Observations:-
2. The present situation is that another new motor has been lowered
and is functioning. Readings over several days has shown that the motor
is capable of pumping 6 minutes of water for every hour rested with
heavy flow rate. Even if rested for 2 hours or 4 hours or 8 hours or even
24 hours, the motor pumps only for 6 minutes continuously for every 1
hour gap.
3. If left ON, the motor pumps run sporadically with intermittent breaks
delivering very less or no water. The bore motor of 7.5 HP is near the
entry while the sump motor of 5 HP is inside the sump near the exit of
tower 3.
4. Entire Tower 4 (40 flats) water is being supplied from Tower -3 water
overhead tank. The tower -4 water valve is switched off. Only 10 flats
are being supplied water from tower -4 tank.
6. The bore water is drawn from tower 3 and is used to run the RO plant
in tower 4. While the RO reject water is being pumped back into the
same bore water tank of tower 3. Tower 3 residents are not aware that
their bathing/brushing needs are being met by bore water mixed with
RO reject water. Upon inquiry it was stated by Pinku who maintains the
RO for all towers that the water looks clear and good. Sheriff does not
maintain. Only when something burns up or does not work he calls the
technician/electrician/plumber to fix it up.
7. Tower 4 does not have a separate STP/reject water tank, the tower 3
STP/reject water tank serves those needs of Tower 4.
Report prepared by Krishna R.K.V., Flat No.515, Tower 3, Block B1, Bonsai Apt. Readings taken over 7 days between 17 th
September to 24th September, 2016. Please call - Ph:8978733633 for any clarifications.
8. The RO tank is 2000 litres in tower 3 while the RO tank near the
tower 4 plant is 5000 litres. Tower 4 RO tank has not been cleaned and
is not being used. Everyday, both towers use 2 loads of RO water. That
is 4000 litres for 100 apartments or 40 litres for each apartment and is
pumped once in the morning and once in the evening. 2 cans of water
per household/day when restricted to filling the tank only twice/day. No
TDS readings are taken, monitored or communicated/published to
apartment owners. The apartment owners blissfully consume RO which
at most times is unsuitable for consumption. The inlet pump leaks
profusely due to flange wear. RO has no maintenance. The pressure
vessel was broken and not replaced for 9 months. Sheriff himself is
unskilled and does not even check - though he has been instructed orally
and the staff have no idea what to do. No records are maintained for
TDS readings, filter changes, maintenance etc,.
Explanation:
3. Linear loads with low power factor (such as induction motors) can be
corrected with a passive network of capacitors or inductors. Non-
linear loads, such as rectifiers, distort the current drawn from the
system. In such cases, active or passive power factor correction may
be used to counteract the distortion and raise the power factor. The
devices for correction of the power factor may be built into power-
consuming equipment.
4. The staff who put on or off the motors do not check if the tank is full
or not. They have no idea of how long it takes for the tanks to fill.
The amount of time to fill the over head tanks must be measured and
calculated based on the flow rate. Likewise, the amount of time to fill
the club house tanks. Each tower has different sized tanks. Periodic
preventive maintenance, wherein the plumber goes to every flat and
checks unreported leakages is a MUST.
Report prepared by Krishna R.K.V., Flat No.515, Tower 3, Block B1, Bonsai Apt. Readings taken over 7 days between 17 th
September to 24th September, 2016. Please call - Ph:8978733633 for any clarifications.
Recommendations/Solutions:-
a) The 2 tanks at the sump level should be connected and, actually, one
of the 5 HP motor has been removed. Only one tank is being used.
The motors should be used alternatively. When both tanks are
connected, residents can be assured of back up water for a day. Also,
if both motors are used, one will act as back up even if one burns
out.
d) RO reject water must be put in STP tank, it is being put in daily use
tank for bathing and washing.
f) The tube lights need to be reduced from 8 to 5 for every floor, i.e.,
one near the lifts and 4 in the four corners. Also, tube lights need to
be switched off at 9.30 pm instead of 10 pm. Thereafter, the
individual apartment owner who requires it can switch it on, if
needed. LED lights must be used instead of current tube lights.
g) Rain water drain pipes in each tower can be connected to flow into
the sump instead of wasting it as there is only one RWH pit for entire
Bonsai. Many drain pipes are located higher than the drain holes, so
water stagnates.
i) Cost per stabilizer will be max Rs.3000/- for each motor. The cost for
automatic switch with timer will be max Rs.1500/-. That’s Rs.9000/-
for each tower and is better than paying huge electricity bills,
manpower every month.
Conclusions:
When the above measures were supervised and implemented for 7 days,
the electricity meter readings dropped substantially from 140 units to
50-60 units/day though the staff still practiced surreptitiously by putting
the motors after I left. The power factor also increased to 0.95
Elect a floor leader for each floor, all floor leaders elect a tower leader,
collect your maintenance and apportion a certain amount for common
area maintenance. Rest fix your floor areas first. Secure a corpus for
spares, especially spare motors. The present system (society) is a dud
with people only vying for positions without any accountability or
responsibility.
Description ON OFF
Street Lights Dusk 12.oo pm
5.oo am 6.oo am
Floor Lights Dusk 10.oo pm
Instead of 8 lights; reduce to 5 tubelights/floor
and keep lift light on until 6.oo am
Sump/overhead 4.oo am 6.oo am
Motor
3.oo pm 5.oo pm
Bore Motor 6 Mins /Hour
RO to be filled only once in the morning (2000 Lts for 100 Apartments)
if voted to be kept running.