Sie sind auf Seite 1von 5

ANNEX I

TECHNICAL DESIGNS AND DRAWINGS


(Mechanical)

UNOPS
project

UNICEF KENYA

PROPOSED OXYGEN PLANT


AT MAMA LUCY REFERRAL HOSPITAL
NAIROBI COUNTY.
APRIL 2017
A B C
16,200
D E
600
UNOPS
Operational excellence for results that matter
East Africa Hub (EAH), Nairobi
UNOPS Building, UN lane,
Off Avenue P.O. Box 783,
Village Market, 00621
Nairobi, Kenya.

600
4 4 NOTES
GENERAL NOTES

1. All dimensions are in centimetres, unless otherwise stated.

2. All dimensions to be checked and confirmed on site before commencement


of any work.

3. Written dimensions overrides scaled dimensions,thus all dimensions are


to be read and not at any time scaled from the drawing.
3,500

4. Any discrepancy to be reported to the Engineer promptly before proceeding.

INTERNAL PLUMBING NOTES

1. Plumbing Pipework shall be of Polypropylene Random


copolymer PP-R PN 25 Plastic Piping
to DIN 8078 and DIN 8077 for both hot and cold water systems.

2. Hot Water System piping and associated equipment shall be insulated with
mineral wool, fiberglass or polyethylene foam thermal insulation clad with
gauge 24 galvanised mild steel sheeting for pipes exposed to weather and
suitable aluminum foil laminate for weather- protected pipes. thickness of
insulation shall be equal to piping diameter.

3. Piping and Equipment thermal insulation to conform to the latest editions

3 3 of BS 5970, BS 5422 and BS EN ISO 12241.

4. Installation of pipework to be carried out in accordance with the latest


editions of BS 6700, BS EN 806, local authority by-laws and piping
manufacturers' printed instruction and recommendations.

5. Hot Water Supply System to conform to BS code of practice


CP 342-2 : 1974 and the latest edition of BS 6700.

6. Isolating valves to be fitted on major pipe branches and at strategic /


convenient points to facilitate maintenance of sanitary fittings and piping.

7. Roof pipe penetration and flashing shall be to architect's and roofing


manufacturer's recommended details.

FIRE PROTECTION NOTES


4,300

11,500
1. Portable Fire Extinguisher Fire Protection System and Equipment to conform
to requirements contained in the latest editions of BS 5306 and BS EN 3.

ALL PURPOSE DRY POWDER


FIRE EXTINGUISHER NO. REVISION DATE APPR.
CO₂ FIRE EXTINGUISHER
(INSIDE CUPBOARD TO
(INSIDE CUPBOARD TO
ARCHITECT'S DETAILS)
ARCHITECT'S DETAILS)
+0.150
W/CO₂ FIRE EXTINGUISHER CLIENT
(INSIDE CUPBOARD TO
2 2
ARCHITECT'S DETAILS)
UNICEF
25cws FA PROJECT

PROPOSED OXYGEN PLANT AT


MAMA LUCY REFERRAL HOSPITAL
20cws NAIROBI COUNTY
whb
25cws DRAWING TITLE
wc
Internal Plumbing
and Fire Protection System Layout
25RM 20cws Mama Lucy Referral Hospital
1 1 Nairobi County.
SIGN
25cws FA 25cws FA
DESIGNED BY HWS
CHECKED BY PG
APPROVED BY ME
ramp up ramp up DATE APRIL 2016
DRAWING NUMBER:

DSU-UNICEF-15-42/MS/WS/01

FROM EXISTING MAINS LINE COPYRIGHT RESERVED


THIS DESIGN AND DETAIL ARE, AND
AT ALL TIMES THE EXCLUSIVE
PROPERTY OF THE UNOPS/EAH,NAIROBI
AND CANNOT BE USED OR REPRODUCED
TENDER DRAWING WITHOUT WRITTEN CONSENT.
A B C D E
A B C D E UNOPS
Operational excellence for results that matter
East Africa Hub (EAH), Nairobi
UNOPS Building, UN lane,
Off Avenue P.O. Box 783,
Village Market, 00621
Nairobi, Kenya.

NOTES
4 4 GENERAL NOTES

1. All dimensions are in centimetres, unless otherwise stated.

2. All dimensions to be checked and confirmed on site before commencement


of any work.

3. Written dimensions overrides scaled dimensions,thus all dimensions are


to be read and not at any time scaled from the drawing.

4. Any discrepancy to be reported to the Engineer promptly before proceeding.

INTERNAL PLUMBING NOTES

1. Plumbing Pipework shall be of Polypropylene Random


copolymer PP-R PN 25 Plastic Piping
to DIN 8078 and DIN 8077 for both hot and cold water systems.

2. Hot Water System piping and associated equipment shall be insulated with

SLOPE

SLOPE
mineral wool, fiberglass or polyethylene foam thermal insulation clad with
gauge 24 galvanised mild steel sheeting for pipes exposed to weather and
suitable aluminum foil laminate for weather- protected pipes. thickness of
insulation shall be equal to piping diameter.

3. Piping and Equipment thermal insulation to conform to the latest editions

3 3 of BS 5970, BS 5422 and BS EN ISO 12241.

4. Installation of pipework to be carried out in accordance with the latest


editions of BS 6700, BS EN 806, local authority by-laws and piping
manufacturers' printed instruction and recommendations.

5. Hot Water Supply System to conform to BS code of practice


CP 342-2 : 1974 and the latest edition of BS 6700.

6. Isolating valves to be fitted on major pipe branches and at strategic /


convenient points to facilitate maintenance of sanitary fittings and piping.

7. Roof pipe penetration and flashing shall be to architect's and roofing


manufacturer's recommended details.

FIRE PROTECTION NOTES

1. Portable Fire Extinguisher Fire Protection System and Equipment to conform


to requirements contained in the latest editions of BS 5306 and BS EN 3.

2NO. 870MMX860MM HIGH, @500L PLASTIC NO. REVISION DATE APPR.


ROTARY MOULDED COLD WATER STORAGE
TANK INSIDE ROOF SPACE, TO S.E'S
DETAILS
2 2 CLIENT

UNICEF
SLOPE

SLOPE
25cws
PROJECT
25cws TB PROPOSED OXYGEN PLANT AT
MAMA LUCY REFERRAL HOSPITAL
25cws NAIROBI COUNTY

DRAWING TITLE
25RM Roof Level Internal Plumbing
1 1 System Layout
Mama Lucy Referral Hospital
25cws TB 25cws TB Nairobi County
SIGN

DESIGNED BY HWS
CHECKED BY PG
APPROVED BY ME
A
A B C D E DATE APRIL 2016
DRAWING NUMBER:

DSU-UNICEF-15-42/MS/WS/02

COPYRIGHT RESERVED
THIS DESIGN AND DETAIL ARE, AND
AT ALL TIMES THE EXCLUSIVE
PROPERTY OF THE UNOPS/EAH,NAIROBI
AND CANNOT BE USED OR REPRODUCED
TENDER DRAWING WITHOUT WRITTEN CONSENT.
A B C D E
UNOPS
Operational excellence for results that matter
16,200 600 East Africa Hub (EAH), Nairobi
UNOPS Building, UN lane,
Off Avenue P.O. Box 783,
100Ø RAINWATER 100Ø RAINWATER Village Market, 00621
DOWNPIPE DOWNPIPE Nairobi, Kenya.

600
4 4 NOTES
GENERAL NOTES
1. All dimensions are in centimetres, unless otherwise stated.

2. All dimensions to be checked and confirmed on site before


commencement of any work.

3. Written dimensions overrides scaled dimensions,thus all


dimensions are to be read and not at any time scaled from
the drawing.
3,500

4. Any discrepancy to be reported to the Engineer promptly


before proceeding.

SANITARY DRAINAGE NOTES

1. The Sanitary Drainage to be of UPVC Pipework for soil


water drainage and MUPVC Pipework for waste water
drainage to BS EN 1329 -1:2000 and BS EN 1401-1:2009
for above and underground pipe work respectively.

3 3 2. Drainage Installation to be carried out in accordance with


the latest edition of BS EN 12056, local authority by-laws
and the material / equipment manufacturer`s printed
instructions.

3. Drainage ventilating pipes (vent pipes and stack vent pipes)


to terminate at least 900mm above any opening into the
building within 3000mm and should be finished with a
rodent and weatherproof vent cowl (wire cage or other
perforated cover), fixed at the end of the ventilating pipe,
which does not restrict the flow of air.
4,300

11,500
4. Roof pipe penetration and flashing shall be to Architect's
and Roofing Manufacturer's recommended details.

5. Refer to civil engineer's drawing for External Foul and Storm


Water Drainage design and details.

6. Drainage invert levels for first manhole s to be coordinated


with the civil engineer.

+0.150
NO. REVISION DATE APPR.
2 2

CLIENT

UNICEF
whb

wc
PROJECT
PROPOSED OXYGEN PLANT AT
MAMA LUCY REFERRAL HOSPITAL
1 1 NAIROBI COUNTY
GT

100Ø RAINWATER 100Ø RAINWATER DRAWING TITLE


DOWNPIPE DOWNPIPE Internal Drainage and
Rainwater Downpipe System Layout
Mama Lucy Referral Hospital
ramp up ramp up Nairobi County
TO EXISTING MH
SIGN

HWS
DRAINAGE SYSTEM
DESIGNED BY

CHECKED BY PG
APPROVED BY ME
A B C D E DATE APRIL 2017
DRAWING NUMBER:

DSU-UNICEF-15-42/MS/DR/01

COPYRIGHT RESERVED
THIS DESIGN AND DETAIL ARE, AND
AT ALL TIMES THE EXCLUSIVE
PROPERTY OF THE UNOPS/EAH,NAIROBI
AND CANNOT BE USED OR REPRODUCED
TENDER DRAWING WITHOUT WRITTEN CONSENT.
A B C D E UNOPS
Operational excellence for results that matter
East Africa Hub (EAH), Nairobi
UNOPS Building, UN lane,
100Ø RAINWATER 100Ø RAINWATER Off Avenue P.O. Box 783,
Village Market, 00621
DOWNPIPE DOWNPIPE Nairobi, Kenya.

NOTES
4 4 GENERAL NOTES
1. All dimensions are in centimetres, unless otherwise stated.

2. All dimensions to be checked and confirmed on site before


commencement of any work.

3. Written dimensions overrides scaled dimensions,thus all


dimensions are to be read and not at any time scaled from
the drawing.

4. Any discrepancy to be reported to the Engineer promptly


before proceeding.

SANITARY DRAINAGE NOTES

1. The Sanitary Drainage to be of UPVC Pipework for soil


water drainage and MUPVC Pipework for waste water
drainage to BS EN 1329 -1:2000 and BS EN 1401-1:2009

SLOPE

SLOPE
for above and underground pipe work respectively.

2. Drainage Installation to be carried out in accordance with


the latest edition of BS EN 12056, local authority by-laws
and the material / equipment manufacturer`s printed

3 3 instructions.

3. Drainage ventilating pipes (vent pipes and stack vent pipes)


to terminate at least 900mm above any opening into the
building within 3000mm and should be finished with a
rodent and weatherproof vent cowl (wire cage or other
perforated cover), fixed at the end of the ventilating pipe,
which does not restrict the flow of air.

4. Roof pipe penetration and flashing shall be to Architect's


and Roofing Manufacturer's recommended details.

5. Refer to civil engineer's drawing for External Foul and Storm


Water Drainage design and details.

6. Drainage invert levels for first manhole s to be coordinated


with the civil engineer.

NO. REVISION DATE APPR.

CLIENT
2 2
UNICEF
SLOPE

SLOPE
PROJECT
PROPOSED OXYGEN PLANT AT
MAMA LUCY REFERRAL HOSPITAL
NAIROBI COUNTY

DRAWING TITLE
Roof Level Internal Drainage and
Rainwater Downpipe System Layout
1 1 Mama Lucy Referral Hospital
Nairobi County
SIGN
100Ø RAINWATER 100Ø RAINWATER DESIGNED BY HWS
DOWNPIPE DOWNPIPE CHECKED BY PG
APPROVED BY ME
DATE APRIL 2017
A B C D E DRAWING NUMBER:

DSU-UNICEF-15-42/MS/DR/02

COPYRIGHT RESERVED
THIS DESIGN AND DETAIL ARE, AND
AT ALL TIMES THE EXCLUSIVE
PROPERTY OF THE UNOPS/EAH,NAIROBI
AND CANNOT BE USED OR REPRODUCED
TENDER DRAWING WITHOUT WRITTEN CONSENT.

Das könnte Ihnen auch gefallen