DESIGN COST OF REMAINING TENDER PACKAGE FOLLOW DECREE 79

CURRENT REMAINING TENDER


FEE APPLICABLE UNDER DECREE 79 CURRENT CONTRACT AMOUNTED
BUDGET

No. Description
STT Hạng mục FEASIBILITY STUDY FOR FEE REMAIINING
FOR CON STRUCTION DESIGN PACKAGE D1 TO D6
INCLUDE BASIC TECHINCAL DESIGN CONSTRUCTION TOTAL BASIC + TECHNICAL TOTAL EXCLUDE
DESIGN FOLLOW DECREE 79
DESIGN DESIGN FEASIBILITY STUDY

A1 A2 A3 A4 B1 B3 B4 B5 C1

Architecture
D1 1,454,836,000 7,214,083,333 3,967,745,833 12,636,665,167 7,400,000,000 - 7,400,000,000 3,781,829,167 5,116,136,000
Ki ến trúc

Structure
D2 1,454,836,000 7,214,083,333 3,650,326,167 12,319,245,500 6,776,650,000 - 6,776,650,000 4,087,759,500 4,689,791,333
K ết cấu

Signage Design
D3 145,483,600 721,408,333 396,774,583 1,263,666,517 - - - 1,118,182,917 1,279,034,000
Thi ết kế bảng chỉ dẫn

Façade Design
D4 465,547,520 2,308,506,667 1,269,678,667 4,043,732,853 - - - 3,578,185,333 2,558,068,000
Thi ết kế Façade

Lighting Design (Interior/Exterior)


D5 232,773,760 1,154,253,333 634,839,333 2,021,866,427 - - - 1,789,092,667 2,131,723,333
Thi ết kế chiếu sáng (Nội thất / ngoại thất)

Kitchen/ Laundry Design


D6 145,483,600 721,408,333 396,774,583 1,263,666,517 - - - 1,118,182,917 1,279,034,000
Thi ết kế nh à b ếp/ Laundry

MEP
1,454,836,000 7,214,083,333 3,967,745,833 12,636,665,167 6,858,000,000 1,097,280,000.00 7,955,280,000 3,226,549,167
Cơ đi ện

Interior/ Landscape
465,547,520 2,308,506,667 1,269,678,667 4,043,732,853 2,358,720,000 2,882,880,000 5,241,600,000 (1,663,414,667)
Nội thất/ Cảnh quan

Basement structure– FC Design


317,419,667 317,419,667 300,000,000 300,000,000 17,419,667
K ết cấu tầng hầm– Thiết kế BV thi công

SUM 5,819,344,000 28,856,333,333 15,870,983,333 50,546,660,667 23,393,370,000 4,280,160,000 27,673,530,000 17,053,786,667 17,053,786,667