This document outlines 10 items requiring correction for a storey shelter project. Issues include a non-compliant top door, doors that cannot fully close, bulging door frames, incomplete painting, unfilled voids in blast hatches, non-compliant placement of service conduits, incorrect fasteners used, uncast service casings, and ventilation sleeves not flush with walls. The project reference number and block/unit numbers are provided. Corrections are required for Block 596 levels 3 through 12.
This document outlines 10 items requiring correction for a storey shelter project. Issues include a non-compliant top door, doors that cannot fully close, bulging door frames, incomplete painting, unfilled voids in blast hatches, non-compliant placement of service conduits, incorrect fasteners used, uncast service casings, and ventilation sleeves not flush with walls. The project reference number and block/unit numbers are provided. Corrections are required for Block 596 levels 3 through 12.
This document outlines 10 items requiring correction for a storey shelter project. Issues include a non-compliant top door, doors that cannot fully close, bulging door frames, incomplete painting, unfilled voids in blast hatches, non-compliant placement of service conduits, incorrect fasteners used, uncast service casings, and ventilation sleeves not flush with walls. The project reference number and block/unit numbers are provided. Corrections are required for Block 596 levels 3 through 12.
: A1756-00008-2015-CN01 Block No’s/Unit No : Block 596 Level 3 to 12
REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING
ITEM DESCRIPTION BEFORE AFTER
1. The topmost last shelter door is
not built in accordance to the shelter approved drawing. As such, the topmost last shelter door/door frame cannot be accepted and shall be amended to the design shown in approved shelter drawing. Project Ref. No. : A1756-00008-2015-CN01 Block No’s/Unit No : Block 596 Level 3 to 12
REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING
ITEM DESCRIPTION BEFORE AFTER
2. Shelter door cannot be
completely closed in the CD mode. Shelter main door frame at Staircase 5 level 12, shelter internal door frame at Staircase 5 level 6 and Staircase 6 level 4, shall be replaced. Please ensure that door frames for all other blocks are able to be closed in the CD mode. Project Ref. No. : A1756-00008-2015-CN01 Block No’s/Unit No : Block 596 Level 3 to 12
REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING
ITEM DESCRIPTION BEFORE AFTER
Project Ref. No. : A1756-00008-2015-CN01 Block No’s/Unit No : Block 596 Level 3 to 12
REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING
ITEM DESCRIPTION BEFORE AFTER
3. Bulging door frames are to be
replaced. Please ensure that FYI door frames for all other blocks are not bulging. Project Ref. No. : A1756-00008-2015-CN01 Block No’s/Unit No : Block 596 Level 3 to 12
REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING
ITEM DESCRIPTION BEFORE AFTER
4. Shelter door frame shall be
flushed with the finished floor level as per approved shelter drawings. Project Ref. No. : A1756-00008-2015-CN01 Block No’s/Unit No : Block 596 Level 3 to 12
REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING
ITEM DESCRIPTION BEFORE AFTER
5. Painting of shelter door and
door frame, blast hatch door and door frame are incomplete. Ensure shelter door and ventilation sleeve seals are not coated with paint during subsequent painting. Project Ref. No. : A1756-00008-2015-CN01 Block No’s/Unit No : Block 596 Level 3 to 12
REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING
ITEM DESCRIPTION BEFORE AFTER
Project Ref. No. : A1756-00008-2015-CN01 Block No’s/Unit No : Block 596 Level 3 to 12
REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING
ITEM DESCRIPTION BEFORE AFTER
Project Ref. No. : A1756-00008-2015-CN01 Block No’s/Unit No : Block 596 Level 3 to 12
REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING
ITEM DESCRIPTION BEFORE AFTER
Project Ref. No. : A1756-00008-2015-CN01 Block No’s/Unit No : Block 596 Level 3 to 12
REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING
ITEM DESCRIPTION BEFORE AFTER
Project Ref. No. : A1756-00008-2015-CN01 Block No’s/Unit No : Block 596 Level 3 to 12
REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING
ITEM DESCRIPTION BEFORE AFTER
6 Unfilled voids detected at the
vertical blast hatch frame. Project Ref. No. : A1756-00008-2015-CN01 Block No’s/Unit No : Block 596 Level 3 to 12
REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING
ITEM DESCRIPTION BEFORE AFTER
7. All services conduit shall not
penetrate through the walls and slabs of the Staircase Storey Shelter (S/C SS). Service conduit for electrical and communication fixtures which are located on external S/C SS wall can be embedded in the S/C SS wall. Other than that, all services conduit which do not serve the S/C SS (i.e. PA Speaker system) shall not be embedded within the S/C SS wall and slab. 8 CD approved plastic anchor (HUD-1) shall be used to for all services provided in the S/C SS. Project Ref. No. : A1756-00008-2015-CN01 Block No’s/Unit No : Block 596 Level 3 to 12
REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING
ITEM DESCRIPTION BEFORE AFTER
9 The casings for ceiling services
are not cast within the concrete cover of the shelter wall. As such method statement shall be submitted and approved prior to any rectification works on site. Project Ref. No. : A1756-00008-2015-CN01 Block No’s/Unit No : Block 596 Level 3 to 12