ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK : SKILL
_____ ___
MEN _________
MAN-HOURS
ELAPSED TIME :
GA 05-51-25
CHK 10000-001
2-400 PAGE 1
DEC 01/13
05-51-25 CHK 10000-001
INSPECTION AFTER FLIGHT
OR GROUND CONTAMINATION
BY VOLCANIC ASH 2 DEC13
001 ___________
INFORMATION
002 _______
WARNING
GA 05-51-25
CHK 10000-001
2-400 PAGE 2
DEC 01/13
05-51-25 CHK 10000-001
INSPECTION AFTER FLIGHT
OR GROUND CONTAMINATION
BY VOLCANIC ASH 3 DEC13
003 _________________________
INSPECTION RECOMMENDATION
GA 05-51-25
CHK 10000-001
2-400 PAGE 3
DEC 01/13
05-51-25 CHK 10000-001
INSPECTION AFTER FLIGHT
OR GROUND CONTAMINATION
BY VOLCANIC ASH 4 DEC13
004 ________________
SERVICING ATA 12
005 _______________________
AIR CONDITIONING ATA 21
ECS
REMOVE FOR CLEANING: IF APPLICABLE DEPENDING
ON A/C VERSION:
SERVICE PRESS. REG. 215152-RAI-10000
EXCHANGER 215151-RAI-10000
WATER EXTRACTOR 215155-RAI-10000
SPRAY NOZZLE 215191-RAI-10000
MODULATING VALVE 216151-RAI-10000
ADD HEAT VALVE 216152-RAI-10000
RECIRC. FAN 212221-RAI-10000
PACK VALVES 211151-RAI-10000
TURBOFAN 215158-RAI-10000
CHECK OF:
RAM AIR CHECK VALVE 215159-CHK-10000
GRND COOLING TURBOFAN 215193-RAI-10000
ECS FUNCTIONAL TEST 216100-OPT-10000
JET PUMP 213121-RAI-10000
CHECK VALVE 213125-RAI-10000
E/P OUT FLOW VALVE FILTER 213124-RAI-10000
CHECK OF:
CPCS IN AUTO MODE 213100-FUT-10000
CPCS IN MANUAL MODE 213100-FUT-10020
E/E COOLING AIR EXTR.FAN 212300-OPT-10010
006 __________________
AUTO FLIGHT ATA 22
GA 05-51-25
CHK 10000-001
2-400 PAGE 4
DEC 01/13
05-51-25 CHK 10000-001
INSPECTION AFTER FLIGHT
OR GROUND CONTAMINATION
BY VOLCANIC ASH 5 DEC13
007 ____________________
COMMUNICATION ATA 23
008 _________________
ELECTRICAL ATA 24
009 ____________________________
FIRE/SMOKE PROTECTION ATA 26
010 ______________________
FLIGHT CONTROLS ATA 27
GA 05-51-25
CHK 10000-001
2-400 PAGE 5
DEC 01/13
05-51-25 CHK 10000-001
INSPECTION AFTER FLIGHT
OR GROUND CONTAMINATION
BY VOLCANIC ASH 6 DEC13
GA 05-51-25
CHK 10000-001
2-400 PAGE 6
DEC 01/13
05-51-25 CHK 10000-001
INSPECTION AFTER FLIGHT
OR GROUND CONTAMINATION
BY VOLCANIC ASH 7 DEC13
SWITCH.
FOR A/C POST.MOD.3529 OR 3530 CHECK THE
RECONDITIONING ACTUATOR ROD.
6. THE STICK PUSHER ACTUATOR ROD.
IF CONTAMINATION IS FOUND CLEAN AND LUBRI
CATED AS PER JIC 122227-LUB-10000.
011 ___________
FUEL ATA 28
012 ______________________
HYDRAULIC POWER ATA 29
IF CONTAMINATION IS FOUND:
- REPLACE THE FILTER ELEMENT.
- TAKE A SAMPLE OF FLUID AND MAKE SURE THAT THE
CONTAMINATION IS IN THE PERMITED LIMITS IN AC-
CORDANCE TO NSA 307110.
REF.FIG.:055125-CHK-00108.
GA 05-51-25
CHK 10000-001
2-400 PAGE 7
DEC 01/13
05-51-25 CHK 10000-001
INSPECTION AFTER FLIGHT
OR GROUND CONTAMINATION
BY VOLCANIC ASH 8 DEC13
013 ______________________________
ICE AND RAIN PROTECTION ATA 30
DE-ICE SYSTEM
CHECK OF:
AIR FRAME DE-ICING 301100-OPT-10000
ENG.DE-ICING 302100-OPT-10000
ICE DETECTOR PROBE 308100-FUT-10000
014 ___________________
LANDING GEAR ATA 32
CLEANING METHOD
WARNING: NO VAPOUR OR HIGH PRESSURE CLEANING
HAS TO BE USED.
WATER INGRESS AND MOISTURE RETENTION CAN CAUSE
SEVERE DAMAGES TO:
-ELECTRICAL EQUIPMENT (SHORT CIRCUIT OR FALSE
INDICATION)
-STRUCTURAL PARTS
GA 05-51-25
CHK 10000-001
2-400 PAGE 8
DEC 01/13
05-51-25 CHK 10000-001
INSPECTION AFTER FLIGHT
OR GROUND CONTAMINATION
BY VOLCANIC ASH 9 DEC13
CLEANING PROCEDURE
APPLY A THICK LAYER OF PRODUCT ON THE SURFACE
TO BE CLEANED BY USING A BRUSH OR A SPONGE
WAIT FOR APPROX.10 MINUTES.
RINSE WITH CLEAR WATER AND DRY BY COMPRESSED
AIR.
-WIPE WITH A DRY LINT-FREE CLOTH PARTICULARLY
IN THE AREAS LIKELY TO RETAIN HUMIDITY.
VISUAL INSPECTION
-CHECK FOR PAINT CONDITION
-CHECK NO CORROSION IS EVIDENCED ON STRCTURAL
PARTS OR ATTACHMENT PINS.
NOTE:MESSIER DOWTY MUST BE INFORMED FOR ADVICE
IN CASE OF PROTECTION DANAGE OR CORRODED PARTS.
GA 05-51-25
CHK 10000-001
2-400 PAGE 9
DEC 01/13
05-51-25 CHK 10000-001
INSPECTION AFTER FLIGHT
OR GROUND CONTAMINATION
BY VOLCANIC ASH 10 DEC13
015 _____________
LIGHTS ATA 33
016 ________________
NAVIGATION ATA34
GA 05-51-25
CHK 10000-001
2-400 PAGE 10
DEC 01/13
05-51-25 CHK 10000-001
INSPECTION AFTER FLIGHT
OR GROUND CONTAMINATION
BY VOLCANIC ASH 11 DEC13
017 ________________
PNEUMATIC ATA 36
018 _________
STRUCTURE
ATA 52
ATA 53
GA 05-51-25
CHK 10000-001
2-400 PAGE 11
DEC 01/13
05-51-25 CHK 10000-001
INSPECTION AFTER FLIGHT
OR GROUND CONTAMINATION
BY VOLCANIC ASH 12 DEC13
019 ______
ATA 54
NACELLES
020 ______
ATA 55
HORIZONTAL STABILIZER
GA 05-51-25
CHK 10000-001
2-400 PAGE 12
DEC 01/13
05-51-25 CHK 10000-001
INSPECTION AFTER FLIGHT
OR GROUND CONTAMINATION
BY VOLCANIC ASH 13 DEC13
021 __________________________________
WINDSHIELD AND CABIN WINDOW ATA 56
022 ____________________
FUSELAGE/WING ATA 57
CENTER FUSELAGE
WING
GA 05-51-25
CHK 10000-001
2-400 PAGE 13
DEC 01/13
05-51-25 CHK 10000-001
INSPECTION AFTER FLIGHT
OR GROUND CONTAMINATION
BY VOLCANIC ASH 14 DEC13
023 _____________________
POWER PLANT/PROPELLER
ENGINE MAINTENANCE
REFER TO PW&C EMM 05-50-00
GENERAL INSPECTION:
REF. TO MPD SECT.10 ZONAL TASK (ZL 400)
ENGINE COWLS
PROPELLER/HUB
GA 05-51-25
CHK 10000-001
2-400 PAGE 14
DEC 01/13
05-51-25 CHK 10000-001
INSPECTION AFTER FLIGHT
OR GROUND CONTAMINATION
BY VOLCANIC ASH 15 DEC13
***** E N D O F T E X T *****
GA 05-51-25
CHK 10000-001
2-400 PAGE 15
DEC 01/13
05-51-25 CHK 10000-001
16 DEC13