
 

• Joints  in  earthing  conductors  shall  be  avoided.    Loop  earthing  of  equipment  shall  not  be 
allowed.  However, tapings from an earth bus may be done. 
• The  entire  installation  shall  be  subjected  to  the  following  tests  before  energisation  of 
installation including portable equipment: ‐ 
o Insulation resistance test. 
o Polarity test of switches. 
o Earth continuity test. 
o Earth electrode resistance. 
The test procedures and their results shall conform to relevant standards. 
Electrical Shock:  

Flow  of  electric  current  through  human  body  is  the  cause  of  electrical  shock.  On  receiving  electrical 
shock a person may be bodily injured being thrown away on the same level or  due to fall from height 
as he lose his balance when working at height.  If electrical path is through heart, the accident can be 
fatal  

Burns:  
• Burns  are  caused  by  electrical  flashes  if  a  body  part  comes  with  in  flashing  distance  of  high 
voltage current. 
• Burns may be caused due to short circuit also. 
• Short circuit may lead to electrical flashes causing burns  
It is therefore important to adhere to all safety measures for prevention of Electrical hazards.  
• Only authorized and qualified persons should undertake electrical repairs and other electrical 
works. 
• Treat all circuits are live unless ensured after testing to be DEAD 
• Use Standard switches sockets and other fittings of adequate rating required for the operation  
• Use double insulated 3 core cables and ensures cables are free from insulation failure 
• All electrical supply is controlled through circuit breakers and the same is periodically checked 
by competent person for its effective operation. 
• Ensure all electrical appliances and Electrical portable tools are effectively earthed. 
• Do not allow unsafe temporary connections, naked joints/wiring  
• Don’t work on electrical equipments in wet environment /on wet floors 
• Don’t over load electrical point/equipment  
• Don’t crowd things near electrical mains /switches and keep access free from obstructions. 
• Don’t make trail & errors and short cuts. Follow safe procedures 

14.23‐Installation 

Following guidelines are provided for general observations: ‐ 
• Only  persons  having  valid  wireman’s  license/competency  certificate  shall  be  employed  for 
carrying out electrical work and repair of electrical equipment, installation and maintenance at 
site.  A qualified licensed Supervisor shall supervise the job. 
• Electrical equipment and installations shall be installed and maintained as to prevent danger 
from  contact  with  live conductors and  to  prevent  fires originating from  electrical  causes  like 
short circuits, overheating etc.  Installation shall not cause any hindrance to movement of men 
and materials. 
• Materials  for  all  electrical  equipment  shall  be  selected  with  regard  to  working  voltage,  load 
and working environment.  Such equipment shall conform to the relevant standards. 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 34 of 105 
 

• The minimum clearance to be maintained for all overhead lines along roads and across roads 
shall be as per the statutory requirements. 
• Grounding conductor of wiring system shall be of copper or other corrosion‐resistant material.  
An  extra  grounding  connection  shall  be  made  in  appliances/equipment  where  chances  of 
electric shock are high. 
• Electric fuses and/or circuit breakers installed in equipment circuits for short circuit protection 
shall be of proper rating.  It is also recommended that high rupturing capacity (HRC) fuses are 
used in all circuits.  For load of 5 kW or more earth leakage circuit breaker shall be provided in 
the circuits. 
• Wherever cables or wires are laid on poles, a guard wire of adequate size shall be run along 
the cables/wires and earthen effectively.  Metallic poles as a general rule, shall be avoided and 
if used shall be earthen individually.  Anti climbing guards and danger notices shall be provided 
on poles.  Each equipment shall be an individual isolating switch. 
• Wires  and  cables  shall  be  properly  supported  and  an  approved  method  of  fixing  shall  be 
adopted.  Loose hanging of wires and cables shall be avoided.  Lighting and power circuits shall 
be kept distinct and separate. 
• Reinforcement rods or any metallic part of structure shall not be used for supporting wires and 
cables, fixtures, equipment, earthing etc. 
• All cables and wires shall be adequately protected mechanically against damages.  In case the 
cable  is  required  to  be  laid  under  ground,  it  shall  be  adequately  protected  by  covering  the 
same with bricks, Plain Cement Concrete (PCC) tile or any other approved means. 
• Using  suitable  cable  glands  shall  properly  terminate  all  armored  cables.    Using  cable 
lugs/sockets  shall  connect  multi‐stranded  conductor  cables.    Cable  lugs  shall  preferably  be 
crimped.  They shall be of proper size and shall correspond to the current rating and size of the 
cable.  Twisted connections will not be allowed. 
• All  cable  glands,  armoring  and  sheathing  of  electric  cable,  metal  circuits  and  their  fittings, 
metallic  fittings  and  other  non‐current  carrying  parts  of  electrical  equipment  and  apparatus 
shall be effectively grounded. 
• All the Distribution Boards, Switch Fuse Units, Bus bar chambers, ducts, cubicles etc. shall have 
MS  enclosures  and  shall  be  dust,  vermin  and  waterproof.    The  Distribution  Boards,  switches 
etc. shall be so fixed that they shall be easily accessible.  Changes shall be done only after the 
approval of the Project Manager. 
• The  contractor  shall  provide  proper  enclosures/covers  for  protection  of  the  entire 
switchboard,  equipment  etc.  against  rain.    Exposed  live  parts  of  all  electrical  circuits  and 
equipment  shall  be  enclosed  permanently.    Crane  trolley  wires  and  other  conductor  which 
cannot be completely insulated shall be placed such that they are inaccessible under normal 
working conditions. 
• Ironclad industrial type plug outlets are preferred for additional safety. 
• Open type distribution boards shall be placed only in dry and ventilated rooms; they shall not 
be placed in the vicinity of storage batteries or otherwise exposed to chemical fumes. 
• Isolating  switches  shall  be  provided  close  to  equipment  for  easy  disconnection  of  electrical 
equipment or conductors from the source of supply when repair or maintenance work has to 
be done on them. 
• In front of distribution boards a clear space of 90 cm shall be maintained in order to have easy 
access during an emergency. 
• Adequate  working  space  shall  be  provided  around  electrical  equipment,  which  requires 
adjustment or examination during operation. 
• As far as possible electrical switches shall be excluded from a place where there is danger of 
explosion.   All  electrical equipment such  as  motors,  switches and  lighting  fittings  installed  in 
workroom where there is possibility of explosion hazard shall be explosion proof. 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 35 of 105 
 

• All connections to lighting fixtures, starters or other power supplies shall be provided with PVC 
insulate,  PVC  sheathed  twin/three/four  core  wires  to  have  better  mechanical  protection  for 
preventing  possible  damage  to  equipment  or  injury  to  personnel.    Taped  joints  shall  not  be 
allowed  and  the  connections  may  be  made  in  looping  system.    Electric  starter  of  motors, 
Switches  shall  not  be  mounted  on  wooden  boards.    Only  sheet  steel  mounting  or  iron 
framework shall be used. 
• All the lighting fixtures and lap holders shall be of good quality and in good condition.  Badly 
repaired or broken holders, etc. shall not be used. 
• Only  PVC  insulated  and  PVC  sheathed  wires  or  armored  PVC  insulated  and  sheathed  cables 
shall  be  used  for  external  power  supply  connections  of  temporary  nature.    Weatherproof 
rubber wires shall not be used for any temporary power supply connections.  Taped joints in 
the wires shall not be used. 
• The bulbs/lamps used for illumination and testing purpose shall have cover or guard to protect 
them  from  accidental  breakage.    Only  24  V  supply  system  shall  be  used  for  hand  lamps  etc. 
while working inside metallic tanks or conducting vessels. 

14.24‐Portable Electrical Equipment 

• Portable  electrical  equipment  shall  be  regularly  examined,  tested  and  maintained  to  ensure 
that  the  equipment  and  its  leads  are  in  good  order.    Register  shall  be  maintained  for 
inspection, recording the testing dates and results of the equipment. 
• All portable appliances shall be provided with three‐core cable and three‐pin plug.  The third 
pin  of  the  plug  shall  invariably  be  earthen.    It  shall  be  ensured  that  the  metal  part  of  the 
equipment shall be effectively earthen. 
• All  connections  to  portable  equipment  or  machines  from  the  panel/distribution 
board/extension board shall be taken using 3 core double insulated PVC flexible copper wires 
in one length.  No joints shall be allowed in this flexible wire.  In case single length of wire is 
not  sufficient  for  a  particular  location  then  the  supply  can  be  tapped  by  providing  another 
extension board comprising of switch and socket. 
• Flexible  cables  for  portable  lamps,  tools  and  apparatus  shall  be  regularly  examined,  tested 
periodically and maintained to ensure safety. 

15. GENERAL 

15.1‐EHS Trainings: 

15.1.2‐EHS induction:  

It  is  mandatory  to  provide  Induction  training  to  each  and  every  person  working  inside  the  project 
irrespective of cadre and trade.  
During  induction  training  the  project  EHS  rules  and  regulations  would  be  highlighted  and  Dos  and 
Don’ts of EHS would be explained and made them understood the general risks and measures to be 
taken by each and every one. 

15.1.2‐.Periodical training programmes: 

Specific  training  programmes  for  the  following  activities  will  also  be  organized  to  promote  EHS 
education for respective trades/ supervisors/ technicians  
1. Safety in Welding and gas cutting operation  

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 36 of 105 
 

2. Working at height (Staging/ladders 0E 
3. Safety in operation of Power and hand tools  
4. Fire hazards and control  
5. First Aid  
6. Electrical safety  
7. Personal protective Equipment  
 
All the above specific trainings would be organized and scheduled on an average one programme in 
a month  

15.2‐Hazard Identification & Control Measures 

The Hazard identification is basic requirement for the Accident Prevention.  
The techniques which are include Inspections, Audits and Risk assessment etc. 

15.2.1‐EHS inspections: 

The Site safety inspection during work by EHS Coordinator and also by project coordinators in the site 
play a key role in eliminating unsafe conditions and unsafe acts/unsafe practices by the workmen. Any 
EHS violations during inspection should be immediately brought to the notice of concerned site in 
charge for immediate corrective measures to ensure safe working. Until and unless prevailed unsafe 
condition or deviation is corrected the work activity should not be allowed to continue. 
EHS inspection checks (General) is to be kept in mind during inspection for hazard identification is in 
Annexure  

15.2.2‐EHS audits: 

Apart from regular site inspection by EHS coordinator, periodical EHS Audit will be done by Regional 
EHS  Coordinator  or  Project  EHS  personnel  to  assess  the  EHS  performance  and  to  suggest  for 
improvement. 
The techniques applied for the safety inspection/Audit can be as follows. 
 Preparation 
  ‐ Select areas of greatest hazard or activity to audit 
  ‐ Use toolbox talks to set objective / standards for the workforce 
  ‐ Set a good personal example. 
 Observations 
  ‐ Take time to watch an activity or situation. 
  ‐ Concentrate on people. 
  ‐ Look for unsafe acts, violation of safety rules or unsafe conditions. 
  ‐ Recognize good as well as bad practices. 
 Discussion 
  ‐ Discuss with the workforce how the job could be done more safely 
  ‐ Encourage them to identify hazards & to suggest improvements 
‐ Ensure that all unsafe acts & conditions are discussed 
  ‐ Honour the good safety practices. 
 Follow – up 
  ‐ Check at random for repetition of safety violations 
  ‐ Give formal written warnings for repeated violations by individuals 
‐ Contractor / Subcontractors auditors are to report their findings on a weekly basis to 
principal client together with action. 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 37 of 105 
 

15.2.3‐Risk assessment: 

Risk Assessment is an ongoing activity throughout the life of the project. It is used in developing the 
Safe Work Method Statement – SWMS (or also called Job Safety Analysis). 
The  SWMS  requires  the  work  method  to  be  presented  in  a  logical  sequence.  The  hazards  /  dangers 
associated  with  each  process  are  to  be  identified  and  person  who  is  responsible  to  take  remedial 
measures shall be specified for controlling these hazards. 
Safe work method statements must include the following provisions as a minimum. 
• The sequence of activities or work tasks to be carried out (ie. Job steps involved in doing the 
work) 
•  Identification & assessment of the risk arising from those activities or tasks in relation to the 
site  and  any  person  likely  to  be  affected  by  them  (ie.    Identify  &  assess  potential  hazards 
associated with each job step). 
•  The  way(s)  in  which  the  identified  risks  will  be  reduced  to  an  acceptable            level  ie.  The 
controls that will be put in place to eliminate or minimize      the potential hazards identified). 
• The management system used to monitor compliance with the agreed safe system of work. 
• The way in which the progress of the work will be reviewed for the     purpose of EHS in order 
that any necessary modifications and   improvements to the system of work can be identified 
and introduced. 

15.3‐Safe Work Permits System: 

A    Work  permit  system  is  used  to  ensure  safe  working  by  eliminating  possible  associated  high  risks 
such  as  blasting,  excavation,  working  at  height,  hot  works(welding,  gas  cutting),confined  space 
,working isolated areas ,electrical shock, chemical exposure, fire hazard during the process of work. 
Safe work Permit is required to be obtained for the following works  
1. Blasting works 
2. Excavation 
3. Hot work (welding and gas cutting operations) where the risk of fire is involved  
4. Height work ( for the works above 2mts height ) 
5. Confined space 
6. Electrical works (when working on over head line/ transformers or major electrical works )  
7. Any Hazardous nature of job in isolated areas  where high risk is prevailed  
Work permit should be obtained before starting of the activity by the designated issuing authority of 
the Project after inspection and ensuring recommended safety measures given by EHS Coordinators. 
 
 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 38 of 105 
 

15.4 BLASTING PERMIT 

Project:                                                                                                                            Date:                                                 

No. of the Blasting:                                                                                                                                                               

Location of the Blasting:                                                                                                                                                          

Name of the Licenced Blaster/Shot Fierier:                                                                                                                      

Name of the Contractor:                                                                                                                                                          

Starting time of drilling operation:      

ISSUING AUTHORITY: 

The precautions & safe conditions mentioned below have been verified and blast can be carried 
out. People shall be evacuated from danger zone and warning sirens shall be blown before the blast. 

PERMIT IS VALID from……………hrs to……… hrs     

Name & Signature of issuing authority: ………..                                           

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 39 of 105 
 

Blasting Check‐list: 

S. No  Description      Yes     No  Remarks 


1  Whether the detonators are checked individually for       
continuity and resistance 
2  Do all the detonators belong to the same manufacturer       
3  Whether the explosives and cartridges selected for use are       
of correct size 
4  Whether the explosives and cartridges are of approved       
quality 
5  Whether the condition of lead/leg wires are checked?       
6  Whether sockets in the blasted area are flushed with air &       
water and plugged 
7  Whether the bore holes are cleared of all the debris before       
explosives are inserted 
8  Whether all the excessive cartridges are removed from       
work spot 
9  Whether it has been counted that the number of persons       
involved in the operation have come out of the spot after 
loading? 
     10  Whether the environmental conditions are considered?       
(Rain/Sunny/Wind/Thunders/Lightning) 
      11  Are electronic items /radios/mobile phones/pagers       
prohibited in the location? 
     12  Whether the danger zone is suitably cordoned and flagmen       
posted at important points 
     13  Whether suitable warning boards are displayed at site?       
     14   Whether no of entry  points identified and access control is       
established 
     15  Whether blaster’s shelter is available in good condition?       
     16  Whether proper signaling system is established to prevent       
trespassers entering the blasting zone, siren or hooter is 
available. 
     17  Whether all the drillers have been provided with ear plugs,       
helmets. goggles and gumboots? 
     18  Whether a record has been maintained in separate register       
indicating 
a) Date & Time of blast 
b) Number of holes charged 
c) Type of explosive used 
d) Amount of charge per hole 
e) Firing pattern & sequence 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 40 of 105 
 

     19  Record       
a) Quantity of explosive brought from magazine 
b) Quantity of explosive used 
c) Quantity of explosive returned to magazine 
 
     20  Any Electrical /Telecom line or Cables near by?       
If so, specify the distance & Voltage……… 
     21  Whether the circuit has been checked       
Specify the resistance ……….. 
 

I have checked the above points and found conditions suitable to undertake the blast. 

Name & Signature of the Permittee: 

Check points after blasting: 

S. No  Description       Yes       No  Remarks 


1  Whether any mis‐fire detected, If yes       
Give the no. of holes: ……….. 
Brief  of action taken: 
 
2  Whether’ ALL CLEAR’ siren is blown &mention the time       
of ‘ALL CLEAR’ siren. 
Time: 
 
 

Name & Signature of Permitee: 

Name & Signature of Issuing Authority:  

Permit Closure: 

Permit is closed on: 

Date& Time: 

Name & Signature of Issuing Authority: 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 41 of 105 
 

15.5EXCAVATION PERMIT 

Permit No:                                                                                                                      Date:                                              

Project Name:                                                                                                                                                              

Contractor’s name:                                                                                                                                                                         

Sub‐contractors name: 

Excavation details: 

Purpose: 

Area/Location:         

Proposed date and time: 

Proposed date & time of completion: 

Equipment and Tools used: 

Excavation length …………….. in m 

Excavation width ……………… in m  

Excavation depth…………….. in m 

Preparations: 

S. No  Description  Yes/ No 


1  Underground cables, pipelines, electrical lines etc checked   
2  Personal Protective Equipments to be used:   
a) Safety shoes 
b) Safety helmets 
c) Gloves 
d) D0Eye protection 
e) Ear protection 
f) Dust mask 
 
                                    

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 42 of 105 
 

Safety precautions: 

S.No  Description  Yes/ No 


1  Proper access made with required no. of exits   
2  Provide and use proper PPE   
3  Barricade the area, display caution boards    
4  Ensure good house‐keeping   
5  Use certified equipment and machinery   
6  Check for underground services   
7  Check operators licence   
8  Check for reverse horn for the equipment   
9  Ensure constant supervision   
     
 

Checked by: 

Contractor’s Safety Officer: 

Name& Signature: 

Date: 

PERMIT ISSUING AUTHORITY: 

PERMIT IS ISSUED & VALID UPTO: 

Permit is Re‐validated for a period of: 

PMG Safety Officer: 

Name & Signature: 

Date: 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 43 of 105 
 

15.6WORKING AT HEIGHT PERMIT   

                                                                                                     Permit no:                                                       

  Job description: 

  Location: 

  To be carried out by:                                                                                                                                 

Safety Precautions: 

   S. No  Description  Yes / No 


  Scaffolding:   
1  Scaffoldings of good construction ,adequate with 600 mm width   
walkways, toe‐boards 
2  Scaffold secured with stairways, wide enough to pass 2 persons   
at a time, hand rails,(should be of metal scaffolding) 
3  Maintain good housekeeping at work locations   
  Safety nets:   
1  Safety nets fixed at the bottom of scaffold to prevent bodily   
injuries  in case of fall 
  Ladders:   
1  Strong  materials used and well maintained   
2  Ladder not placed against loose boxes, round materials. objects,   
near electrical installation  
3  Ladder of sufficient height  used, on top tied and positioned at   
the foot of ladder 
4  Safety foot ware provided at base   
5  Ladder placed at an angle of 70 ‐75 degrees    
6  Area of the work barricaded so that no person can walk under   
the ladder 
  Personal Protective Equipment:   
1  Safety harness provided and worn   
Above safety precautions have been taken. 

Name & Signature of permittee: 

Date: 

 
Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 44 of 105 
 

Permission issued from ……….. hrs to ……….hrs 

Date: 

Name & Signature of issuing authority: 

Permit closure: 

This permit is closed on …………  hrs. 

Name & Signature of permittee: 

Date: 

 Name & Signature of issuing authority: 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 45 of 105 
 

15.7 HOT‐WORK PERMIT 

Permit No:                                                                                                        Date:    

Location: 

Nature of the job:         

The area of work has been examined, precautions checked mentioned below have been taken to 
prevent    fire. 

 Safety precautions:     
a) The technician must inspect the proposed precautions taken to prevent fire. 

Electrical Isolations: 
a) Electrical isolation required for equipments isolated. 
b) Electrical cables covered. 

General Precautions: 
a) Fire extinguishers are in service. 
b) Cutting and welding machines are in good condition. 
c) Area technician notified. 

Precautions near area of work: 
a) Near by area swept clear of combustibles. 
b) No combustible, flammable liquids  are near by. 

Fire watch:  
a) To be provided during operation. 
b) Supplied with fire extinguishers. 
c) Trained in use of equipment for fire fighting. 

I, have personally examined the area and certify, precautions have been taken for the above 
mentioned area. 

Name & Signature of the technician: 

 
Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 46 of 105 
 

PERMISSION ISSUING AUTHORITY: 

Permission issued for this work from ……….hrs to …… hrs. 

Permit expiry date: 

Name & Signature of issuing authority: 

Name &Signature of the permittee: 

Permit Closure: 

Date & Time ………….. this permit is closed. 

Name & Signature of Permittee. 

Name & Signature of issuing authority: 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 47 of 105 
 

15.8 CONFINED SPACE PERMIT 

                     (To prepare safe working practices related to working inside a confined space /                 
vessel/plant/equipment) 

A. Permitee (The person taking the permit) to fill: 

1. Location of the confined space: 

2. Identity of the confined space: 

3. Purpose of entering the confined space: 

4. Date & Time: 

5. Check‐list: 

a)  Has the Vessel/Equipment/Space has been cleaned, purged, isolated  Yes/No 


b)  Have all electrical/air/hydraulic equipment/drives been disconnected  Yes/No 
c)  Are the persons required to enter the confined space are trained in dealing  Yes/No 
with the specified hazards 
d)  Personal protective equipment  provided  Yes/No 
e)  Is the rescue team equipped with emergency rescue devices put on as stand  Yes/No 
by 
f)  Is 24 V hand lamp provided for use inside?  Yes/No 
g)  Is forced ventilation provided? (Exhaust/Fresh airflow fan)  Yes/No 
 

6. Tests required: 
1) Oxygen level (19.5% to 23.5%) 
2) Explosivity (0%) 
3) Carbon monoxide level (50ppm max.) 
4)  Carbon di‐oxide level (1200 ppm max.) 
5) Temperature 
6) Air‐flow 
7) Others 
 

7.  List of authorised persons to work inside the confined space& the rescue team.                                                       
(List to be enclosed) 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 48 of 105 
 

     I have checked the above points and found the conditions are suitable to undertake the work. 

Name & signature of the Permitee:                                                                                                                                 
(Site Engineer)                                                                                                                                                              
Designation: 
A. Permit issuing authority(The person giving permit) to fill: 
 
The safety precautions and safe conditions mentioned above have been verified and work 
can be started. 

Name & signature of Safety Officer:                                                                                                          

Name & signature of issuing authority:                                                                                                                        
(Section in‐charge)    

  
B. Permit closure: 
 
Date & Time …………. this permit is closed. 

Name &signature of Safety Officer: 

Name &signature of issuing authority: 

 
• Note: The scope of this permit is limited to entering into confined space. Relevant work 
permits shall be obtained for carrying out activities inside the confined space along with this 
permit. 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 49 of 105 
 

15.9 PERMIT FOR WORKING IN ISOLATED AREAS    

Permit No: 

Date: 

Location: 

Time: 

ISSUE: 

Nature of jobs identified:   
1) …………………………………………………… 
2) ………………………………………………….. 
3) ………………………………………………….. 
4) ………………………………………………….. 
 
A. Safety measures to be provided and followed: 
a) ……………………………………….. 
b) ……………………………………….. 
c) ……………………………………….. 
d) ………………………………………… 

I hereby authorize Mr.: …………………………………. to carry out the above work. 

Name & signature of Site Engineer: ……………………………. 
B. Acceptance: 

 I have understood the hazards and safety precautions /requirements to carry out the above 
mentioned work and I accept to undertake the work. 

Name & signature of Contractor’s Engineer: …………………………      

C. Name& signature of issuing authority: 

Date& Time: 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 50 of 105 
 

15.10   Accident Reporting & Investigation 

Recording & Reporting: 
All incidents or accidents shall be recorded, investigated and reported to Project manager. 
Occupation  illness  and  all  incidents  of  fire,  explosion,  implosion,  release  of  hazardous  substance  or 
other  near‐miss  incidents,  which  have  potential  to  cause  harm  to  environment,  shall  also  to  be 
reported within following shift / day. 
The  first  hand  information  of  Accident/Incident  should  be  sent  in  writing  to  EHS  coordinator  for  his 
investigation and further action  

         15.11 Educating Labour: 

• Safety Posters/sign boards to be installed at site at different locations. 
• Safety Officer to conduct safety meet periodically and hold pep talks with workmen. 
 
• No materials on any of the sites of work shall be so stacked or placed as to cause danger or 
inconvenience to any person or the public. 
• At the completion of the work, the contractor shall ensure removal from the work premises all 
scaffoldings, surplus materials, rubbish and all huts and sanitary arrangements used/installed 
for workmen on the site. 

15.12 Reporting Of Accidents: 

• All  accidents  leading  to  personal  injuries  or  property  damage  shall  be  reported  to  the 
concerned authorities e.g., Client, Regional Office, Head Office, Police and Insurance Company. 
• Monthly Safety statistics shall be submitted detailing the accidents, nature of injury including 
disability, number of man‐days  lost, and medical treatment provided  and extent of property 
damaged. 

15.13 Emergency Evacuation Plan 
o Remove the injured person from the disaster area if they are in further danger. 
o Do not move the injured person or ask him to stand if there is no further danger. 
o Advise all unaffected persons to move out of the site. 
o Escape  through  Fire  Exit  routes  to  the  Designated  Assembly  Points  e.g.:  Security  gate  or 
Terrace or any other location indicated in Emergency Plan) for further Action 
o Maintain silence and quickly move out but do not run.  
o Designated  In  charge  as  indicated  in  emergency  plan  would  be  the  chief  of  emergency 
operations in case of the evacuation and in his absence Security Guard would be responsible 
for evacuation.  
o Render First Aid to the victims through trained first Aider and then shift them to the nearest 
hospital for treatment  
Information of Key personnel:  
    In order keep informed all concerned the following information is to be prominently displayed at 
main Entrance of project  
• Name and Contact Number of Project In charge  
• Name and contact Number of Nearest Police station  
• Name and contact Number of Nearest Fire Station  
• Name and contact Number of Nearest Hospital  
• Name and contact Number of nearest ambulance center  
• Name and contact Number of First Aider available at site 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 51 of 105 
 

• Name and contact Number of Security Incharge 
• Name and contact Number of EHS Incharge 

15.14 Personal Protective Equipment (PPE) 
Personal  protective  equipment  play  significant  role  in  reducing  the  intensity  and  preventing  injury 
incase  of  any  accident  during  the  course  of  construction  activities.  The  PPE  should  be  of  standard 
make and confirm to IS specifications.  
 
The PPE should be checked and ensure its good condition before use  
 
The following general personal protective equipment/Safety appliances are to be provided wherever 
 required and should used religiously  
 
1. Safety helmets      :  All persons at site 
2 Safety shoes           :  All persons at site  
3 Safety belt              :  Men working at height and life line should be anchored to a fixed 
                                        point at above chest level. The life line should not be less than ¾” 
                                        dia and 2M long. 
3. Hand gloves          :   Persons doing material handling jobs, gas cutting, electrical works, 
                                        welding or operating paving breakers, vibrators, handling concrete 
                                        mixing of asphaltic materials, lime mortar, cement etc.                 
                                        It should of correct type for specific activity. 
4. Safety goggles      :   Persons involved in the activity of gas cutting, brick dressing,  
                                      welding, grinding, operating pavement breakers,  
                                      mixing of asphaltic materials, lime mortar, cement etc ,  
5. Safety nets, canvass sheets: Protect people falling from height, and the material falling on people  
6. Ear plug or Ear muffs           : workmen where exposed to noise level above 90 dB. 
.7 Face/Nose masks.                 : Persons engaged for spray painting or rubbing / scrapping of dry  
                                                        lead paint, cement and dust emission during chipping and 
                                                        breaking and demolishing activities in work area  

      In  order  identify  the  employees  of  different  categories  and  department  it  is  common  practice  to 
provide different colour coding to safety helmets as given below: 
 
Workmen                                                         ‐ Yellow. 
Electrical staff                                                  ‐ Red  
Safety officer or staff of safety dept              ‐ Green .or White with green colour band 
Rigger/foreman/Supervisor                            ‐ Blue  
Project coordinators /Engineers/Mangers    ‐ White. 
Visitors                                                            ‐ White  

15.15 Project EHS‐Status 

 
Following information to be displayed at the entrance  
  
• Project Name  
• Status date 
• Number of Man hours as on date  
• Cumulative Man hours completed as on date 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 52 of 105 
 

• Number of reportable accidents  
• Loss of Man hours due to accidents 
• Total number of Safe Man hours clocked 
 

15.16 Site Entry Process 

 
All  those  involved  in  project  activities  would  be  allowed  only  through  valid  ENTRY  PASS  which 
should be the personal identification of the individual.  
 
The  passes  are  issued  by  the  respective  company/contractor.  The  Entry  pass  is  only  valid  if,  the 
individual has undergone EHS Induction and ear marked on Pass as “EHS INDUCTED”.  
 
The Company/Contractor engaging manpower for working inside project has to seek permission in 
prescribed requisition form from Security In charge of the project. After checking the passes and duly 
entered  the  information  in  security  register  the  security  allows  personnel  to  enter  the  project 
premises  
 
 
The ENTRY PASSES posses the following general information. 
 
PROJECT:  
Pass Number:                                Date of Issue: 
NAME:                                          Designation:  
EHS Induction given on :  
 
Signature of Issuing Authority: 
Name of Company/contractor: 
Prescribed requisition format for seeking permission to enter project is in Annexure  
Similarly “Visitor’s Pass” and “Material Gate pass” would be introduced for security control. 

16. FORMATS 

16.1 Site Safety Rules 

You are advised to follow all the time the DOs and DON’Ts given below for the safety of every one 
working in project. 
Warning: Deliberate ignorance of these safety rules will be viewed seriously and liable for penalty/ 
removal from site. 
DOs 
1. Under go EHS induction Training before entering into project site/ ensure all your employees 
received EHS induction Training 
2. Provide and ensure proper use of PPE such as Safety shoe, Safety helmet, Safety shoes, Safety 
gloves, Safety belt (when working at height) etc by all the employees in the project 
3. Comply with method statement wherever applicable 
4. Ensure  “Work  Permit”  prior  to  start  of  activities  such  as  work  at  height,  Hot  work,  Deep 
excavation etc., 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 53 of 105 
 

5. Ensure  all  activities  related  to  Electrical  energy  is  handled  by  competent  person/authorized 
electrician only 
6. Ensure that proper lugs are provided to welding cables 
7. Ensure  that  proper  wedging/locking  of  wheels  is  done  for  mobile  scaffold/Concrete  Mixer  / 
Transport vehicles before starting the work activity 
8. Ensure proper barricading/ covering where there is a danger of fall of persons/ fall of material 
from top. 
9. Check front, back and bottom of the vehicle before starting to move the vehicle 
10. Watch vehicle movement and cautions while walking in the project area. 
11. Clean  and  kept  workplace  neat  and  tidy  and  remove  all  wastage/scrap  from  the  work  spot 
after completion of each work without delay.  
DON’Ts 
1. Smoke in the project premises 
2. Drink liquor in the project premises  
3. Use open place for Toilets (Use Toilets provided in the project site) 
4. Run the vehicle beyond 10 Kmph speed 
5. Play with Hazardous chemicals 
6. Interfere in others work 
7. Enter areas not of your concern without permission 
8. Work at height and under HT lines during raining, lightening and heavy wind 
9. Dress Lungi/ half pant during working at project (Wear full pant and shirt). 
 
I have read and I abide with the rules 
 
Name:                                     Signature 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 54 of 105 
 

16.2 EHS Responsibility & Accountability for Contractors 

 (This document will be issued with Tender documents) 
The  following  specific  responsibilities  are  assigned  to  you  with  respect  to  Environment,  Health  and 
Safety (EHS) 
You shall ensure that 
1. Inspection of your area and corrective actions against deviations immediately  
2. Good housekeeping of your area and at work spot 
3. Work permit system (wherever applicable) is followed by all your workmen /supervisors/Sub‐
contractors. 
4. All your employees/supervisors/Managers are trained in safety, first Aid and supervisors. 
5. All  portable  tools  are  double  insulated  /properly  earthed/adequately  guarded  as  per 
standards and in good working order  
6. The  concerned  employees  /trainees/managers  receive  EHS  Induction  as  well  as  on  the  job 
training  as  and  when  require  (if  new  machines  are  installed  or  working  procedures  are 
changed ) 
7. Safe work practices are adopted by all your employees at project site 
8. All employees are provided with required Personal Protective Equipment (PPE) and its proper 
usage and adhered to other EHS rules at project site.  
9. Inspection/checking of all Tools and tackles being used by your personnel and ensure safety 
measures during operation of the same  
10. The Authorized Test certificate from competent person in respect of crane, chain pulley blocks 
and  Lifting  tackles  such  as  wire  ropes,  chains,  slings  etc  being  used  by  you  in  the  work 
activities. 
11. All  electrical  operated  equipment/tools/appliances  are  drawn  supply  through  ELCB  (Earth 
Leakage Circuit Breaker) to prevent Electric Shock hazard  
12.  Investigation  of  Incidents/Accidents  and  implementation  of  remedial  measures  and  its 
record. 
13. Rendering  of  First  Aid  and  reporting  of  Accident  to  Project  Manager/EHS  coordinator 
immediately.  
14. All your employees are covered with valid insurance.  
15. Your  drivers/operators  posses  Valid  driving  License/Experience  Certificate  (wherever 
applicable).  
16. All vehicles/motorized equipment have valid “C” book and insurance coverage.  
17.  The  effective  supervision  through out the work  activity to ensure safe  practices  in  order  to 
prevent Unsafe conditions/Unsafe Acts of workmen  
Please  acknowledge  the  receipt  of  this  document  by  signing  on  duplicate  copy  as  a  token  of 
acceptance of the said responsibilities assigned and return the same for record  
 
Date;                                                         Project Manger /EHS Coordinator 
To  
M/s  
 
Received the copy of “EHS Responsibility and Accountability for Contractors” and I hereby accept and 
acknowledge the same. 
 
 
Name and Signature of Contractor’s Project In charge  
 
Date: 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 55 of 105 
 

16.3 EHS –Induction  

 PROJECT:                                                  DATE:                             TIME: 
 
The following safety topics have been made understood by us in respect of Safety at project 
1 EHS rules at project site     
2  Housekeeping    
3  Reporting of Hazards  
4  Electrical safety 
5 Safety while work at height    
6 Ladder & scaffold safety               
7 Importance of PPE & its use  
8 First Aid & Fire prevention     
9 Welding &Gas cutting   
   
SNO NAME  DESIGNATION COMPANY/CONTRACTOR  SIGNATURE

       

       

       

       

       

       

       

       

       

       
CONDUCTED BY:  
  NAME:                                            
 
  DESIGNATION:                                                                       SIGNATURE: 
 
 
 
 
 
 
 
 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 56 of 105 
 

16.4 Safety Pep Talk 

PROJECT:                                                                      DATE:                   TIME: 
 Topics highlighted in the pep talk: 
   1                                                                              4 
   2                                                                              5 
   3                                                                              6 
   
S.no. Name  Designation  Company/Contractor  Signature 

         

         

         

         

         

         
 
CONDUCTED BY:  
 
NAME:                                            
DESIGNATION:                                                                   SIGNATURE 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 57 of 105 
 

16.5  Incident / Accident Investigation Report        

Name of Contractor/Sub contractor          : 
Name of Accidentee or Person Involved   : 
DATE & TIME                                                  : 
Location                                                          : 
Description of Incident/Accident  
(Brief narration how it occurred)               :    
Nature of Damage /Injury                           :  
Witness (if any)                                             :             
Observation                                                   : 
       
 
CAUSE OF ACCIDENT/INCIDENT               : 
 
 
      
Corrective action taken/suggested for           : 
Prevention of recurrence  
 
 
                                                                                                          Signature      :    
Date:                                                                                                Name             : 
                                                                                                          Designation  :    

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 58 of 105 
 

16.6 EHS Inspection 

To:                    Date:  
Observed the following unsafe conditions/Unsafe acts during site inspection today                    
   
          
 Findings:                           
 
 
 
 
 
 
 
 
 
 
 Action required: 
 
 
 
Kindly arrange for corrective action on priority. 
                 
Thanking you, 
                                                                                    EHS‐Manager/ Coordinator 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 59 of 105 
 

16.7 On The Job Safety Communications 

Project:                  Date:                                    Time:               
 
                                              :                                                                 
Name Of contractor/Sub‐contractor    :                          
 
Location                                                      :    
 
Brief description of Safety violation      :                         
 
 
 
Safety advice / Instruction Given           :  
 
 
Instruction Given by  
 
Signature: 
 
Name:    
 
Instruction Received by 
 
Name:   
 
Signature:   

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 60 of 105 
 

16.8 EHS Status Report                                                                                 

                                                                              Date:        
PROJECT:                                                           Month:                                                                                         
Observations/Corrective Actions :( NCR) 
SNO      Nature of Violation         For the month    Cumulative as on date: 

             Observed Corrected Observed Corrected


1  Non‐Use of PPE          

2  Unsafe Acts    

3  Unsafe Conditions    

4  Unsafe  practice    

5  House keeping          

 
Safety Education & Awareness Programmes: 
                                        No .of          No. of   Cumulati
SNo  Deatails of programme  DATE   participants  programme  ve as on Date 
during month  
Staff  Workers     
1  Safety committee meeting            
 
2  Training  on   
a) 
b) 
c) 
3  Safety Pep talk  on            
a) 
b) 
c) 
4  Demonstration on   
a) 
b) 
c) 
 
REMARKS  
 
 
EHS ‐INCHARGE                                                                     PROJECT INCHARGE 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 61 of 105 
 

16.9  Safety Committee Meeting  

PROJECT: 
 
DATE:                                         TIME:                                          VENUE: 
 
SNO                     NAME  Organization/contractor  Signature 

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 62 of 105 
 

16.10 EHS Penalty 

Project:                                                                                            Date: 
To 
    M/s  
  
  
 
Through: The Project Manger  
 
 Sub:  Penalty towards Violation of EHS rules at Project site ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
A penalty of Rs.                 (Rupees                               ) is imposed on you for violation of EHS rules by 
your staff/workmen at Project site.  
Details of Violation: 
Name of Person:  
 
Date:                                                   Time:            AM/PM  
Location: 
 
EHS Violation: 
   
                                                                              Project EHS‐ coordinator 
 
CC  to Project Coordinator  (concerned for the location ) 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 63 of 105 
 

17 SAFETY CHECKLISTS 

17.1 General safety 

General Construction Safety Checklist cum Audit Report 
PROJECT : 
LOCATION :                                                                                                                    DATE : 
INSPECTION CONDUCTED BY : 
S.N General Construction Safety Checklist cum Audit 
YES  NO  REMARKS 
O  Report 
  MANAGEMENT COMMITMENT     

1  Is there a safety policy?     

2  Is the safety policy displayed at site?     
Is everyone aware of the contents of the safety 
3     
policy? 
4  Are there safety plans and safety procedures?     

5  Are the employees aware of the safety plans?     

6  Is there a safety organisation?     
Is there a competent safety professional available at 
7     
site? 

8  Is there a safety committee?     

Is project management actively participating in HSE 
9     
Programs? 

  SAFETY TRAINING & AWARENESS PROGRAMS     

1  Are employees given safety orientation?     
Are employees given  specialised training where 
2     
needed? 
3  Are tool box talks regularly conducted?     

4  Are the bulletin boards at site?     

5  Are safety material displayed at site?     

6  Are there site safety instructions to various trades?     

7  Are method statements made for critical activities?     

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 64 of 105 
 

8  Is SPA made for routine and new activities?     

9  Are workers participating is formulating SPA?     

  EMERGENCY RESPONSE     

1  Is there a first aid centre at site?     

Is the First Aid Centre equipped with the required 
2     
medicines and accessories? 

3  Is there a qualified doctor/nurse available at site?     

Is there any arrangement with hospital for 
4     
emergency treatment? 

5  Is there an emergency response team?     
Is the team trained on emergency response 
6     
procedures? 
7  Are workers aware of the emergency procedures?     
Are employees aware of the actions to be taken in 
8     
case of : 
  Accidents     

  Fire     

  Gas Leakage     

  Gas Cylinders on fire     

  Snake/ Scorpion bites     

  Sun Stroke     

  Electric shock     

9  Are emergency telephone numbers displayed?     

10  Is emergency vehicle/ ambulance available at site?     

11  Are trained first aids available at site?     

12  Are there assembly points available?     

13  Is there an effective communication system?     

14  Are mock drills conducted at regular intervals?     

       
 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 65 of 105 
 

17.2 DAILY INSPECTION CHECK‐LIST FOR SAFETY MEASURES AT SITE 

PROJECT : 
LOCATION :                                                                                                                    DATE : 
INSPECTION CONDUCTED BY : 

S. No                  Description     Yes      No       Remarks 


1  Are all persons entering site wearing Safety       
helmets and Safety shoes? 
2  Are persons working above 2 meters, wearing       
safety harness with life line anchored to a rigid 
support?  All works over 2 meters must be 
carried out on good working platforms which 
are built acceptable to safety standards. 
3  Are special electrical equipment required for       
electrical works available? 
4  Are safety guards for moving parts of       
machines in position?  
5  Are openings/pits covered, barricaded and       
warning signs displayed? 
6  Is house‐keeping in order, materials are       
stacked properly in marked areas? 
7  Is the work area polluted with dust, fumes,       
gases etc for which safety appliances are 
provided or not? 
8  Are fire extinguishers available at site?       
9  Are fire extinguishers hanged on wall with       
proper clamps or placed on ground? 
10  Is validity of refilling extinguishers displayed       
on the body of extinguisher? 
11  Are fire buckets available at site?       
12  Are fire buckets filled with water and sand?       
13  Is earthing provided to all equipments?       
14  Does the earth conductor continued up to the       
distribution board? 
15  is ELCB provided to all electrical circuits?       
16  Is the access and working platforms properly       
illuminated? 
17  Is insertion of loose wires in sockets without       
plug sockets present?  
18  Is improper joining of cables and wires       
prevailing at site? 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 66 of 105 
 

19  Is proper cover for DB, PDB etc provided with       
locking arrangement? 
20  Are lifting equipments and tackles in good       
working condition and recently load tested? 
 

                                                                                                                  

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 67 of 105 
 

17.3 Site layout 
 
         
Site Layout Plan 
PROJECT : 
LOCATION :                                                                                                                       DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Site Layout Plan  YES  NO  REMARKS 

1  Is perimeter fencing arranged?          
2  Is the access at the site entrances clearly visible?          
Is the access wide enough to allow plant and 

personnel?          
4  Is there a proper access control system?          
5  Is there sufficient lighting at the entrance?          
Are there proper arrangement for storage of plant 

and material? 
        
7  Are there off loading facilities?          
8  Are there scrap dump areas?          

Are there special storage areas for petrol, 

flammable materials, explosives etc…? 
        
Are access roads suitable for the movement of plant 
10 
and vehicles? 
        
11  Is car parking area adequate?          
12  Are sanitary facilities suitably located?          
Are welfare facilities like canteens, rest rooms etc.. 
13 
Are provided? 
        

Is the Ambulance room/ emergency vehicle suitable 
14 
located? 
        

              
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 68 of 105 
 

17.4 Personal Protective Equipment (PPE) 
 
         
Personal Protective Equipments 
PROJECT : 
LOCATION :                                                                                                                                              DATE : 
INSPECTION CONDUCTED BY : 

         
S.NO  Personal Protective Equipments  YES  NO  REMARKS 

1  Are all persons wearing safety helmets while on site?       
Are the workers using the chin strap of their safety 
2       
helmets? 
3  Is everyone wearing safety shoes while on site?       

4  Is everyone wearing safety goggles where needed?       

Are the workers wearing suitable hand gloves while 
5       
handling rough objects, chemicals etc..? 

Are workers wearing full body safety harness while 
6       
working at heights? 
7  Are the workers anchoring their safety harnesses?       

Are workers wearing respirators when exposed to dust, 
8       
harmful chemicals and poisonous gases etc..? 

9  Are workers using suitable PPE as per the hazards?       

10  Are there sufficient stocks of PPE?       
Are the PPE regularly inspected for there good 
11       
condition? 
12  Are PPE properly handled and stored?       

         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 69 of 105 
 

17.5 Material handling 

         
Material Handling 
PROJECT : 
LOCATION :                                                                                                                      DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Material Handling  YES  NO  REMARKS 

Is safe method of lifting manually being followed by 
1       
the workmen? 

Are proper lifting accessories for manual handling 
2       
provided? 

Are personnel using body mechanics when lifting 
3       
and carrying? 

4  Are the workers lifting excess loads?       

Are the workmen using personal protective 
5       
equipments while handling materials? 

6  Are workmen trained in material handling?       

Are lifting and carrying accessories provided for 
7       
manual handling? 

Are workmen moving near moving machinery, pinch 
8       
points etc.. Where they may get injured? 

9  Are the workmen lifting excess weights?       

         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 70 of 105 
 

17.6 Material storage 
 
         
Material Storage 
PROJECT : 
LOCATION :                                                                                                                                   DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Material Storage  YES  NO  REMARKS 

1  Are materials stored in an orderly manner?       
Is proper flooring done with adequate load bearing 
2       
capacity? 
Is there adequate place for bulk storage of 
3       
construction materials? 
Is there proper access provided for removing/ storing 
4       
material? 
5  Are the stacks protected from collapse?       

Are stacking properly done with cross layers for bricks, 
6       
concrete blocks, cement bags etc..? 

7  Is material protected from weather and rain?       

8  Are adequate precautions taken against fire hazard?       

9  Are the projected ends properly protected?       

Are the contents of the containers properly identified 
10       
and labelled? 

11  Is there adequate ventilation?       
Are fire precautions tkaen where flammable materials 
12       
stored? 
         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 71 of 105 
 

17.7 Fire prevention & control 
 
         
Fire Prevention & Control 
PROJECT : 
LOCATION :                                                                                                                                   DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Fire Prevention & Control  YES  NO  REMARKS 
Is waste accumulating in hoist shafts, corners 
1       
etc…? 
Are waste bins provided at appropriate 
2       
locations? 
Are safe ash trays provided where smoking is 
3       
allowed? 

4  Are wet clothes kept near heaters for drying?       

5  Are any electrical circuits overloaded?       

6  Are flammable materials stored separately?       

7  Are there fire extinguishers available at site?       

Are the fire extinguishers suitable for the nature 
8       
of fire? 

Are the fire extinguishers placed near the source 
9       
of fire and are easily accessible? 

10  Is rubbish burnt in controlled manner?       

Is flame cutting and welding taking place with 
11       
proper fire precautions? 

Are all blow lamps and heating appliances being 
12       
used correctly? 
Is the site entrance always clear for fire engines 
13       
to get in? 

14  Are there trained persons to fight fire?       

15  Are there fire water and fire hoses at site?       

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 72 of 105 
 

17.8 Excavation 
 
         
Excavation & Trenching 
PROJECT : 
LOCATION :                                                                                                                 DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Excavation & Trenching  YES  NO  REMARKS 

1  Is method statement made for excavation?       
Are the position, depth and size of underground 
2       
structures and service lines clearly been identified? 
3  Is excavation permit taken where needed?       
Are the excavations sloped/ step back or shored 
4       
properly? 
Are the access /egress ladders /ramps/steps 
5       
properly provided? 
6  Is there a safe access provided for vehicles?       
Is the excavated material kept 1m away from the 
7       
edge of excavation? 
8  Is the excavation edge free from falling material?       

9  Are the excavations properly barricaded?       
Is heavy equipment operated only on stable 
10       
ground? 
11  Is dewatering done where needed?       
Are the excavation machineries identified and 
12       
inspected for proper working condition? 
Is there an accumulation of poisonous gases in the 
13       
pit? 
Is gas test done before allowing persons to enter 
14       
the pits? 
Are precautions taken against tipping of vehicles 
15       
into the pits? 
Are precautions taken against material falling on 
16       
the persons working in the pits? 
Are adequate precautions taken to prevent 
17       
workmen hitting against the vehicles? 
Are cross over bridges provided for every 20 ft 
18       
interval in case of long trenches? 
Are adequate precautions taken against electrical 
19       
hazards? 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 73 of 105 
 

20  Is there adequate lighting in case of night work?       

21  Are warning lights provided where necessary?       
Are the adjacent structures protected where 
22       
needed? 
Is the movement of vehicles controlled to prevent 
23       
earth collapse due to vibration? 
24  Is there any undercuts on the sides of excavation?       
Are the excavations frequently inspected for cracks 
25       
particularly after rains? 
Is the entry of water into the pits checked and 
26       
controlled? 
Are adequate precautions taken while removing the 
27       
timber, supports etc..? 

              
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 74 of 105 
 

17.9 SAFETY MEASURES FOR DEMOLITION OF STRUCTURES 

PROJECT : 
LOCATION :                                                                                                                 DATE : 
INSPECTION CONDUCTED BY : 
 

S. No                          Description  Yes     No   Remarks 


1  Are danger signs displayed all round the structure?       
2  Are barricades provided around the structure?       
3  Are two (2) exists provided for workmen to escape?       
4  Check whether red lights are provided around the       
barricades? 
5  Make sure there is no entry for trespassers       
6  Switch off  electric power and disconnect lines       
7  Prevent uncontrolled collapse of structure       
8  No demolition work after sunset       
9  Is sufficient place available for worker for carrying       
out demolition works? 
     10  Are sufficient personal protective equipment used       
by worker. e.g. Safety harnesses? 
     11  Are sufficient fire fighting equipment available at       
site during gas cutting? 
     12  Any other safety issues:       
 
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 75 of 105 
 

17.10 SAFETY CHECK‐LIST FOR SCAFFOLDINGS/LADDERS 

PROJECT : 
LOCATION :                                                                                                                 DATE : 
INSPECTION CONDUCTED BY : 
 

S. No  Description  Yes  No  Remarks 


1  Design tall scaffold       
2  Provide scaffold of sound material       
3  For tubular scaffold ,diameter should not be less       
than 48 mm and  wall thickness  less than 2.3 mm  
4  Check whether each scaffold is securely supported       
or suspended and properly strutted or braced 
5  Check whether  all scaffolds and  working platforms       
are securely fastened to the building or structure 
and braced or guyed properly 
6  Provide a regular plank stairway wide enough for 2       
persons to pass and provide hand rails on both 
sides 
7  The length of the ladders should not be more than       
4 meters 
8  Check for  fall of loose materials, bracings and other       
parts off scaffold  
9  Check whether  un‐ insulated electric wires exist       
near working platforms, gangway etc of a scaffold 
      10  Any other safety issues:       
 
 
 

                                                                                                         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 76 of 105 
 

17.11 Confined spaces 

         
CONFINED SPACE 
PROJECT : 
LOCATION :                                                                                             DATE : 
INSPECTION CONDUCTED BY : 
S.NO  CONFINED SPACE  YES  NO  REMARKS 
Is the confined space free from toxic gases 
1       
and oxygen deficiency? 
Is the confined space clear of contents and 
2       
well ventilated? 
3  Is there proper access for entry and exit?       
Is there any possibility of toxic gases/ 
4       
chemicals entering the confined space? 
5  Is gas test conducted?       
Is there sufficient oxygen(i.e.20%) in the 
6       
atmosphere? 
Are confined space entry procedures 
7       
followed? 
Is the confined space entry permit system 
8       
in place? 
Is the job done under the supervision of a 
9       
competent person? 
Are the workmen trained to work inside 
10       
confined space? 
Are they physically fit to work inside 
11       
confined space? 
12  Is there a proper rescue arrangement?       
Are the required rescue equipments 
13       
available? 
Is a register maintained to enter the names 
14  while entering and leaving the confined       
space? 

Are trained personnel waiting outside to 
15       
rescue the persons in case of emergency? 

Is there proper communication system for 
16       
the person working inside? 
         
 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 77 of 105 
 

17.12 Radiography 
 
         
Radiography 
PROJECT : 
LOCATION :                                                                                             DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Radiography  YES  NO  REMARKS 

Are there required permits from the 
1       
authorized person? 

Is the radiographer aware of the safety 
2       
precautions to be taken? 

Is the effective area cordoned off to a 
3       
particular distance? 

4  Is the radiographer using the following:       

  Collimeter       

  Radiation survey meter       

  Film badge       

  Pocket Dosimeter       

Is the radiographer having a valid license 
5       
from BARC? 

Is there valid documents for the movement 
6       
of the source? 

Is notice issued in advance to other agencies 
7       
working in the nearby areas? 

Is proper access provided for the location 
8       
where radiography being done? 

9  Is the source pit approved by BARC?       

         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 78 of 105 
 

17.13 Painting 

         
Painting 
PROJECT : 
LOCATION :                                                                                                                      DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Painting  YES  NO  REMARKS 

Are the painters using required PPEs like chemical 
1       
cartridge type mask, hand gloves etc..? 

2  Are there sufficient ventilations in the painting area?       

Are the fumes and gases affecting the other workers 
3       
in the surrounding area? 

Are the painting areas properly barricaded and 
4       
marked? 
Are the materials like thinners and paints stored in a 
5       
safe area? 
Is the area clear from sparking producing 
6       
equipments? 
         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 79 of 105 
 

17.14 Work at height 
 
         
Work at Height 
PROJECT : 
LOCATION :                                                                                                                                           DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Work at Heights  YES  NO  REMARKS 

  Ladders:       

Are the ladders checked and inspected before use and at regular 
1       
intervals? 

2  Are the defective ladders removed from site?       

Are the ladders placed as per safety requirement ie. At an angle of 
3       
75 degrees with the horizontal? 

4  Are the ladders secured properly?       

5  Is the ladder extending 1m above the landing step?       

6  Are the ladders properly stored?       

7  Are persons ascending and descending the ladder in a safe manner?       

8  Are the ladders obstructing the passages?       

9  Are the ladders likely to be hit by movement of persons/vehicles?       

  Scaffolds and working platforms:       

1  Are the scaffolds designed as per the load requirement?       

2  Are scaffolds erected under the supervision of a trained person?       

3  Are the scaffolding material suitable for the purpose?       

Are the scaffolds erected on level ground with proper sole boards 
4       
and base plates? 

5  Are the scaffolds plumb with adequate cross bracings?       

6  Are sufficient tie ins provided for the tower scaffolds?       

7  Are platform boards inspected and are in good condition?       

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 80 of 105 
 

8  Are the platforms fully boarded without openings?       

9  Are hand rails, mid rails and toe boards fixed for the platforms?       

10  Is there a proper access to reach the platforms?       

11  Are workers protected from falling objects?       

12  Is the base to height ratio maintained at 1:4?       

13  Are they inspected and tagged by competent person?       

14  Is the scaffold permit taken before using?       

15  Are red/green tags attached as per the conditions of the scaffolds?       

16  Are the castor wheels of mobile scaffolds properly locked?       

17  Are the mobile scaffolds stable?       

         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 81 of 105 
 

17.15 Electrical 
 
         
Electrical 
PROJECT : 
LOCATION :                                                                                                                   DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Electrical  YES  NO  REMARKS 
Is electrical installation made as per the load 
1       
requirement? 
2  Are the installations made of industrial type fittings?       
Is the installation suitable for the weather 
3       
conditions? 
4  Is the installation certified by licensed supervisor?       

5  Are ELCBs/ MCBs provided in the circuit?       
Are the distribution boards protected from rain and 
6       
water? 
7  Are the cables protected from mechanical damages?       
Are cables located at overhead positions with 
8       
sufficient head clearance? 
9  Are the joints on the cables lying on the ground?       
Are the cables lying on the ground causing trip 
10       
hazard? 
Are electrical equipment provided with proper 
11       
earthing? 
12  Are ELCBs and MCBs tested periodically?       
Are there single insulated electrical wires instead of 
13       
double insulated PVC cables? 
Are the insulations regularly inspected and records 
14       
maintained? 

15  Are lock out/tag out procedures followed?       
Are the accesses to the panels free from 
16       
obstructions? 
Are required fire extinguishers provided near the 
17       
electrical panels? 
Is there any artificial resuscitation charts displayed 
18       
near electrical panels? 
         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 82 of 105 
 

17.16 Hot work 
 
         
Hot work (Welding, Gas cutting and Grinding) 
PROJECT : 
LOCATION :                                                                                                                                DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Hot work (Welding, Gas cutting and Grinding)  YES  NO  REMARKS 

1  Are there damaged welding cables ?       

2  Are lugs used for cable connection?       

3  Are cables getting over heated, damaged?       

4  Are the cables creating tripping hazard?       

5  Are welding transformers properly earthed?       

Are power cables and welding cables protected from 
6       
mechanical damage? 
Are welders using welding hoods attached to safety 
7       
helmets? 
8  Are welders using required PPE?       

Are temporary screens provided to protect others from 
9       
welding rays, grinding sparks? 

Are fire precautions taken against falling of welding 
10       
sparks and spatters? 

Are gas cylinders stored properly in vertical position and 
11       
secured? 
Is there safe distance between and oxygen and 
12       
acetylene cylinders? 

Are gas cylinders provided with wall protection caps 
13       
when not in  use? 

Are the gas cylinders provided with flash back arresters 
14       
while using? 

15  Is gas starch with flash back arresters?       

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 83 of 105 
 

Is the area clear of combustible materials around gas 
16       
cylinder storage? 

Are fire extinguishers provided where welding, gas 
17       
cutting is in progress? 

  SHOT  BLASTING       
Is the air compressor tested and test certificate 
1       
available? 
2  Are the high pressure hoses in good condition?       

Are chains provided across the couplings of the high 
3       
pressure hoses to prevent whiping action? 

4  Is shot blaster using sand blasters hood?       

5  Is emergency stop valve provided?       

6  Are there any openings in the shot blasters shed?       

Are the workers provided with dust respirators when 
7       
they are exposed? 

         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 84 of 105 
 

17.1 7 Formwork 
 

PROJECT : 
LOCATION :                                                                                                                    DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Formwork/False work & Concreting  YES  NO  REMARKS 

1  Has the false work been designed by a competent person?       

2  Has the design been rechecked by the engineer concerned?       

Is there any change in the loading program after the design 
3       
approval? 
Is the horizontal lacking and diagonal bracing adequate to resist 
4       
lateral loading? 
Will there be any additional load on the false work due to plant 
5       
and storage of materials? 
Is the design capable of withstanding dynamic load due to dumping 
6       
loads, shock loads, surge loads, vibrations etc..? 

Are the foundations designed according to soil conditions, point 
7       
loads of verticals, water flooding etc..? 
Is the consideration given to horizontal forces from surge loads, 
concrete discharge from skips, expansion of concrete, non 
8       
verticality of supports, deflections of horizontal members, 
settlement of foundations etc…? 
9  Is there adequate access for the vehicles?       

10  Is there a proper electrical connection for the vibrators?       

11  Are the workers using PPE?       

12  Are they using Gum boots while working on wet concrete?       

13  Is there a proper access for concrete cutting?       

14  Are the workers using safety harness while stripping the forms?       

15  Is there a proper walkway provided over the reinforcement bars?       

16  Are the open edges properly barricaded?       

         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 85 of 105 
 

17.18 Fall prevention & protection 
 
         
Fall Prevention & Protection 
PROJECT : 
LOCATION :                                                                                                      DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Fall Prevention & Protection  YES  NO  REMARKS 
Is there a site specific fall protection plan in 
1       
place? 
Are workers trained in the fall protection 
2       
procedures? 

Are open edges and floor cut outs properly 
3       
barricaded? 

4  Are staircases provided with temporary railings?       

5  Are caution boards fixed at danger points?       

6  Are workers using full body harness?       

Have the workers anchored safety harness to a 
7       
strong anchoring point? 

Are lifelines provided where anchoring points are 
8       
not available? 

Are fall arresters provided while climbing rope 
9       
ladders? 

10  Are safety nets fixed where needed?       

11  Are sfety nets securely fixed?       

12  Are debris on the safety nets regulary cleaned?       

13  Are safety nets subjected to fire hazards?       

         

                   

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 86 of 105 
 

17.19 Hand tools 
 
         
Hand Tools & Power Tools 
PROJECT : 
LOCATION :                                                                                        DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Hand Tools & Power Tools  YES  NO  REMARKS 

Are the hand tools in good working 
1       
condition? 

2  Are they stored in a proper manner?       

3  Are damaged tools removed from use?       

4  Are appropriate tools available for the job?       

Are tools being used only for their proper 
5       
intended use? 

Are grinding machines provided with guards 
6       
over the wheels? 

Are the grinding wheels inspected for the 
7       
expiry date? 

Is ring test done for abrasive wheels before 
8       
fixing? 

Are the wheels suitable for the speed of the 
9       
machine? 

Are the power tools provided with earth 
10       
connection? 

11  Are the power tools handled properly?       

Are the handles of the tools free from splits 
12       
and cracks? 

Are there mushroomed heads over the 
13       
hammers, chisels and other impact tools? 

Are the edges for tooth of cutting tools kept 
14       
sharp? 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 87 of 105 
 

  PNEUMATIC TOOLS       

1  Is there misuse of compressed air?       

2  Is horseplay with compressed air forbidden?       

Are persons dusting their clothes with 
3       
compressed air? 

Are the joints in the air lines made with 
4       
purpose made connections? 
Are the pneumatic tools checked for faulty 
5  governors which may result in over       
speeding? 
Is air supply to the tool disconnected when 
6       
the tool is left unattended? 

         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 88 of 105 
 

17.20 Equipment fitness report for Vehicle and Equipment &Earth moving Equipment 

PROJECT : 
LOCATION :                                                                                                      DATE : 
INSPECTION CONDUCTED BY : 
 
Name of the site:                                                                                   Make/Model:                                          
Job. No:                                                                                                   Identification No:/Reg.No:                  
Date:                                                                                                        Asset code No (If applicable)               
Inspected by                                                                                           Owned by: 

S. No:  Check points  Observation  Remarks 


1.  Engine condition     
2.  Clutch/Brake     
3.  Hydraulic system     
4.  Guards/ Covers/ Doors     
5.  Fastener lock pins/Keys     
6.  Horn/Reverse horns/ Lights     
7.  Indicators/ Wiper blades     
8.  Operators fitness     
9.  Tyre pressure     
10.  Condition of battery/Lamps     
11.  Operating levers/  Steering     
12.  Gauges & Warning devices      
13.  Swing alarm provided     
14.  First‐aid box provided     
15.  Fire extinguisher provided     
The Vehicle/Earth moving equipment has been checked for above points and                                                              
Found fit for deployment                                     Found UNFIT for deployment 

     (P&M Engineer)                                                                                                (Site Safety Officer) 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 89 of 105 
 

17.21 Crane check list 

PROJECT : 
LOCATION :                                                                                                      DATE : 
INSPECTION CONDUCTED BY : 
Descriptio of Crane :                                                                                     Make: 
 
Registration No: 
 

S.No.  Check points  Observation      Remarks 


1  Hook and Hook Latch     
2  Over‐Hoist Limit Switch     
3  Boom Limit Switch     
4  Boom angle Indicator     
5  Boom‐Limit Cut off Switch     
6  Condition of Boom     
7  Condition of Ropes     
8  No. of Load Lines     
9  Size and Condition of the sling     
     10  Swing brake & lock     
     11  Propel brake & lock     
     12  Hoist brake and Lock     
     13  Boom brake and lock     
     14  Main clutch     
     15  Leakage in hydraulic cylinders     
     16  Out triggers fully extendable     
     17  Tyre Pressure     
     18  Condition of Battery and Lamps     
     19  Guards of moving and rotating parts     
     20  Load Chart Provided     
     21  No. and position of pendant ropes     
     22  Reverse Horn     
     23  Load Test Details     
     24  Swing alarm provided     
     25  Operator Fitness     
     26  First Aid box     

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 90 of 105 
 

     27  Fire Extinguisher in operator cabin     
       
This Crane has been Checked for the above points and, 

Found FIT for deployment                  Found UNFIT for deployment  

(Checked by P&M Engineer)                                                                               (Site Safety Officer) 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 91 of 105 
 

 17.22 SAFETY CHECK‐LIST FOR TOWER CRANES 

PROJECT : 
LOCATION :                                                                                                      DATE : 
INSPECTION CONDUCTED BY :                                                                    Type of Maintenance: Weekly          

Description: Tower Crane:                                                                           Crane No:                                                                                  
 
 

S. No  Check points  Inspection result  Remarks 


(Y/N) 
       OK/YES  Not   
OK/NO 
  Ropes:       
1  Rope condition       
2  Rope lubrication       
  Trolley:       
1  Trolley condition       
2  Trolley lubrication       
  Counter weight:       
1  Counter weight pin condition       
2  Counter weight  stability       
  Pins:       
1  Pins correctly located       
2  Split pins       
3  Check plates       
4  wear       
5  Boom pins       
  Crane structure(Deformation,       
Rust, Damage etc): 
1  Tower       
2  Boom       
3  Frame       
  Rope Sheaves and Wear pads:       
1  Condition       
2  Sheaves rotate       

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 92 of 105 
 

3  Wear pads/Rollers(Boom/Jib       
Protection) 
4  Rope keeper bar/ Plate on        
5  sheaves       
6  Bar clearance correct       
  Bolts:       
  Tower bolts:       
1  Bolts tightened       
2  Bolts of correct type       
  Slew Ring :       
1  Bolts tightened       
2  Bolts of same type       
3  Washers       
  Counter Weight:       
1  Fixed –will not sway       
2  Moving‐ Connecting bolts       
  Other Structural/Mech :       
1  Fluid leaks       
2  Hook‐latch       
3  Fixing angle deformation       
  Guarding(Accessible areas):       
1  Guards provided       
2  Guards fixed       
  Load Indicator  & Rated Capacity       
Limiter: 
1  Load indicator operational       
2  Load indicator calibrated       
3  Cut‐Off operates       
4  SWL displayed at main jib       
  Other Indicators:       
1  Radius Indicator       
2  Wind Indicator       
  Limit Switches:       
1  Hoist limit switch       
2  Trolley limit switch       

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 93 of 105 
 

3  Slewing limit switch       
4  Load limit switch       
5  Emergency  stop  switch       
  Crane cabin:       
1  Seating       
2  Visibility       
3  Noise       
4  Fire extinguisher       
  Load charts:       
1  Load chart provided       
2  Load chart displayed       
  Tower Access:       
1  Ladders       
2  Platforms for guardrail       
3  Hand rail pins       
  Boom/Jib access:       
1  Walkway       
2  Trolley platform       
  Communication:       
  Lightning Arrestor:       
1  Condition of earth cable       
2  Condition of earth resistance       
  Brakes:       
1  Trolley brake       
2  Hoist brake       
3  Swing brake       
4  Brake liner condition       
5  Air gap       
6  Gear Box:       
7  Trolley gear box       
8  Abnormal noise       
9  Oil level       
10  Any  oil leakages       
         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 94 of 105 
 

1  Specific Points noticed: 
 
 
 
 
 

(P&M Engineer)                                              (Plant Manager)                                          (Safety Officer) 

Note: 

1)  In ‘remarks ‘column details of activities carried out against each task with observations to be 
mentioned.  For ex:                                                                                                                                      

          Maintenance task‐ Grease water pump‐Remarks –Greased                                                        

          Maintenance task‐ Clean air cleaner element‐ Remarks –Cleaned                                                       

          Maintenance task‐ Check battery – Remarks – Checked, electrolyte level topped up,  

          Sp.gravity is…     

2) In ‘Specific points noticed’‐ mention any specific defect/damage/problem noticed during the   

 maintenance, which needs action for repair/rectification/replacement of parts.  

                                                                               

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 95 of 105 
 

17.23 BUILDERS HOIST CHECK‐LIST 

PROJECT : 
LOCATION :                                                                                                       
DATE : 
Registration No:                                                                                             Make: 
INSPECTION CONDUCTED BY : 
 
 

S. No  Description  Yes/No  Remarks 


1  Check for verticality of the hoist mast     
2  Is anchorage for the mast and supporting     
structure adequate? 
3  Is end mast piece is provided?     
4  Is over hoist limit switch working?     
5  Condition of ropes and diversion pulleys     
6  Is hoist position safe, free from falling material     
hazard? 
7  Is Winch platform strong, provided with hand rail     
& toe‐board? 
8  Is hoist break checked?     
9  Operator’s visibility to all unloading platforms     
and vice verse 
10   Are warning signals established& used?     
11  Is hoist protected from unauthorised operations?     
12  Is earthing provided?     
13  Are rotating parts of hoist adequately guarded     
including finger guard for bucket movement? 
14  Is ground level entry to winch area is restricted     
with wicket gate? 
15  Is protection against tripping hazards due to     
railing of ropes provided? 
16  Are signaling system functioning (Light & Bell)?     
17  Are daily check procedure followed?     
18  Check  operators fitness     
19  Are authorised operators are allowed all the     
time? 
20  SWL displays in terms of load, materials etc     
21  Restriction on the size &loading in the bucket     

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 96 of 105 
 

22  Any other safety issues:     
 

    P&M Engineer                                                                                         Signature of Safety Officer 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 97 of 105 
 

17.24 CHECK‐LIST FOR TRANSIT‐MIXER  

Description: Transit‐mixer                                                                        Type of Maintenance: Weekly               
Transit‐mixer No:                                                                                        Manufacturer name:                                                      
Transit‐mixer Model:                                                                                                              Date:                                                     
Description: Transit‐mixer(AL/TATA/STETTER‐AM‐6 SH) 

S. No  Maintenance Tasks         Remarks 


1  Check and adjust the valve tappet clearance       
2  Clean the complete fuel line and diesel tank       
3  Tight all the ‘U’ clamp bolts of leaf springs       
4  Check air intake line & gasket to turbo charger       
for leaks and rectify if any leak found 
5  Clean the breather of differential housing , gear       
box and engine 
6  Check the tyres for uniform wear & do wheel       
alignment if wear is uneven front  tyres 
7  Check steering mounting bolts/nuts and gear       
box mounting bolts 
8  Check the chassis cross members & side       
members for loose bolts 
9  Specific points noticed:       
 
 
 
 

(P&M Mechanic/Technician)                                                                                      (P&M Engineer) 

Note: 
1) In ‘Remarks’ column details of activities carried out against each tasks with observations to be 
mentioned for ex: 
Maintenance task‐Grease water pump‐Remarks –Greased 
Maintenance task –Clean air cleaner element –Remarks –Cleaned 
Maintenance task –Check battery –Remarks‐ Checked, electrolyte level topped up,      
Sp.gravity is…… 
 
2) In ‘Specific points noticed’‐ mention about any specific defect/damage/problem noticed 
during the maintenance which needs action for repair/rectification/ replacement of parts. 
 
 
                                                                          

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 98 of 105 
 

17.25 DIESEL GENERATOR (DG) INSPECTION CHECK‐LIST 

Project /Site name:                                                                                                 Inspected by:                                                       
Asset code:                                                                                                                              Date:                                                   

S. No.                Check points      Yes      No  Remarks 


1  Whether continuity and tightness of earth       
conductor are checked? 
2  Mention the gauge of earth conductor used       
3  Whether earth resistance is measured?       
4  Mention the earth resistance       
5  Is DG provided under shed/cover?       
6  Whether entry is restricted in to the DG       
room? 
7  Are cable trenches covered?       
8  Is insulation provided on the battery       
terminals? 
9  Is thermal insulation provided to the DG       
exhaust? 
10.  Whether stack height is maintained as per       
Environment requirements given in 
procedure manual? 
11  Whether DG exhaust is diverted outside the       
shed? 
12  Are all rotating parts of DG guarded       
(Coupling, Radiator fan)? 
13  Whether any leakage of fuel/oil beneath and       
around the DG? 
14  Whether DG surrounding area is free from       
flammable material? 
15  Whether fire extinguisher/fire buckets with       
dry sand are provided? 
16  Whether DG is fitted with acoustics and       
silencer insulations? 
 

(DG Operator)                                               (P&M Engineer)                                                     (Safety Officer) 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 99 of 105 
 

17.26 Motor Vehicles and Traffic 
 
         
Motor Vehicles and Traffic 
PROJECT : 
LOCATION :                                                                                                                                            DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Motor Vehicles and Traffic  YES  NO  REMARKS 

1  Are vehicles inspected and the license is current?       

2  Are there broken windshields or lights?       

3  Are seat belts provided and are in use by the users?       
Do brakes, reverse alarms and horns etc… are in good 
4       
working condition? 
5  Are all operators and drivers have valid licenses?       

6  Are speed limit boards displayed at site?       

7  Are the movements of vehicles controlled?       
Are workers travelling on the body of the vehicles or 
8       
passengers travelling in drivers cabin is not allowed? 
9  Are workers riding on loaded trucks?       

10  Are persons boarding or alighting moving vehicles?       

11  Are parking brakes applied when vehicles not in use?       

12  Are wheels chocked when parked on inclined grounds?       
Are the vehicles properly covered while carrying loose 
13       
materials/ 
  TYRES       
Are adequate precautions taken while removing damaged 
1       
wheels and detachable flanges etc…? 
Is the inflation of tyres done by trained persons and the 
2       
tyres are kept in tyre cages? 
Is the tyre pressure maintained at manufacturers 
3       
recommendations? 
4  Are the servicing ramps properly designed for the purpose?       

5  Is there suitable access to get in and get out of the pits?       

6  Are the pits properly barricaded when not in use?       

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 100 of 105 
 

17.27Plant & Mobile equipment 
 
         
Plant & Mobile Equipment 
PROJECT : 
LOCATION :                                                                           DATE : 
INSPECTION CONDUCTED BY : 
S.NO  Plant & Mobile Equipment  YES  NO  REMARKS 

1  Are the moving parts guarded?       

2  Are the operators trained?       
Are the machineries maintained in good 
3       
condition? 
Are the workers protected from noiseand 
4       
fumes? 
5  Are concrete mixers set on firm ground?       
Is there adequate space around the 
6       
machinery? 
Are the bull dozer blades, scraper blades, 
7  end load buckets etc… lowered when       
repaired? 
  OTHER MACHINERIES       
  COMPRESSORS AND AIR RECEIVERS       
Are they examined and tested by a 
1       
competent person? 
Are the V‐belts and pulley drives well 
2       
guarded? 
Are the air receivers marked with safe 
3       
working pressure? 
Are they fitted with safety valve, pressure 
4       
gauge and drain cock? 
  DRILLING MACHINES       
Are the bench mounted drilling machines 
1  firmly secured to a strong and stable       
bench? 
2  Is the bench firmly fixed to the floor?       
Is correct chuck key used and not left in 
3       
the chuck? 
4  Is small work piece held in vice or clamp?       

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 101 of 105 
 

Are operators wearing loose clothing and 
5       
gloves etc.. while operating the machine? 
Are the operators contained their long 
6  hair in a net or cap to eliminate the risk of       
entanglement? 
  GRINDING MACHINES       

1  Are the wheels adequately guarded?       
Are precautions taken against flying 
2       
fragments of disintegrated wheel? 
Are the wheels fitted as per the designed 
3  speed and correctly fitted on the spring       
wheel? 
Is the rpm clearly marked on the 
4       
machine? 
Is the surrounding area kept neat and tidy 
5       
and free of obstructions? 
Are the operators using PPE to protect 
6       
against flying particles? 
Is the gap between the wheel and the job 
7       
rest properly adjusted? 
  WOOD WORKING MACHINES       

1  Is there guard over the circular saw?       

2  Is the guard in place while working?       
Is a riving knife provided to prevent kick 
3       
back? 
4  Is the operator using a pust stick?       
Is the area around the machine neat and 
5       
tidy? 
Are the wooden shavings, dust and chips 
6       
regularly cleared? 
7  Is there good ventilation?       

8  Is the operator using required PPE?       

         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 102 of 105 
 

17.28 Housekeeping 
 
         
 HOUSE KEEPING 
PROJECT : 
LOCATION :                                                                                                                      DATE : 
INSPECTION CONDUCTED BY : 
S.NO  House Keeping  YES  NO  REMARKS 

1  Is the site kept neat and tidy?       

Is there a proper arrangement for regular collection 
2       
and disposal of waste materials? 

3  Are walkways clearly defined and unobstructed?       

4  Are materials and equipments stored properly?       

5  Is local scrap yard provided?       

6  Are there any projecting nails on the timbers?       

Is adequate lightings provided for work areas and 
7       
passages? 

8  Are the toilets regularly cleaned?       

9  Is there adequate water supply for sanitation?       
Are the upstanding rebar, pegs protected from fall 
10       
hazard? 

Is there an easy access to Electrical control panels, 
11       
Fire extinguishers, First Aid boxes etc…? 

         

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 103 of 105 
 

18. Project Safety Documents 

18.1‐List of Project Safety Documents maintained by CBRE 

Checked 
Safety Documents  Generated  Maintained  (document) & 
Permitted 

Daily inspections          
Check list  CBRE  CBRE    
Intimation cards  CBRE  CBRE    
Incident records and investigation register  CBRE  CBRE    
Accident record and investigation record  CBRE  CBRE    
Safety committee – Agendas & MOM  CBRE  CBRE    
PPE register (CBRE indents, consumptions & rejection)  CBRE  CBRE    
Test certificates of tools and tackles  Contractor  CBRE    
Inspection & maintenance register for tools & tackles  Contractor  CBRE    
Training  CBRE  CBRE    
Work permits  Contractor  CBRE  CBRE 
ELCB test record register  Contractor  Contractor  CBRE 
Electrical hand tools inspection & maintenance register  Contractor  Contractor  CBRE 
Diesel generator / substation log book  Contractor     CBRE 
Safety Audits  CBRE  CBRE    
Authorized personnel  Contractor  CBRE  CBRE 
Method statements including risk assessment  Contractor  CBRE  CBRE 
Equipment commissioning record  Contractor  Contractor  CBRE 
Firefighting equipment record  Contractor  Contractor  CBRE 
First aid registers.  Contractor  Contractor  CBRE 

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 104 of 105 
 

18.2‐List of Welfare Documents required for Inspection 

• Copies of relevant licenses 

• Wage register 

• Muster roll 

• Overtime register 

• Payment register 

• Advance register (Client to contractor to sub contractor) 

• Fines register 

• Inspection book containing issue of employment cards wages slips 

• Copies of abstract of relevant statutes  

Issue Date: December, 2008                                                                                                              Rev: 2                                     
Page 105 of 105 

Das könnte Ihnen auch gefallen