Project Ref. No.

: A1756-00008-2015-CN01
Block No’s/Unit No : Block 596 Level 3 to 12

REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING

ITEM DESCRIPTION BEFORE AFTER

1. The topmost last shelter door is


not built in accordance to the
shelter approved
drawing. As such, the topmost
last shelter door/door frame
cannot be accepted and
shall be amended to the design
shown in approved shelter
drawing.
Project Ref. No. : A1756-00008-2015-CN01
Block No’s/Unit No : Block 596 Level 3 to 12

REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING

ITEM DESCRIPTION BEFORE AFTER

2. Shelter door cannot be


completely closed in the CD
mode. Shelter main door frame
at Staircase 5 level 12, shelter
internal door frame at Staircase
5 level 6 and
Staircase 6 level 4, shall be
replaced. Please ensure that
door frames for all other
blocks are able to be closed in
the CD mode.
Project Ref. No. : A1756-00008-2015-CN01
Block No’s/Unit No : Block 596 Level 3 to 12

REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING

ITEM DESCRIPTION BEFORE AFTER


Project Ref. No. : A1756-00008-2015-CN01
Block No’s/Unit No : Block 596 Level 3 to 12

REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING

ITEM DESCRIPTION BEFORE AFTER

3. Bulging door frames are to be


replaced. Please ensure that
FYI
door frames for all other
blocks are not bulging.
Project Ref. No. : A1756-00008-2015-CN01
Block No’s/Unit No : Block 596 Level 3 to 12

REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING

ITEM DESCRIPTION BEFORE AFTER

4. Shelter door frame shall be


flushed with the finished floor
level as per approved
shelter drawings.
Project Ref. No. : A1756-00008-2015-CN01
Block No’s/Unit No : Block 596 Level 3 to 12

REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING

ITEM DESCRIPTION BEFORE AFTER

5. Painting of shelter door and


door frame, blast hatch door
and door frame are
incomplete. Ensure shelter door
and ventilation sleeve seals are
not coated with
paint during subsequent
painting.
Project Ref. No. : A1756-00008-2015-CN01
Block No’s/Unit No : Block 596 Level 3 to 12

REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING

ITEM DESCRIPTION BEFORE AFTER


Project Ref. No. : A1756-00008-2015-CN01
Block No’s/Unit No : Block 596 Level 3 to 12

REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING

ITEM DESCRIPTION BEFORE AFTER


Project Ref. No. : A1756-00008-2015-CN01
Block No’s/Unit No : Block 596 Level 3 to 12

REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING

ITEM DESCRIPTION BEFORE AFTER


Project Ref. No. : A1756-00008-2015-CN01
Block No’s/Unit No : Block 596 Level 3 to 12

REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING

ITEM DESCRIPTION BEFORE AFTER


Project Ref. No. : A1756-00008-2015-CN01
Block No’s/Unit No : Block 596 Level 3 to 12

REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING

ITEM DESCRIPTION BEFORE AFTER

6 Unfilled voids detected at the


vertical blast hatch frame.
Project Ref. No. : A1756-00008-2015-CN01
Block No’s/Unit No : Block 596 Level 3 to 12

REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING

ITEM DESCRIPTION BEFORE AFTER

7. All services conduit shall not


penetrate through the walls and
slabs of the Staircase
Storey Shelter (S/C SS).
Service conduit for electrical
and communication fixtures
which are located on external
S/C SS wall can be embedded
in the S/C SS wall.
Other than that, all services
conduit which do not serve the
S/C SS (i.e. PA Speaker
system) shall not be embedded
within the S/C SS wall and
slab.
8 CD approved plastic anchor
(HUD-1) shall be used to for all
services provided in
the S/C SS.
Project Ref. No. : A1756-00008-2015-CN01
Block No’s/Unit No : Block 596 Level 3 to 12

REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING

ITEM DESCRIPTION BEFORE AFTER

9 The casings for ceiling services


are not cast within the concrete
cover of the shelter
wall. As such method
statement shall be submitted
and approved prior to any
rectification works on site.
Project Ref. No. : A1756-00008-2015-CN01
Block No’s/Unit No : Block 596 Level 3 to 12

REPLY TO WRITTEN DIRECTION STOREY SHELTER COMMISSIONING

ITEM DESCRIPTION BEFORE AFTER

10 The ventilation sleeves are not


flushed with the shelter internal
walls.