Beruflich Dokumente
Kultur Dokumente
MM MM M
Foundation (a)Abutmant Vertical
1 piles for two(2) Abutment 1 20.00 _ 20 13.80
mainbar
Vertical
25.00 _ 12
mainber
1.00 Binders 10.00 250 49 6.59
10.00 100 16
Total=
pressure
1.00 16.00 _ 10 6.59
ring
8 300 16 8.90
Total=
1
20 125 34 10.65
Total=
Total=
Bar around
1 12.00 _ 3 13.718
the faces
12.00 _ 3 13.718
Total=
Total reinforcrme
2.Substructure _
(a)Abutment shaft 1 Verticel main 25 2*57=114 5
2
_
verticel side 16 2*10 5
stirrup 57 2.8
Total=
_
1 top bar 1 8 9.35
_
1 Bottom bar 16 8 9.35
Total=
Total=
Horizantal(e/
2 f) 12 120 62 1.3
Triangular
2 postion 12 120 2*22=44 2.55
Total=
Horizantal
2 Bar 10 150 50 1.3
Trangular
2 postion 10 150 36 2.55
Total=
Top Bar
2 (Return wall) 20 150 4 4
3
2 Bottom Bar 16 - 4 4.5
Vertical Bar
Dirt Wall 2 (W/F) 10 150 114 3.65
Vertical Bar
(E/F) 16 120 142 3.65
Binders 10 150 40 8.94
Tota
Total reinforcrment for two abutm
Vertical main
Pier Shaft 1 Bar 25
- 66 5
Side Bar 16 - 16 5
92 1
Total=
Topbar 16 - 16 7.80
Mainbar 12 - 16 7.8
Total reinforcrment for Pier Shaft and Shaft
4
Padestal 12 Four (one)
Vertical main
Bar 12 100 30 1
Mesh 8 - 2 5.70
2 5.92
Total=
Vertical 12 - 20 1
Stirrups 10 - 2 2
5
TOTAL
QTY
M Kg/M Kg Mt.
0.00 3.85 0
0.00 0.62 0
Total =
944.3974 0.944
346.000
0.000
415.170
0.000
Total =
1216.1474 1.216
132.000
142.400
429.100
6
TOTAL
QTY
362.100
361.670
308.850
41.154
41.154
0.000 3.85 0
3.668
total = 3668.25572
Total reinforcrment in two abutment 2 x 6.126 7.33651144
3.85 0
41.154 0.89 36.62706
41.154 0.89 36.62706
765.000 0.62 474.3
Total = 3711.31172 3.711
Total reinforcrment in Foundation 35.887
7
TOTAL
QTY
50 1.58 79.00
159.6
159.6
74.8
74.8
210.56
126
80.6
112.2
45.6
65.00
91.80
38.00
8
TOTAL
QTY
230.00
92.00
9
TOTAL
QTY
11.40
11.84
23.24 0.39 9.06
35.76
12 x 35.76 429.120 0.429
10
Bar
Sl Total No Identificatio Di.a of Bar Spacing No.s of Length of
Particulars
no n & Type Bar each bar
MM MM M
Foundation (a)Abutmant Vertical
1 piles for two(2) Abutment 1 20.00 _ 20 17.80
mainbar
Vertical
25.00 _ 12
mainber
1.00 Binders 10.00 250 67 3.14
10.00 100 16
Total=
pressure
1.00 16.00 _ 12 3.14
ring
8 300 16 8.90
Total=
20 125 34 10.65
11
Total=
Total=
Bar around
1 12.00 _ 3 13.718
the faces
12.00 _ 3 13.718
Total=
Total reinfor
2.Substructure _
(a)Abutment shaft 1 Verticel main 20 100 4.82
12
_
verticel side 16 10 4.82
Total=
_
1 top bar 16 8 9.1
_
1 Bottom bar 16 8 9.1
Total=
Total=
Horizantal(e/
2 f) 10 200 6 3.98
Triangular
2 postion 10 200 20 2.84
Vertical
2 al(e/f) 10 200 36 2.07
Total=
13
Total Dirt Wall Reinforceme
Total reinforcement for two abutmen
Vertical main
Pier Shaft 1 Bar 20
- 40 4.17
12 __ 2 1.85
Total=
Topbar 16 - 15 6.00
Mainbar 16 - 15 6
Total reinforcrment for Pier Shaft and Shaft
Mesh 8 - 2 5.70
14
2 5.92
Total=
Vertical 12 - 20 1
Stirrups 10 - 2 2
15
TOTAL
QTY
M Kg/M Kg Mt.
0.00 3.85 0
0.00 0.62 0
Total =
1049.4452 1.049
396.000
0.000
229.220
0.000
Total =
1179.7708 1.180
132.000
142.400
429.100
362.100
16
TOTAL
QTY
361.670
308.850
41.154
41.154
0.000 3.85 0
3.668
total = 3668.25572
Total reinforcrment in two abutment 2 x 3.668 7.33651144
3.85 0
41.154 0.89 36.62706
41.154 0.89
36.62706
765.000 0.62 474.3
Total = 3711.31172 3.711
Total reinforcrment in Foundation 37.277
482.000
2.47 1190.54
17
TOTAL
QTY
48.200
1.58 76.156
346.500
0.62 214.83
529.200
0.39 206.388
156.800
19.400
72.800
4149.56 4.150
32.460
19.476
23.880
0.62 14.8056
56.800
0.62 35.216
74.520
0.62 46.2024
12.300
1.58 19.434
647.52416 0.648
119.110
0.62 73.8482
135.730
0.89 120.7997
195.800 0.62 121.396
18
TOTAL
QTY
Total Dirt Wall Reinforcement = 632.0878 0.632
Total reinforcement for two abutment = 5429.172 5.429
66.72 1.58
45.90
3.70
11.40
19
TOTAL
QTY
11.84
23.24 0.39 9.06
35.76
6 x 35.76 214.560 0.215
20
Bar
Sl Total No Identificatio Di.a of Bar Spacing No.s of Length of
Particulars
no n & Type Bar each bar
MM MM M
Foundation (a)Abutmant Vertical
1 piles for two(2) Abutment 1 20.00 _ 20 22.45
mainbar
Vertical
25.00 _ 12 17.95
mainber
1.00 Binders 10.00 250 73 3.20
Total=
pressure
1.00 16.00 _ 12 3.2
ring
8 300 16 8.90
Total=
21
25 150 30 11.6
Total=
Total=
Bar around
1 12.00 _ 5 12.8
the faces
12.00 _ 5 12.8
Total=
1 Binders 10 _ 8 30
Total reinforcrme
2.Substructure _
(a)Abutment shaft 1 Verticel main 25 2*57=114 5
_
verticel side 16 2*10 5
22
1 Binders 10 150 19*2=38 10.45
stirrup 57 2.8
Total=
_
1 top bar 1 8 9.35
_
1 Bottom bar 16 8 9.35
Total=
Total=
Horizantal(e/
2 f) 12 120 62 1.3
Triangular
2 postion 12 120 2*22=44 2.55
Total=
Horizantal
2 Bar 10 150 50 1.3
Trangular
2 postion 10 150 36 2.55
Total=
Top Bar
2 (Return wall) 20 150 4 4
2 Bottom Bar 16 - 4 4.5
Vertical Bar
Dirt Wall 2 (W/F) 10 150 114 3.65
23
Vertical Bar
(E/F) 16 120 142 3.65
Binders 10 150 40 8.94
Tota
Total reinforcrment for two abutm
Vertical main
Pier Shaft 1 Bar 25
- 66 5
Side Bar 16 - 16 5
92 1
Total=
Topbar 16 - 16 7.80
Mainbar 12 - 16 7.8
Total reinforcrment for Pier Shaft and Shaft
24
Vertical main
Bar 12 100 30 1
Mesh 8 - 2 5.70
2 5.92
Total=
Vertical 12 - 20 1
Stirrups 10 - 2 2
25
TOTAL
QTY
M Kg/M Kg Mt.
Total =
2155.344 2.155
287.400
239.400
252.800
51.200
Total =
1550.348 1.550
132.000
142.400
511.200
26
TOTAL
QTY
348.000
511.200
348.000
64.000
64.000
6.126
total = 6126.172
Total reinforcrment in two abutment 2 x 6.126 12.252
50 1.58 79.00
27
TOTAL
QTY
159.6
159.6
74.8
74.8
210.56
126
80.6
112.2
45.6
65.00
91.80
38.00
28
TOTAL
QTY
230.00
92.00
29
TOTAL
QTY
11.40
11.84
23.24 0.39 9.06
35.76
12 x 35.76 429.120 0.429