Beruflich Dokumente
Kultur Dokumente
Revision History
Amendment Revision Amender Initials & Job Amendment
Date Number Title
Related Documents
Document Number Document Name
HSE-SAF-PRO-0004 Work Permit System Procedure
HSE-SAF-PRO-0005 Confined Space Procedure
HSE-SAF-PRO-0006 Energy Isolation Procedure
HSE-SAF-PRO-0023 Safety Standard Variance Procedure
HSE-SAF-PRO-0033 Appointed Persons Procedure
VOP-1232 Hot Tap Procedure
Document Roles
Role Name Job Title
Reviewer Benny Rahadian Ops Safety Manager
Nanang Wasis/Sapto Deputy VP Ops
R. Affan
Approver Agus Dewandono VP Operations
Muhammad Sodiqin VP HSE&OI
Vania De Stefani VP Technical Support
Cahyono Edy Engineering Authority
Prasetyo
Consulted Lloyd Clift OEMS Specialist
Irwan Hardiyanto Centralized Safety Manager
Fauzan Rachman Technical Support Safety Manager
Siswanto Electrical TA
Arief Rahman Instrumentation & Control TA
Thanura
Informed
Hot Work Procedure
Prosedur Pekerjaan Panas
OPS-PRO-0004
Overview 5 Pendahuluan 5
1. Introduction 5 1. Pengenalan 5
2. Scope 7 2. Cakupan 7
4. Definition 14 4. Definisi 14
5. Application 18 5. Aplikasi 18
8. VICO Naked Flame Practice – Basic Rules 19 8. Penerapan Api Terbuka VICO – 19
Peraturan Dasar
9. Naked Flame Mandatory Precautions 22
9. Pencegahan Wajib Api Terbuka 22
10. Hot Work At Night 23
10. Pekerjaan Panas di Malam Hari 23
11. Hot Work Challenge 23
11. Penilaian Pekerjaan Panas 23
12. Training and Competence 24
12. Pelatihan dan Kompetensi 24
13. Work Pack Hot Work Naked Flame 25
13. Paket Kerja Pekerjaan Panas Api 25
14. Equipment Standards and Location 25 Terbuka
15. Vehicle Entry 26 14. Peralatan Standard dan Lokasi 25
16. Emergency Preparedness for Hot Work 27 15. Kendaraan Masuk 26
Naked Flame
16. Persiapan Tanggap Darurat untuk 27
17. Hot Work Naked Flame Habitat 28 Pekerjaan Panas Api Terbuka
18. Remove Flammable and Combustible
34 17. Habitat Pekerjaan Panas Api Terbuka 28
Substance
18. Menghilangkan Bahan Mudah
19. Permit to Work 35 34
Terbakar
21. Mandatory Precautions During Hot Work 37 20. Kontrol Lokasi Kerja 37
22. PPE 38 21. Pencegahan Penting Selama Pekerjaan 37
Panas
23. Stopping the Job 39
22. APD 38
Appendix 41
23. Menghentikan Pekerjaan 39
Lampiran 41
Overview Pendahuluan
The purpose of this Hot Work Procedure is as Tujuan dari prosedur Pekerjaan Panas ini adalah
a detailed guide for the preparation, testing, sebagai panduan detil untuk persiapan,
and control of Hot Work Activity. Preparation pengujian, dan pengendalian Kerja Panas.
Hot Work requires knowledge of the sources Persiapan Pekerjaan Panas yang aman
and combustible materials properties and membutuhkan pengetahuan sumber dan
operating conditions that may affect properti bahan mudah terbakar dan kondisi
workplace conditions. Hot Work is a job with a operasi yang dapat mempengaruhi kondisi
high risk, especially in areas with exposure to tempat kerja. Pekerjaan Panas merupakan
hydrocarbons. Introducing any ignition source pekerjaan dengan resiko tinggi terutama di area
in hazardous (classified) areas and live dengan paparan hidrokarbon. Membuat sumber
hydrocarbon operations increases the level of pembakaran apapun di area berbahaya
risk to people, process and plant. The (terklasifikasi) dan operasi hidrokarbon
management and control of hot work is meningkatkan resiko kepada pekerja, proses,
important because VICO operational sites dan kilang. Manajemen dan control pekerjaan
have, in accordance with relevant industry panas penting karena lokasi operasional VICO,
and regulatory standards, designed and berkenaan dengan industri terkait dan regulasi
identified hazardous areas where combustible standard, desain, dan area berbahaya
gases, liquids or other materials are or could teridentifikasi dimana gas, cairan, atau material
be present. mudah terbakar ditemukan.
1. Introduction 1. Pengenalan
1.1. Hot Work (HW) is a task or activity that 1.1. Pekerjaan Panas adalah suatu kegiatan
involves the use or creation of an open atau pekerjaan yang melibatkan
flame, spark or energy discharge that penggunaan atau menghasilkan api
could act as a potential ignition source terbuka, percikan atau pelepasan energi
that may cause a fire and/or explosion. yang bisa berpotensi sumber pembakaran
Some of ignition source that may not be yang menyebabkan kebakaran dan/atau
seen are ignition from vehicle, electrical ledakan. Beberapa sumber panas yang
powered tools, or battery powered tools, mungkin tidak terlihat adalah ignisi dari
etc, therefore it is mandatory to kendaraan, alat dengan tenaga listrik atau
prepared all precaution mentioned in this alat dengan tenaga baterai, dsb, maka dari
Hot Work Procedure. itu penting untuk membuat semua
pencegahan potensi percikan tersebut
dangan Prosedur Pekerjaan Panas ini.
1.2. The VICO policy relating to hot work 1.2. Kebijakan VICO berkaitan dengan aktifitas
naked flame activities in hazardous areas pekerjaan panas api terbuka di area
is that it shall be avoided and only berbahaya harus dihindari dan hanya
carried out when all other alternatives dilaksanakan ketika semua alternative
have been totally exhausted. tidak bisa dilakukan.
1.3. When such work is unavoidable it is 1.3. Ketika pekerjaan tersebut tidak dapat
necessary that the activity is planned to dihindari, penting bahwa aktifitas
ensure that the residual risk is AS LOW AS direncanakan untuk memastikan residu
REASONABLY PRACTICAL. The following resiko AS LOW AS REASONABLY
shall be addressed: PRACTICAL. Hal berikut ini harus
dilakukan:
1.3.1.Hot Work Challenge completed, 1.3.1.Hot Work Challenge diselesaikan,
recording management justification mencatat pembenaran untuk
for permitting naked flame work, memungkinan pekerjaan api terbuka,
(Ref Hot Work Challenge Form (Ref Form Hot Work Challenge di
included as Appendix 1). Lampiran 1).
1.3.2.Potential sources and magnitude of 1.3.2.Sumber berpotensi dan besarnya
any hydrocarbon release are pelepasan hidrokarbon diidentifikasi,
identified, and if required, systems dan jika dibutuhkan, shut down
shut down, depressurized, system, depresurize, flush/purge dan
flushed/purged and isolated in isolasi sesuai dengan pedoman
accordance with the guidelines in kebijakan ini, area semacam itu bebas
2. Scope 2. Cakupan
2.1. Hot Work (Naked Flame) includes but not 2.1. Pekerjaan Panas (Api Terbuka) termasuk
terbuka di lapangan
3.2. Area Authority 3.2. Area Authority
Area Authorities has responsibility and Pengawas daerah memiliki tanggung
accountability for hot work in their area, jawab dan tanggung gugat terhadap
such as : pekerjaan panas di areanya seperti :
3.2.1.Ensure hot work challenge form is 3.2.1.Pastikan form Hot Work Challenge
3.2.2.Inspect work site prior to job and at 3.2.2.Inspeksi lokasi kerja sebelum dimulai
least once per day during work. setidaknya sekali dalam sehari selama
pekerjaan.
3.2.3.Ensure suitable habitat in place and 3.2.3.Pastikan habitat yang sesuai dibuat
flood) & that hydrocarbon systems system (vent, drain, purge, flush,
3.2.5.Ensure area clean and free from 3.2.5.Pastikan area bersih dan bebas dari
materials. terbakar.
3.2.6.Tanda dan pembatas didirikan.
3.3.1.Inspect work site prior to job and at 3.3.1.Inspeksi lokasi kerja sebelum dimulai
least twice per day during work setidaknya dua kali dalam sehari
area. Strictly control all other work area aman. Kontrol dengan ketat
inside & outside the habitat, di luar habitat, usahakan juga untuk
consider need for running out and menggelar selang pemadam api dan
place.
3.4.9.Ensure hot work permit reviewed 3.4.9.Pastikan ijin kerja diitinjau ulang
and revalidated every 12-hrs or at setiap 12 jam atau pergantian shift.
every shift change.
3.4.10. Lead Toolbox Talk every shift - 3.4.10. Memimpin TBT setiap shift –
brief personnel & confirm memastikan pemahaman pekerja
understanding of procedures/risk akan prosedur/penilaian
assessment/ mitigations. resiko/mitigasi.
3.4.11. Ensure full compliance with 3.4.11. Memastikan kepatuhan terhadap
permit and procedures throughout permit dan prosedur selama
the job. pekerjaan.
3.5. Welder 3.5. Pengelas (Welder)
3.5.1.Physically performing work under 3.5.1.Melakukan pekerjaan dibawah
direction of performing authority. arahan Pangawas Pelaksana.
3.5.2.Stop work if conditions change from 3.5.2.Hentikan pekerjaan jika kondisi
those specified in procedure/ PTW. berubah dari prosedur/Ijin Kerja.
3.5.3.Ensure nothing smoldering/ burning 3.5.3.Pastikan tidak ada sisa api yang
near worksite on completion of the menyala setelah menyelesaikan
work. pekerjaan.
3.6. Fire Watcher 3.6. Fire Watcher
3.6.1.Remain on station during the job 3.6.1.Tetap berada di tempat selama
and for 30 minutes after pekerjaan dan 30 menit setelah
completion. pekerjaan.
3.6.2.Trained and competent in use of fire 3.6.2.Terlatih dan kompeten dalam
extinguishers. Ensure equipment penggunaan pemadam api.
available at worksite. Memastikan peralatan tersedia
dilokasi.
4. Definitions 4. Definisi
4.1. Potentially Hazardous Area - Any area 4.1. Area Berpotensi Bahaya – area apapun
where hydrocarbons or flammable dimana ada hidrokarbon atau material
4.2. Hot Work Naked Flame – is any task that 4.2. Pekerjaan Panas Api Terbuka - segala
4.4. Level 2 Risk Assessment – risk 4.4. Penilaian Resiko Level 2 - proses penilaian
competent people who understand the kompeten yang mengerti tugas dan
task and jobsite hazards. It includes bahaya dari pekerjaannya. Bisa melibatkan
kontraktor atau vendor jika memang
contractor or vendors as appropriate.
diperlukan.
4.8. Class I locations - are those in which 4.8. Lokasi Class 1 - adalah lokasi dimana
flammable gases or vapors are or may be flammable uap atau gas mungkin hadir di
present in the air in quantities sufficient udara dalam jumlah yang cukup untuk
to produce explosive or ignitable menghasilkan campuran mudah meledak
mixtures. Class I locations include the atau mudah terbakar. Lokasi Class I
following: meliputi:
5. Application 5. Aplikasi
5.1. This practice applies to any naked flame 5.1. Penerapan ini berlaku untuk semua
and spark potential hot work in pekerjaan panas api terbuka dan potensi
potentially hazardous areas within VICO, percikan di area berpotensi bahaya di
including all operating facilities, all VICO, termasuk semua fasilitas operasi,
drilling and work over rigs, and on semua drilling dan workover rigs, dan
construction projects affecting these proyek terkait dengan fasilitas ini.
facilities. 5.2. Penerapan ini juga berlaku dimana
5.2. The practice also applies to areas where pekerjaan panas dilakukan di kantor atau
hot work is required in offices and workshop, tetapi bukan workshop yang
compliance to VICO Safety procedures shall ketaatan dengan prosedur keselamatan VICO
apply. As a minimum, reference shall be made harus diterapkan. Sebagai minimum, referensi
to the following safe work practices: berikut ini dipakai untuk penerapan bekerja
aman :
6.1. Permit to Work 6.1. Ijin Kerja
6.2. Energy Isolation 6.2. Isolasi Energi
6.3. Confined Space Entry 6.3. Masuk Ruang Terbatas
6.4. Task Risk Assessment 6.4. Penilaian Resiko Kerja
Flame hot work tasks across VICO operations : pekerjaan panas api terbuka di seluruh operasi
VICO :
8.1. For all jobs located on an 8.1. Untuk semua pekerjaan di dalam
installation/Site/Rig Site where cold instalasi/lapangan/lokasi rig dimana
venting may take place, dispersion terdapat venting perhitungan dispersi
calculations shall be conducted to define harus dilakukan untuk menentukan zona
an exclusion zone where hot work can dimana pekerjaan panas tidak boleh
not take place with continued dilakukan bersamaan dengan operasi.
(simultaneous) operations. The Process Process Safety TA bisa membantu dalam
Safety TA can assist in this calculation. perhitungan tersebut. Didalam zona
Inside of this exclusion zone, the process pengecualian ini, proses atau system yang
or system creating the risk shall be memberikan resiki harus di shut down,
shutdown, vented/drained, vent/drain, purge/flush dan isolasi
purged/flushed and subject to positive positive.
isolation.
8.2. For any naked flame work on gas systems 8.2. Untuk pekerjaan api terbuka pada system
or flare lines, the lines shall be shutdown, gas atau jalur flare, jalurnya harus
vented/drained, N2 purged or water dimatikan, vent/drain, N2 purge atau diisi
filled and flushed and subject to positive air dan dibilas dan diisolasi positif. Sebagai
isolation. For example: welding patches contoh: pengelasan tambal di gas line,
on live gas lines, tacking supports to flare penyambungan support ke jalur flare.
lines. However there are special cases Namun, ada kasus khusus dimana
where there is an operational need to pengoperasian membutuhakan
install a weld-o-let for hot tapping pembuatan weld-o-let untuk kebutuhan
purposes. In these cases, all of the hot tap. Pada kasus ini, semua kondisi
conditions defined in the Hot Tapping yang disebutkan pada penerapan Hot
practice will be implemented. Tapping akan diimplementasikan.
8.3. For any naked flame work on 8.3. Untuk pekerjaan panas api terbuka pada
hydrocarbon systems where containment system hidrokarbon dimana containment
has been broken (e.g. cutting and telah dibuka (cth. Pemotongan dan
welding a flange on an existing line, pengelasan flange pada pipa yang ada,
internal vessel repairs), the system shall perbaikan internal vessel), system harus di
be vented/drained N2 and/or water vent/drain N2 dan/atau bilas dengan
washed flushed/purged and positively air/purge dan isolasi positif. Single dan
isolated. Single and double block valves double block valve dengan vent bukanlah
with vent are not positive isolation isolasi positif. Permukaan harus
means. Surfaces shall be degreased and dibersihkan dari sisa minyak dan
consideration given to the installation of mempertimbangkan pemasangan
secondary barriers such as plugs or pelindung kedua seperti plug atau bladder
bladders to enhance the security of the untuk menambah keamanan dalam
job. bekerja.
8.4. For work on live oil systems – e.g. hot 8.4. Untuk pekerjaan dalam system minyak –
taps, installation of patches or sleeves, cth. Hot tap, pemasangan tambal –
seal welding of couplings - an penilaian teknis pekerjaan harus
engineering assessment of the task shall dilakukan. UT memeriksa dan
be conducted. UT checks and issue of an mengeluarkan sertifikat dibutuhkan
approved of a flow certificate will be sebelum mempertimbangkan pekerjaan
necessary before the work will be (merujuk pada VOP-1232 Prosedur Hot
considered (refer to VOP-1232 Hot Tap Tap).
Procedure).
8.5. For all naked flame work, the mandatory 8.5. Untuk semua pekerjaan api terbuka,
naked flame precautions contained in semua pencegahan yang ada di dalam
this procedure shall be adhered to AT ALL prosedur ini harus ditaat SETIAP WAKTU.
TIMES.
8.6. Where naked flame work is to be 8.6. Dimana pekerjaan panas api terbuka
performed at a location with no fire dilakukan pada lokasi tanpa ada pompa
pumps, a fire fighting team with Portable pemadam api, tim pemadam api dengan
extinguisher or fire truck will be APAR atau truk pemadam api harus
9.1. Any naked flame hot work carried out persyaratan pekerjaan dilakukan sesuai
will require that the job is conducted in dengan pedoman berikut, yang dianggap
accordance with the following guidelines, sebagai persyaratan minimum untuk bisa
requirements to proceed.
9.2. The justification for any changes of these 9.2. Pembenaran untuk perubahan dari
satisfied in any naked flame task: setiap pekerjaan panas api terbuka :
9.3.5.Actions & precautions in place that 9.3.5.Aksi dan pencegahan telah dilakukan
will mitigate risks and ensure safe untuk mitigasi resiko dan memastikan
execution. eksekusi yang aman.
the review and justification as to why the meresmikan pembenaran dan penilaian
job cannot be performed by alternative bahwa pekerjaan tidak dapat dilakukan
means dengan alternative lain.
11.3. A hot work challenge approval 11.3. Persetujuan formulir Penilaian
form attached as Appendix 1 shall be Pekerjaan Panas terlampir di Lampiran 1
completed and signed off by the VP harus dilengkapi dan ditandatangani oleh
Ops/VP TS prior to any naked flame work VP Ops/VP TS sebelum melakukan
being conducted at Area 1 and Area 2. pekerjaan panas api terbuka di area 1 dan
area 2.
11.4. The hot work challenge for 11.4. Penilaian pekerjaan panas untuk
specific project shall be completed only proyek tertentu hanya perlu dilengkapi
once prior to project commencement sekali di awal proyek selama lingkup
with detail hot work scope already pekerjaan panas telah terdeskripsikan
clarified in work dossier. Any additional secara detil di dalam Dokumen Kerja.
hot work scope is a subject to additional Penambahan lingkup pekerjaan panas
hot work challenge. perlu mendapat Penilaian pekerjaan panas
baru.
13.Work Pack Hot Work Naked Flame 13.Paket Kerja Pekerjaan Panas Api
Terbuka
13.1. A work pack shall be produced for 13.1. Paket kerja harus dibuat untuk
every naked flame job. The work pack setiap pekerjaan api terbuka. Paket kerja
shall be written in dual language and will akan ditulis dalam dua bahasa dan
comprise: meliputi :
13.1.1. New Hot Work Naked Flame Work 13.1.1. Prosedur Pekerjaan Panas Api
Safety Procedure (Includes Hot Terbuka (termasuk Hot Work
Work Challenge, Mandatory Safety Challenge, Pencegahan Keselamatan
Precautions) Wajib)
13.1.2. Hot Work Map 13.1.2. Peta pekerjaan panas
13.1.3. Hot Work PTW 13.1.3. Ijin Kerja Panas
13.1.4. Detailed, job specific (level 2) risk 13.1.4. Penilaian resiko level 2 yang detil
assessment dan spesifik.
13.1.5. Site specific Isolation plan and 13.1.5. Rencana isolasi lokasi yang spesifik
Associated Drawings (P&ID/PFD’s) dan gambar terkait (P&ID/PFD) yang
where applicable. berlaku.
13.1.6. Firewatcher Duties 13.1.6. Tugas Firewatcher
13.1.7. Habitat Checklist 13.1.7. Habitat Checklist
13.2. A naked flame work pack shall be 13.2. Paket Kerja api terbuka akan valid
valid for either one year from the date of selama satu tahun dari tanggal
issue, until the job is completed or until a diberlakukan, hingga pekerjaan selesai,
physical change in the physical condition atau hingga perubahan fisik di fasilitas
of the facilities takes place – whichever is terjadi – manapun yang lebih dahulu
least. terpenuhi.
work must be inspected prior to use and melakukan pekerjaan panas harus diinspeksi
located in a safe area (e.g. hoses, cables & sebelum digunakan dan disimpan di area yang
electrical cords in good condition, flash-back aman (cth. Hose, kabel listrik dalam keadaan
arrestors installed on oxy-acetylene hoses, baik, flash-back arrestors terpasang pada
spark arrestors for welding machines). selang oxy-asetilen, spark arrestor pada mesin
las).
17.3.5. Two fire watches available with 17.3.5. Dua Firewatcher tersedia dengan
fire extinguisher, one inside and one alat pemadam api ringan, satu di
outside of habitat. dalam dan satu di luar habitat.
17.3.6. Permit shall be signed by Area 17.3.6. Ijin kerja ditanda tangani oleh
Manager/Company Man at job site. Manajer Area/ Company Man di
lokasi kerja.
17.3.7. No breaking containment activity 17.3.7. Tidak boleh ada kegiatan membuka
is allowed in adjacent areas of the containment disekitar area pekerjaan
hot work. panas.
17.3.8. Completed habitat checklist to be 17.3.8. Checklist habitat yang sudah
attached to PTW before proceeding disetujui dilampirkan pada Ijin kerja
with the work scope. sebelum pekerjaan dilakukan.
17.4. Welding Blanket 17.4. Blanket Pengelasan
A heat-resistant fabric designed to Bahan anti api didesain untuk
be placed in the vicinity of a hot diletakkan disekitar pekerjaan panas
work operation when chipping, ketika chipping, gerinda, perlakuan
grinding, heat treating, sand blasting panas, sand blast dan percikan
and welding spark to prevent pengelasan untuk mencegah
ignition. pembakaran.
17.5. Precautions 17.5. Pencegahan
17.5.1. Habitat should be free from 17.5.1. Habitat harus bebas dari
hydrocarbons and combustible hidrokarbon dan material mudah
materials. terbakar.
17.5.2. Initial Gas Test shall be conducted 17.5.2. Gas tes awal harus dilakukan oleh
by AGT Level 2 with active gas AGT Level 2 dengan gas detector aktif
detector (aspirated/pump type), (aspirated/pump type), dilanjutkan
followed by continuous gas dengan gas monitor berkelanjutan.
detector. Detection should be Deteksi harus dilakukan di dalam
conducted inside the habitat, habitat pengelasan, di luar habitat
including closing and plugging drains and terbuka, termasuk menutup dan menyumbat
bleeders that could leak hydrocarbons, drain dan bleeder yang bisa membocorkan
checking valve packing, pump seals, etc for hidrokarbon, periksa valve, seal pompa, dll.
leaks, and removing any flammable materials. Untuk menghilangkan kebocoran dan material
Actions will include: mudah berbahaya, tindakannya adalah :
18.1. Clean and degrease the workface. 18.1. Bersihkan dan degrease lokasi kerja
18.2. Remove all flammable and 18.2. Singkirkan semua material mudah
combustible materials from at leasst 50 terbakar dari radius 15 meter (50 feet)
feet (15 meter) radius of the work site dari lokasi kerja panas.
(habitat).
18.3. Cover all drains & sumps in area 18.3. Tutup semua drain dan sump di
with wetted fire blankets, drain traps to area dengan fire blanket basah, drain trap
be filled with water. diiisi dengan air.
18.4. Hot work shall not commence 18.4. Pekerjaan panas tidak boleh
until the area is confirmed hydrocarbon dilakukan hingga area dipastikan bebas
free. material mudah terbakar.
authority.
19.3. Hot work permit cancelled and re- 19.3. Ijin Kerja harus ditutup dan
issued every 7 days from date of original diisukan kembali setiap 7 hari dari tanggal
issue accordance with Work Permit pertama kali diedarkan.
Procedure.
19.4. Toolbox Talk to be held every 19.4. TBT dilakukan setiap shift agar PA
shift during which the PA will ensure that dapat memastikan Ijin Kerja dan semua
the PTW and all associated dokumen terkait telah ditinjau bersama
documentation is reviewed in full with all dengan semua anggota pekerja. TBT harus
members of the work party. This shall be didokumentasikan, ditandatangani oleh
documented, signed by the performing tim pelaksana, dan tersedia di lokasi kerja.
team, and available for review at the
workplace.
19.5. Hot work at designated welding 19.5. Pekerjaan panas di workshop
workshop doesn’t required Hot work pengelasan yang sudah ditentukan tidak
permit. Requirement for this designated memerlukan Ijin kerja panas. Persyaratan
welding workshop location are : lokasi aman yang ditetapkan ini adalah :
19.5.1. Must be clearly marked and 19.5.1. Harus ditandai dengan jelas dan
identified. teridentifikasi.
19.5.2. Shall not contain combustible and 19.5.2. Tidak menyimpan bahan yang
flammable material within 15 Meter mudah terbakar dengan radius 15
(50 feet). meter (50 feet).
19.5.3. Shall be free of combustible 19.5.3. Bebas dari atmosfir mudah
atmospheres. terbakar.
19.5.4. Shall be approved by Area 19.5.4. Disetujui oleh Area Manager
Manager.
19.5.5. Fire extinguisher is available and 19.5.5. Tersedianya APAR dan Emergency
must have a proper Emergency Shower yang memadai.
Shower.
19.5.6. Hot Work is not being performed 19.5.6. Tidak melakukan pekerjaan panas
on equipment, which may have pada mesin atau peralatan lain yang
contained a flammable gas or liquid. mengandung gas atau cairan mudah
terbakar.
22.PPE 22.APD
The following PPE is required to be worn Alat pelindung diri berikut harus digunakan
while conducting naked flame related work. saat melakukan pekerjaan panas api terbuka.
22.1. Body Protection 22.1. Pelindung Tubuh
Fire resistant coveralls or clothing shall Coverall tahan api harus digunakan
be worn by personnel performing naked oleh pekerja yang melakukan
flame work. This is only for flash pekerjaan panas. Ini hanya untuk
protection and personnel welding will pelindung bahaya flash fire dan
require additional welding apron, pengelas akan membutuhkan
welding sleeves, welding trouser or tambahan welding apron, welding
equivalent. sleeves, welding trouser atau
sejenisnya.
22.2. Face and Eye Protection 22.2. Pelindung Wajah dan Mata
22.2.1. Properly rated tinted welding 22.2.1. Kacamata pengelasan gelap atau
glasses or goggles or welding glass goggle atau kaca pengelasan untuk
for helmet helm.
22.2.2. Dark safety glasses for fire watch 22.2.2. Kacamata pengaman gelap untuk
Fire watch.
22.2.3. Face shield if grinding 22.2.3. Pelindung wajah untuk gerinda.
22.3. Foot Protection 22.3. Pelindung Kaki
Approved Safety boots Sepatu keselamatan yang standard.
22.4. Head Protection 22.4. Pelindung Kepala
22.4.1. Safety Hard hat 22.4.1. Topi keselamatan
22.4.2. Welders may use the welding 22.4.2. Pengelas menggunakan helm
helmet while welding in place of a pengelasan sebagai ganti dari topi
hard hat keselamatan
22.5. Hand Protection 22.5. Pelindung Tangan
Welding or leather gloves Sarung tangan pengelasan atau kulit.
22.6. Respiratory protection 22.6. Pelindung Pernafasan
Based on the material and location, Tergantung dari material dan lokasi, alat
special breathing respiratory equipment pernafasan khusus mungkin dibutuhkan.
maybe required. Consult with the HSE Konsultasikan dengan CSD.
Department.
stop all hot work activity if the job becomes menghentikan pekerjaan panas jika pekerjaan
unsafe. tersebut menjadi tidak aman.
The VICO policy is to eliminate naked flame hot Kebijakan VICO adalah untuk menghilangkan
work from hazardous areas and reduce hot work pekerjaan panas dari area terklasifikasi dan
by the Vice President Operations/ Vice President pekerjaan panas, hot work challenge harus
Mandatory requirement before using the habitat (completed by Hot Work Naked Flame Habitat Yes No
Inspector) Ya Tidak
Ketentuan wajib yang harus dipenuhi sebelum menggunakan habitat (dilengkapi oleh Inspector)
1 Is the housing secure, safe, made of fire retardant material and sturdy enough to hold men and
equipment?
Apakah habitat tersebut kuat, aman, terbuat dari material anti api dan cukup kuat menampung para penghuni dan alat-alat?
2 Are the entrance and exit satisfactory and are they identified?
Apakah tempat masuk dan keluar telah memadai dan teridentifikasi?
3 Is the inside of habitat and any combustible fabric lined with WET fire blankets and is the fire
blanket secured to ensure that it stays in place within the habitat?
Apakah kondisi dalam habitat dan material mudah terbakar di dalam habitat telah dilindungi fire blanket basah dan fire
blanket tersebut terposisikan dengan benar?
4 Will any welding debrics etc. be contained within the habitat and neither come into contact with
the habitat structure nor fall out the habitat into the external environment?
Apakah semua sisa aktivitas pengelasan dapat dipastikan tidak tercecer sehingga tidak membahayakan dan struktur habitat
atau keluar
Membahayakan lingkungan sekitar?
5 Is the habitat of sufficient size for at least 2 men to carry out the job within minimum restriction?
Apakah habitat cukup untuk menampung setidaknya 2 orang untuk melakukan pekerjaan dengan cukup leluasa?
6 Is the inside of the habitat free from combustible material?
Apakah dalam habitat bebas dari material mudah terbakar?
7 Is the pressurizing air supplied from at least 2 meters within a safe area and is the ducting properly
secured?
Apakah sumber udara masuk berada setidaknya pada jarak 2 meter dari habitat, berada di daerah aman dan jalan masuk
udara terlindungi?
8 Are the duct and air supply to air movers marked ‘FOR HABITAT USE – DO NOT REMOVE’?
Apakah saluran udara masuk dan penggerak blower sudah ditandai “UNTUK PEMAKAIAN HABITAT – JANGAN DILEPAS”?
9 Is the exhaust ducting vented safely out of the module?
Apakah saluran keluar udara terpasang dan mengarah ke lokasi yang aman?
10 Are gas detectors available 1 ea inside habitat, 1ea directly outside habitat , and 2 ea upwind no less
than 20 meters from shelter and 20 meters from one another?
Apakah gas detector tersedia 1 ea didalam habitat, 1 ea berada diluar habitat dan 2 ea tidak boleh lebih 20 meter dari
shelter melawan arah angin dan terpisah dengan yang lain jarak 20 meter?
11 Is Fire Extinguisher available inside of the habitat?
Apakah dalam habitat terdapat fire extinguisher?
12 Is the exit from the habitat of sufficient size to allow easy escape in an emergency?
Apakah pintu keluar habitat memadai untuk keluar menyelamatkan diri dalam situasi darurat?
13 Is the area at the pressurizing duct inlet, gas free?
Mandatory requirement before using the habitat (completed by Hot Work Naked Flame Habitat Yes No
Inspector) Ya Tidak
Ketentuan wajib yang harus dipenuhi sebelum menggunakan habitat (dilengkapi oleh Inspector)
Apakah tempat saluran udara masuk berada bebas dari gas berbahaya?
14 Have all open ended pipes, not subject to workscope been blanked? (Not applicable means yes)
Apakah semua ujung bukaan perpipaan di sekitarnya sudah ditutup? (NA berarti Ya)
15 Is the lighting inside the habitat adequate?
Apakah pencahayaan di dalam habitat mencukupi?
16 Is area near of hot work open flame free from any open/breaking containment activity?
Apakah area sekitar lokasi pekerjaan panas api terbuka bebas dari aktifitas open/breaking containment ?
17 Is the detail location of habitat has been determined by attaching plot plan?
Apakah detail lokasi habitat sudah ditentukan dengan melampirkan plot plan?
I, Hot Work Naked Flame Habitat Inspector, certify that the habitat meets the above mandatory requirements and
is safe to use.
Saya, Inspektor Habitat Kerja Panas Api Terbuka, menyatakan bahwa telah memenuhi semua ketentuan wajib di atas dan aman untuk di
gunakan.
Name/ Nama: ………………………………. Sign/ Tanda tangan: ………………………………. Date-Time/Tanggal - Jam: …………………
I, Area Authority, declare that I have visited & inspected the habitat with the Hot Work Naked Flame Habitat
Inspector and confirm this habitat can be used for Hot Work Naked Flame work.
Saya, Pengawas Daerah, menyatakan telah mengunjungi dan menginspeksi habitat tersebut bersama Inspektor Habitat Kerja Panas Api
Terbuka dan menyatakan habitat dapat digunakan untuk pekerjaan panas api terbuka (HWNF).
Name/ Nama: ………………………………. Sign/ Tanda tangan: ………………………………. Date-Time/Tanggal - Jam: ………………..
Note: The answer to all above questions shall be “Yes. Any conditions which do not meet the procedure shall be corrected before
habitat can be used.
Catatan : Semua jawaban dari pertanyaan diatas harus “Ya”. Kondisi apapun yang tidak sesuai dengan prosedur harus diperbaiki sebelum
habitat digunakan.
1. Fire Watcher must inspect the work-site and ensure that all flammable materials from the immediate
and adjacent area have been removed prior to start of Hot Work.
2. Fire Watcher must remain in attendance at all times during Hot Work
3. Must ensure drains remain covered and sealed
4. Fire Watcher will remain to monitor work area for a period after work ceases as agreed by
Performing Authority.
5. If necessary a second Fire Watcher will be detailed to monitor adjacent areas.
Above, below and four sides
6. Must be familiar with all safety equipment adjacent to the work area:
Telephones and their location
Emergency number
Ensure Portable Gas Monitor is positioned in effective position (Upwind of Hot Work)
General platform alarm switches and their location
Use of Portable fire extinguishers
7. Ensure a fire water hose is pressurised to the nozzle and laid out ready for use. Run hose away from
walkways and stairways if possible to avoid trip hazard. (If required as part of risk assessment)
8. Continuously monitor for stray sparks and inform operator when necessary to adjust/ damp down
fire blankets.
9. Must ensure that equipment is isolated in the event of emergency and ensuring worksite is in safe
condition before proceeding to muster point in the event of a general platform alarm
10. Ensure that access and escape routes are clear at all times
THE FIRE WATCHER HAS BEEN INSTRUCTED AS ABOVE
Performing Authority…………………………….. (Name)……………………………… (Signature)
Appendix 4
SAFETY PRECAUTIONS
1. Work to be under control of Area Authority, site supervised and work execution controlled by
Performing Authority, monitored by Safety Representative.
2. Hot work challenge shall be authorised and attached to the work pack.
3. Closely control other work in the area – especially no venting, breaking of containment on
hydrocarbon systems, pigging etc.
4. Gas check on all flanged connections and vents to be carried out within 20m of the work
location before work commences
5. Continuous gas monitoring at the work site during work
6. The Performing Authority must have completed Performing Authority and Naked Flame training
and be assessed and registered competent.
7. Erect fire blankets on the floor and 4-sides of a habitat to contain sparks and splatter within the
habitat.
8. Drains Should be covered by wet fire blankets within 15m within hot work
9. Area around work site and work area should be cleaned from hydrocarbon deposits
10. Dry powder fire extinguisher to be on site along with charged fire hose
11. Ensure barriers are erected around work area
12. Hot work permit must be issued and revalidated at each shift change. Adhere to the
appropriate VICO HSE Practices at all times
13. Complete and discuss Level 2 risk assessment at worksite during pre-job safety meeting before
starting work
14. Safety meeting will be held on location daily, before work commences, with all personnel
involved in task
15. A contingency plan to be used in an emergency must be discussed and agreed by personnel
involved in task as part of Pre Job Safety Meeting
16. In case of fire, secure the worksite and follow the agreed emergency evacuation plan.
17. Keep access/egress routes clear of obstruction. (Walkways and escape routes) as Clearly
Identified in Evacuation Plan
18. All tools used must be tested, certified and in good condition and must be correct tools for the
job
19. The cutting/welding equipment must be tested, in good condition, placed in safe location and
properly grounded prior to work commencing. Guards shall be fitted to grinders. Tools to be
operated by competent personnel.
20. All workers must wear correct PPE at all times
21. Ensure good ventilation at the worksite
22. No sampling or venting of hydrocarbons in area of hot work while work is ongoing
23. If events or circumstances change the scope of work, method or procedure then work must stop
and the necessary review and approvals must be obtained prior to work re-commencing
(Management Of Change).
24. No change in operations while task is ongoing
Appendix 5
Hot Work Map Hot Work Naked Flame Control of Work
Hot Work Naked Flame activities shall not be carried out in area 1. Where there is no other
Area 1 practical engineering option, the Hot Work Naked Flame should be scheduled during an
area shutdown, after hydrocarbon-freeing of the relevant equipment.
UNCLASSIFIEDFI