SCOPE BASELINE
Template: Scope Baseline-v1.1.dotx
Doc Name: ID-PN-RG-Scope Baseline-mmddyyyy-v#.docx
TABLE OF CONTENTS
1. PURPOSE ........................................................................................................................................ 2
2. PROJECT SCOPE STATEMENT .............................................................................................................. 2
3. WORK BREAKDOWN STRUCTURE ......................................................................................................... 2
4. WBS DICTIONARY – WORK PACKAGES................................................................................................. 4
ID
1. Purpose
The Scope Baseline provides approved detail for project scope statement, WBS and dictionary of each work packages.
The project schedule was derived from the WBS and Business Case with input from all project team members. The
schedule was completed, reviewed by the Project Sponsor, and approved and base-lined. The schedule will be maintained
as a MS Project Gantt Chart by the Release Coordinator. Any proposed changes to the schedule will follow IT-Production
change control process. If established boundary controls may be exceeded, a change request will be submitted to the
Release Coordinator and Production Manager.
CPI less than 0.98 or greater than 1.0 and SPI less than 0.98 or greater than 1.0 reference to documents: Monthly Status
Report, First Tab and Project Closeout Report, First Tab.
If the change is approved by the Project Sponsor then it will be implemented by the Release Coordinator who will update
the schedule and all documentation and communicate the change to all stakeholders in accordance with the Change
Control Process.
The Project Schedule Baseline is provided in document Schedule Plan belongs to the actual project, Work Breakdown
Structure is provided in Appendix A.
1.1 Conduct Needs Analysis 2.1 Create Project Plan 3.1 QA Testing Preparation 4.1 UAT Preparation
5.1 CAB Meeting 6.1 Project Closeout Report
• Create BAC ticket • Follow Test Traceability • UAT plan and sign off
• Review ERP tickets relate to the Requirements Matrix EF • Develop UAT scrips
release 2.2 Create Project Status Report • Develop Testin/Scenario Scrips • Update deployment tech plan 6.2 Complete Identify Project Artifacts
(HPQC) 5.2 Communicate to all Stakeholders
• Review vendor release notes • Set up UAT environment tool and archive
• Create assess functionalties-E&F • Set up Test Management tool (HPQC)
• Determine potetial risk, issues and 2.3 Review Analysis Requirements (HPQC) • Identify user group 5.3 Production Environment
6.3 Update Projec Plan, Lessons
impact Preparation
Learne3d, Project Documents and
2.4 Develop Inventory of all Change 4.2 UAT Environment Set up • Provide Infrastructure with Archive
3.2 Testing Regression E Setup deployment tech plan
Impact • Follow deployment tech plan and
1.2 Collect Requirements • Determinar test environment code Tech change plan • IT set up hardware and apply
• Create Tech Change Plan requirement 6.4 Distribuite to team members &
• Identify Project Artifacts • Update configuration document application
• Meet with Technical Change • Receive Vendor Deployment Tech release resources
• Preliminary delivery timeline - Manager • Enter configuration • System Configuration
Plan • Configure middleware/integration
Scope Baseline • Meet with QA Manager • Enter configuration for all integrated
• Create configuration document endpoints
• Resource Requirements • Meet with Infrastructure Manager systems
Traceability Matrix • Enter Configuration • Apply security for end users
• Add users and appropriate sucurity
• Asses Project Cost - Scope Baseline • Enter configuration for all integrated
systemsn
2.5 Document Functional
Specifications BP • Add users and appropriate security 4.3 UAT Execution
5.4 Go-Life
1.3 Desicion Point meeting • Enhancements • Execute tests - include business
• Fixes process testing
3.3 Testing Regression Execution • UAT execution reporting and sign off
5.5 Follow-up Meetings
1.4 Update BAC ticket 2.6 Review Enhancements & Fixes • Execute test cases
• Data verification and validation
4.4 Close UAT
• Identify defects to product
1.5 Define roles, responsabilities & specifications • Determinar Workaround if required
Communication Plan 2.7 Kick off Meeting • Meeting to obtain approval - Subtantial
• Assigned all defects and request
new code to vendor completion
1.6 Update Production Release • Modify code and re-test new code • Review open defect with B units
Scheduler 2.8 Feedback • Obtain sign off for deployment
• Finalize deployment tech plan by production
3.4 Testing Functional E Setup
2.9 Incorporate feedback
1.7 Busines Case • Same of 3.2
• Business Process Change Plan
• Finance Applications Change Plan 3.5 Testing Functional Execution
1.8 Financial Work Order • Same of 3.3
4. Sponsor Acceptance
I understand that by agreeing to participate in this project through the execution of the scope baseline, I approve
of the scope and activities defined and authorize my department to participate as documented for the successful
implementation of this application in our department.
4. BPL _____/_____/_______