PROJECT NAME:

FIRST FLOOR

FOOTINGS
Mark no. of F1 Ø m L/pc pcs RSB Qty
1.10% F-1 6 16mm 6.00 1.25 14 3.5 21

Legnth of RSB req.: 1.25 m/ pc


output per 6m of RSB: 6m/pc: 4.36 say 4.00 pcs

for 1: F-1: 14 pcs/ F-1 = 3.50 pcs of 6m of 16mmØ

COLUMNS ( footing - to -beam )


Mark no. of C1 Ø m L/pc pcs RSB Qty
1.10% C-1 3 16mm 6.00 8.15 8 12 36

Length of RSB req.: 8.15 m/ pc


output per 6m of RSB: 6m/pc: 1.49 say 1.50 pcs

for 1: C-1: 8 pcs/ F-1 = 12.00 pcs of 6m of 16mmØ

no. of C1 Ø m L/pc pcs RSB Qty


3 10mm 6.00 1.128 55 11 33

Length of RSB req.: 1.128 m/ pc


output per 6m of RSB: 6m/pc: 5.32 say 5.00 pcs

for 1: C-1: 55 pcs/ F-1 = 11.00 pcs of 6m of 16mmØ

Mark no. of C1 Ø m L/pc pcs RSB Qty


1.10% C-1 3 16mm 6.00 8.15 10 15.00 45

Length of RSB req.: 8.15 m/ pc


output per 6m of RSB: 6m/pc: 1.49 say 1.50 pcs

for 1: C-1: 10 pcs/ F-1 = 15.00 pcs of 6m of 10mmØ

no. of C1 Ø m L/pc pcs RSB Qty


3 10mm 6.00 1.128 55 11 33

Length of RSB req.: 1.128 m/ pc


output per 6m of RSB: 6m/pc: 5.32 say 5.00 pcs

for 1: C-1: 55 pcs/ F-1 = 11.00 pcs of 6m of 10mmØ

FOOTING TIE BEAM


Mark Length factor L/pc pcs Qty
PROJECT NAME:

FTB-1 24.4 1.10 : 24.40 6.00 27.00

Length of RSB req.: 24.40 m/ pc


output per 6m of RSB: 6m/pc: 4.47 say 4.50 pcs

for ftb: 6 pcs = 27.00 pcs of 6m of 10mmØ

WALL FOOTING
Mark Length factor L/pc pcs Qty
WF-1/ WF-2 9.1 1.10 : 9.10 3.00 - 6.00

Length of RSB req.: 9.10 m/ pc


output per 6m of RSB: 6m/pc: 1.67 say 2.00 pcs

for ftb: 3 pcs = 6.00 pcs of 6m of 10mmØ

SLAB ON FILL
Mark A B spacing sizes a b
1.10% SOF( interior) 4.20 8.00 0.6 10mm 12 12 24
1.10% SOF( exterior) 1.00 4.00 0.6 10mm 2 2 4
1.10% Septic Tank 3.60 1.50 0.6 10mm 2 2 4

CHB (100 mm x 200 x400 mm)


Mark a b spacing sizes a b
1.10% A-A 4.20 4.10 0.8 10mm 5 5 10
1.10% A-A 1.00 4.10 0.8 10mm 2 2 4
1.10% B-B 2.00 4.10 0.8 10mm 3 3 6
1.10% B-B 1.00 4.10 0.8 10mm 2 2 4
1.10% C-C 1.80 4.10 0.8 10mm 2 2 4
1.10% D-D 4.20 4.10 0.8 10mm 5 5 10
1.10% 1-1 4.00 4.10 0.8 10mm 5 5 10
1.10% 1-1 4.00 4.10 0.8 10mm 5 5 10
1.10% 2-2 1.30 4.10 0.8 10mm 2 2 4
1.10% 3-3 4.00 4.10 0.8 10mm 5 5 10
1.10% 3-3 4.00 4.10 0.8 10mm 5 5 10
1.10% 4-4 4.00 4.10 0.8 10mm 5 5 10
1.10% septic tank 11.70 1.80 0.8 10mm 6 6 12
1.10% lavatory 3.40 1.00 0.8 10mm 1 1 2
PROJECT NAME:

STAIRS
Mark Pieces factor a b c Qty
Landings 1 1.05 : 1.50 1.50 0.15 0.35
STAIR 6 1.10 : 1.50 3.91 0.2 7.74

2ND FLOOR

SLAB
Mark A B spacing sizes a b
1.10% Slab 1 4.20 4.00
1.10% Slab 2 3.70 4.00
1.10% front 2.70 0.80
1.10% sun breaker - 1.10
0

CHB (100 mm x 200 x400 mm)


Mark a b spacing sizes a b
1.10% B-B 5.20 3.00 0.8 10mm 4 4 8
1.10% C-C 5.20 3.00 0.8 10mm 4 4 8
1.10% D-D 4.20 3.00 0.8 10mm 4 4 8
1.10% E-E 4.20 3.00 0.8 10mm 4 4 8
1.10% 1-1 8.00 3.00 0.8 10mm 7 7 14
PROJECT NAME:

1.10% 2-2 4.00 3.00 0.8 10mm 4 4 8


1.10% 3-3 1.30 3.00 0.8 10mm 1 1 2
1.10% 4-4 8.00 3.00 0.8 10mm 7 7 14
1.10% 5-5 4.00 3.00 0.8 10mm 4 4 8
78

2ND FLOOR BEAMS


Mark location Ø Length of Ø L/pc pcs RSB Qty
A B C =B*C =A/B*C*1.10
1.10% B-2 (A-A) 16 6 2.7 7 18.9 4
1.10% B-1 (B-B) 16 6 4.2 8 33.6 7
1.10% CB-1 (B-B) 16 6 1 7 7 2
1.10% B-1 (C-C) 16 6 4.2 8 33.6 7
1.10% CB-1 (C-C) 16 6 1 7 7 2
1.10% B-2 (E-E) 16 6 4.2 7 29.4 6
1.10% B-2 (1-1) 16 6 4 7 28 6
1.10% B-2 (1-1) 16 6 4 7 28 6
1.10% CB-1 (2-2) 16 6 0.8 7 5.6 2
1.10% B-3 (2-2) 16 6 4 7 28 6
1.10% B-1 (2-2) 16 6 4 8 32 6
1.10% B-1 (3-3) 16 6 1.3 8 10.4 2
1.10% CB-1 (4-4) 16 6 0.8 7 5.6 2
1.10% B-1 (4-4) 16 6 4 8 32 6
1.10% B-2 (4-4) 16 6 4 7 28 6
1.10% B-2 (5-5) 16 6 4 7 28 6
76

no. of C1 Ø m L/pc pcs RSB Qty


3 10mm 6.00 1.128 55 11 33

Length of RSB req.: m/ pc


output per 6m of RSB: 6m/pc: say pcs

for 1: set: pcs/ F-1 = pcs of 6m of 10mmØ

ROOF BEAMS
PROJECT NAME:

Mark location factor a b length Qty


RB-1 (B-B) 1.10 : 0.35 0.20 4.2 0.32
CRB-1 (B-B) 1.10 : 0.35 0.20 1 0.08
RB-1 (C-C) 1.10 : 0.35 0.20 4.2 0.32
CRB-1 (C-C) 1.10 : 0.35 0.20 1 0.08
RB-2 (E-E) 1.10 : 0.35 0.20 4.2 0.32
RB-2 (1-1) 1.10 : 0.35 0.20 4 0.31
RB-2 (1-1) 1.10 : 0.35 0.20 4 0.31
RB-2 (2-2) 1.10 : 0.35 0.20 4 0.31
RB-1 (4-4) 1.10 : 0.35 0.20 4 0.31
RB-2 (4-4) 1.10 : 0.35 0.20 4 0.31
RB-2 (5-5) 1.10 : 0.35 0.20 4 0.31
2.98
factor
Class A: 9.00 Cement 0 bags say 0
RB-S 0.45 Sand 0 cu.m. say 0
RB-G 0.85 Gravel 0 cu.m. say 0

VOLUME 34.12 CU.M


50 Coco Lumber 0 BF
2.05 1/4" x 4" x 8' Plywood 0 PCS
1.52 Assorted Nails 0 KGS

=
PROJECT NAME:
10mm 16mm ties

21

36

33

45

33
27.00

6.00

24
4
4

10
4
6
4
4
10
10
10
4
10
10
10
12
2
237 102 0 0
₱250.00 ₱500.00 ₱500.00 ₱15.00
₱59,250.00 ₱51,000.00 ₱0.00 ₱0.00
₱110,250.00

CEMENT SAND GRAVEL CHB


78
0
0
0

78 0 0 0
₱250.00 ₱500.00 ₱500.00 ₱15.00
₱19,500.00 ₱0.00 ₱0.00 ₱0.00
₱19,500.00

₱19,500.00 ₱0.00 ₱0.00 ₱0.00


₱19,500.00
2ND FLOOR

CEMENT
SLAB
Mark factor a b c Qty
Slab 1 - 1.10 : 4.20 4.00 0.10 1.85
Slab 2 1.10 2.70 4.00 0.10 1.19
front - 1.10 : 2.70 0.80 0.10 0.24
right area - 1.10 : 1.00 4.00 0.10 0.44
sun breaker - 1.10 : 0
3.72
factor
Class A: 7.85 Cement 29.20 bags say 30 30
0.42 Sand 1.56 cu.m. say 1.57
0.84 Gravel 3.12 cu.m. say 3.13

SLAB 3.72 CU.M


39.19 Coco Lumber 146 BF
2.13 1/4" x 4" x 8' Plywood 8 PCS
1.49 Assorted Nails 6 KGS

CHB (100 mm x 200 x400 mm)


Mark factor a b c Qty
B-B 1.00 : 5.20 3.00 - 15.6
C-C 1.00 : 5.20 3.00 - 15.6
D-D 1.00 : 4.20 3.00 - 12.6
E-E 1.00 : 4.20 3.00 - 12.6
1-1 1.00 : 8.00 3.00 24
2-2 1.00 : 4.00 3.00 12
3-3 1.00 : 1.30 3.00 3.9
4-4 1.00 : 8.00 3.00 24
5-5 1.00 : 4.00 3.00 - 12
132.3
factor
Class C: 13 CHB 1,719.90 pcs say 1720

0.031 Cement 53.32 bags say 54 54


0.01 Sand 17.20 cu.m. say 17.20

WALL PLASTERING

Area side factor Area from CHB Qty


C-C 2 1.10 15.6 34.32
D-D 2 1.10 15.6 34.32
E-E 2 1.10 12.6 27.72
1-1 2 1.10 12.6 27.72
2-2 2 1.10 24 52.8
3-3 2 1.10 12 26.4
4-4 2 1.10 3.9 8.58
5-5 2 1.10 24 52.8
264.66
factor(dpwh)
Cement 0.113 29.91 say 30.00 30.00
Washed Sand 0.019 5.03 say 5.03

2ND FLOOR BEAMS


Mark location factor a b length Qty
B-2 (A-A) 1.10 : 0.40 0.20 2.7 0.24
B-1 (B-B) 1.10 : 0.40 0.20 4.2 0.37
CB-1 (B-B) 1.10 : 0.40 0.20 1 0.09
B-1 (C-C) 1.10 : 0.40 0.20 4.2 0.37
CB-1 (C-C) 1.10 : 0.40 0.20 1 0.09
B-2 (E-E) 1.10 : 0.40 0.20 4.2 0.37
B-2 (1-1) 1.10 : 0.40 0.20 4 0.35
B-2 (1-1) 1.10 : 0.40 0.20 4 0.35
CB-1 (2-2) 1.10 : 0.40 0.20 0.8 0.07
B-3 (2-2) 1.10 : 0.30 0.20 4 0.26
B-1 (2-2) 1.10 : 0.30 0.20 4 0.26
B-1 (3-3) 1.10 : 0.30 0.20 1.3 0.09
CB-1 (4-4) 1.10 : 0.40 0.20 0.8 0.07
B-1 (4-4) 1.10 : 0.40 0.20 4 0.35
B-2 (4-4) 1.10 : 0.40 0.20 4 0.35
B-2 (5-5) 1.10 : 0.40 0.20 4 0.35
4.03
factor
Class A: 7.85 Cement 31.6355 bags say 32 32
0.42 Sand 1.6926 cu.m. say 1.7
0.84 Gravel 3.3852 cu.m. say 3.39

VOLUME 4.03 CU.M


50 Coco Lumber 202 BF
2.05 1/4" x 4" x 8' Plywood 9 PCS
1.52 Assorted Nails 7 KGS
ROOF BEAMS
Mark location factor a b length Qty
RB-1 (B-B) 1.10 : 0.35 0.20 4.2 0.32
CRB-1 (B-B) 1.10 : 0.35 0.20 1 0.08
RB-1 (C-C) 1.10 : 0.35 0.20 4.2 0.32
CRB-1 (C-C) 1.10 : 0.35 0.20 1 0.08
RB-2 (E-E) 1.10 : 0.35 0.20 4.2 0.32
RB-2 (1-1) 1.10 : 0.35 0.20 4 0.31
RB-2 (1-1) 1.10 : 0.35 0.20 4 0.31
RB-2 (2-2) 1.10 : 0.35 0.20 4 0.31
RB-1 (4-4) 1.10 : 0.35 0.20 4 0.31
RB-2 (4-4) 1.10 : 0.35 0.20 4 0.31
RB-2 (5-5) 1.10 : 0.35 0.20 4 0.31
2.98
factor
Class A: 7.85 Cement 23.393 bags say 24 24
RB-S 0.42 Sand 1.2516 cu.m. say 1.26
RB-G 0.84 Gravel 2.5032 cu.m. say 2.51

VOLUME 34.12 CU.M


50 Coco Lumber 1706 BF
2.05 1/4" x 4" x 8' Plywood 70 PCS
1.52 Assorted Nails 52 KGS

170
x ₱250.00
₱42,500.00
=

₱98,250.00
SAND GRAVEL CHB

1.57
3.13

146
8
6

1,720.00

17.20
5.03

1.7
3.39

202
9
7
1.26
2.51

1706
70
52

26.76 9.03 1720 348 17 13


₱500.00 ₱500.00 ₱15.00 ₱47.00 ₱320.00 ₱58.00
₱13,380.00 ₱4,515.00 ₱25,800.00 ₱16,356.00 ₱5,440.00 ₱754.00
₱86,195.00 ₱22,550.00

₱32,595.00 ₱12,000.00 ₱55,755.00 ₱32,994.00 ₱10,880.00 ₱1,508.00


₱198,600.00 ₱45,382.00
PROJECT NAME:

FIRST FLOOR

FOOTINGS
Mark no. of F1 Ø m/RSB L/pc pcs RSB Qty
A B C D E F
F-1 6 16mm 6.00 1.25 14 3 18

COLUMNS ( footing - to -beam )


Mark no. of C1 Ø m L/pc pcs RSB Qty
A B C D E F
C-1 3 16mm 6.00 8.15 8 11 33

no. of C1 Ø m L/pc pcs RSB Qty


A B C D E F
3 10mm 6.00 1.128 55 11 33

Mark no. of C1 Ø m L/pc pcs RSB Qty


A B C D E F
C-1 3 16mm 6.00 8.15 10 14 42

no. of C1 Ø m L/pc pcs RSB Qty


A B C D E F
3 10mm 6.00 1.128 55 11 33

FOOTING TIE BEAM


Mark Length factor m L/pc pcs Qty
12mm
FTB-1 24.4 1.10 6.00 24.40 6.00 25 25.00

spacing Ø m L/pc pcs RSB Qty


A B C D E F
0.30 10mm 6.00 0.928 82 13 3

WALL FOOTING
Mark Length factor m L/pc pcs Qty
12mm
WF-1/ WF-2 9.1 1.10 6.00 9.10 3.00 5 5.00

spacing Ø m L/pc pcs RSB Qty


A B C D E F
0.30 10mm 6.00 0.25 31 7.75 2

SLAB ON FILL
Mark A B spacing sizes a b
SOF( interior) 4.20 8.00 0.6 10mm 12 12 24
SOF( exterior) 1.00 4.00 0.6 10mm 2 2 4
Septic Tank 3.60 1.50 0.6 10mm 2 2 4
32

CHB (100 mm x 200 x400 mm)


Mark a b spacing sizes a b
A-A 4.20 4.10 0.8 10mm 4 4 8
A-A 1.00 4.10 0.8 10mm 1 1 2
B-B 2.00 4.10 0.8 10mm 2 2 4
B-B 1.00 4.10 0.8 10mm 1 1 2
C-C 1.80 4.10 0.8 10mm 2 2 4
D-D 4.20 4.10 0.8 10mm 4 4 8
1-1 4.00 4.10 0.8 10mm 4 4 8
1-1 4.00 4.10 0.8 10mm 4 4 8
2-2 1.30 4.10 0.8 10mm 2 2 4
3-3 4.00 4.10 0.8 10mm 4 4 8
3-3 4.00 4.10 0.8 10mm 4 4 8
4-4 4.00 4.10 0.8 10mm 4 4 8
septic tank 11.70 1.80 0.8 10mm 5 5 10
lavatory 3.40 1.00 0.8 10mm 1 1 2
84
STAIRS
Mark Pieces factor a b c Qty
Landings 1 1.05 :
STAIR 6 1.10 :

2ND FLOOR

SLAB
Mark A B spacing sizes a b
Slab 1 4.20 4.00
Slab 2 3.70 4.00
front 2.70 0.80
sun breaker - 1.10
0

CHB (100 mm x 200 x400 mm)


Mark a b spacing sizes a b
B-B 5.20 3.00 0.8 10mm 4 4 8
C-C 5.20 3.00 0.8 10mm 4 4 8
D-D 4.20 3.00 0.8 10mm 3 3 6
E-E 4.20 3.00 0.8 10mm 3 3 6
1-1 8.00 3.00 0.8 10mm 5 5 10
2-2 4.00 3.00 0.8 10mm 3 3 6
3-3 1.30 3.00 0.8 10mm 1 1 2
4-4 8.00 3.00 0.8 10mm 5 5 10
5-5 4.00 3.00 0.8 10mm 3 3 6
62

2ND FLOOR BEAMS


Mark location Ø Length of Ø L/pc pcs RSB Qty
A B C =B*C =B*C/A
B-2 (A-A) 16 6 2.7 7 18.9 4
B-1 (B-B) 16 6 4.2 8 33.6 6
CB-1 (B-B) 16 6 1 7 7 2
B-1 (C-C) 16 6 4.2 8 33.6 6
CB-1 (C-C) 16 6 1 7 7 2
B-2 (E-E) 16 6 4.2 7 29.4 5
B-2 (1-1) 16 6 4 7 28 5
B-2 (1-1) 16 6 4 7 28 5
CB-1 (2-2) 16 6 0.8 7 5.6 1
B-3 (2-2) 16 6 4 7 28 5
B-1 (2-2) 16 6 4 8 32 6
B-1 (3-3) 16 6 1.3 8 10.4 2
CB-1 (4-4) 16 6 0.8 7 5.6 1
B-1 (4-4) 16 6 4 8 32 6
B-2 (4-4) 16 6 4 7 28 5
B-2 (5-5) 16 6 4 7 28 5
66

Length of
Mark location ties mm 10mm Qty
beam
A B 1@50 6@100 rest@175
B-2 (A-A) 1.128 2.7 2 12 8 5
B-1 (B-B) 1.128 4.2 4 24 10 8
CB-1 (B-B) 1.128 1 2 12 -2 3
B-1 (C-C) 1.128 4.2 4 24 10 8
CB-1 (C-C) 1.128 1 2 12 -2 3
B-2 (E-E) 1.128 4.2 2 12 17 6
B-2 (1-1) 1.128 4 2 12 16 6
B-2 (1-1) 1.128 4 2 12 16 6
CB-1 (2-2) 1.128 0.8 2 12 -3 3
B-3 (2-2) 0.928 4 2 12 16 5
B-1 (2-2) 1.128 4 2 12 16 6
B-1 (3-3) 1.128 1.3 2 12 0 3
CB-1 (4-4) 1.128 0.8 2 12 -3 3
B-1 (4-4) 1.128 4 2 12 16 6
B-2 (4-4) 1.128 4 2 12 16 6
B-2 (5-5) 1.128 2 12 -8 2
79
ROOF BEAMS
Mark location Ø Length of Ø L/pc pcs RSB Qty
A B C =B*C =B*C/A
RB-1 (B-B) 16 6 4.2 4.00 16.8 3
CRB-1 (B-B) 16 6 1 7.00 7 2
RB-1 (C-C) 16 6 4.2 4.00 16.8 3
CRB-1 (C-C) 16 6 1 7.00 7 2
RB-2 (E-E) 16 6 4.2 5.00 21 4
RB-2 (1-1) 16 6 4 5.00 20 4
RB-2 (1-1) 16 6 4 5.00 20 4
RB-2 (2-2) 16 6 4 5.00 20 4
RB-1 (4-4) 16 6 4 4.00 16 3
RB-2 (4-4) 16 6 4 5.00 20 4
RB-2 (5-5) 16 6 4 5.00 20 4
37

Length of
Mark location ties mm 10mm Qty
beam
A B 1@50 6@100 rest@175
RB-1 (B-B) 1.028 4.2 4 24 10 7
CRB-1 (B-B) 1.028 1 2 12 -2 3
RB-1 (C-C) 1.028 4.2 4 24 10 7
CRB-1 (C-C) 1.028 1 2 12 -2 3
RB-2 (E-E) 1.028 4.2 2 12 17 6
RB-2 (1-1) 1.028 4 2 12 16 6
RB-2 (1-1) 1.028 4 2 12 16 6
RB-2 (2-2) 1.028 4 2 12 16 6
RB-1 (4-4) 1.028 4 2 12 16 6
RB-2 (4-4) 1.028 4 2 12 16 6
RB-2 (5-5) 1.028 4 0 0 23 4
60
10mm 12mm 16mm

18

33

33

42

33

25.00

5.00

2
32

84
187 30 93

10mm 16mm

62
66

79
37

60

139 0 103
PROJECT NAME: 2 STOREY- 2 ROOM HOUSE

FIRST FLOOR
CEMENT
SOIL POISONING
RC PIPES

GRAVEL FILL
Mark factor a b c Qty
SOF( interior) - 1.10 : 4.20 8.00 0.1 3.7
SOF( exterior) - 1.10 : 1.00 4.00 0.1 0.44
Footings 6 1.10 : 1.40 1.40 0.1 1.29
5.43
FOOTINGS
Mark Pieces factor a b c Qty
F-1 6 1.10 : 1.40 1.40 0.35 4.53
factor
Class A: 9.00 Cement 40.77 bags say 41 41
0.45 Sand 2.0385 cu.m. say 2.04
0.85 Gravel 3.8505 cu.m. say 3.86

COLUMNS (up to 2nd floor )


Mark Pieces factor a b c Qty
C-1 6 1.10 : 0.20 0.40 7.55 3.99
factor
Class A: 9.00 Cement 35.91 bags say 36 36
0.45 Sand 1.7955 cu.m. say 1.8
0.85 Gravel 3.3915 cu.m. say 3.4

48.113 Coco Lumber 192 BF


2.177 1/4" x 4" x 8' Plywood 9 PCS
1.524 Assorted Nails 7 KGS

FTB & WALL FOOTING


Mark location factor a b length Qty
FTB (A-A) 1.10 : 0.20 0.30 4.2 0.28
WF-1 (A-A) 1.10 : 0.30 0.15 1 0.05
WF-1 (B-B) 1.10 : 0.30 0.15 1 0.05
WF-2 (C-C) 1.10 : 0.30 0.15 1.8 0.09
FTB (D-D) 1.10 : 0.20 0.30 4.2 0.28
FTB (1-1) 1.10 : 0.20 0.30 4 0.26
FTB (1-1) 1.10 : 0.20 0.30 4 0.26
WF-2 (2-2) 1.10 : 0.30 0.15 1.3 0.06
FTB (3-3) 1.10 : 0.20 0.30 4 0.26
FTB (3-3) 1.10 : 0.20 0.30 4 0.26
WF-1 (4-4) 1.10 : 0.30 0.15 4 0.2
septic tank 1.10 : 0.30 0.15 11.7 0.58
2.63
factor
Class A: 9.00 Cement 23.67 bags say 24 24
0.45 Sand 1.1835 cu.m. say 1.19
0.85 Gravel 2.2355 cu.m. say 2.24

FTB: 1.6 CU.M


50 Coco Lumber 80 BF
2.045 1/4" x 4" x 8' Plywood 4 PCS
1.534 Assorted Nails 3 KGS

SLAB ON FILL
Mark factor a b c Qty
SOF( interior) - 1.10 : 4.20 8.00 0.1 3.7
SOF( exterior) - 1.10 : 1.00 4.00 0.1 0.44
Septic Tank - 1.10 : 3.60 1.50 0.1 0.59
Sunbreaker - 1.10 : 0
4.73
factor
Class C: 9.00 Cement 42.57 bags say 43 43
0.45 Sand 2.1285 cu.m. say 2.13
0.85 Gravel 4.0205 cu.m. say 4.03

CHB (100 mm x 200 x400 mm)


location side factor a b c Qty
A-A 1 1.00 : 4.20 4.10 - 17.22
A-A 1 1.00 : 1.00 4.10 4.1
B-B 1 1.00 : 2.00 4.10 - 8.2
B-B 1 1.00 : 1.00 4.10 - 4.1
C-C 1 1.00 : 1.80 4.10 - 7.38
D-D 1 1.00 : 4.20 4.10 - 17.22
1-1 1 1.00 : 4.00 4.10 - 16.4
1-1 1 1.00 : 4.00 4.10 - 16.4
2-2 1 1.00 : 1.30 4.10 - 5.33
3-3 1 1.00 : 4.00 4.10 - 16.4
4-4 1 1.00 : 4.00 4.10 - 16.4
septic tank 1 1.00 : 11.70 1.80 - 21.06
lavatory 1 1.00 : 3.40 1.00 - 3.4
153.61
factor
Class C: 13 CHB 1,996.93 pcs say 1997

0.031 Cement 61.91 bags say 62 62


0.01 Sand 19.97 cu.m. say 19.97

WALL PLASTERING

Area side factor Area from CHB Qty


A-A 2 1.10 17.22 37.88
A-A 2 1.10 4.1 9.02
B-B 2 1.10 8.2 18.04
B-B 2 1.10 4.1 9.02
C-C 2 1.10 7.38 16.24
D-D 2 1.10 17.22 37.88
1-1 2 1.10 16.4 36.08
1-1 2 1.10 16.4 36.08
2-2 2 1.10 5.33 11.73
3-3 2 1.10 16.4 36.08
4-4 2 1.10 16.4 36.08
lavatory 2 1.10 3.4 7.48
291.61
factor
Cement 0.113 32.95 say 33.00 33.00
Washed Sand 0.019 5.54 say 5.55

STAIRS
Mark Pieces factor a b c Qty
Landings 1 1.05 : 1.50 1.50 0.15 0.35
STAIR 1.10 : 1.50 3.91 0.2 1.29
1.64
factor
Class A: 9.00 Cement 14.76 bags say 15 15
0.45 Sand 0.738 cu.m. say 0.74
0.85 Gravel 1.394 cu.m. say 1.4

VOLUME: 1.64 CU.M


50 Coco Lumber 82 BF
2.3 1/4" x 4" x 8' Plywood 4 PCS
1.61 Assorted Nails 3 KGS

254
x ₱250.00
₱63,500.00
=
2ND FLOOR

CEMENT
SLAB
Mark factor a b c Qty
Slab 1 - 1.10 : 4.20 4.00 0.10 1.85
Slab 2 1.10 2.70 4.00 0.10 1.19
front - 1.10 : 2.70 0.80 0.10 0.24
right area - 1.10 : 1.00 4.00 0.10 0.44
sun breaker - 1.10 : 0
3.72
factor
Class A: 9.00 Cement 33.48 bags say 34 34
0.45 Sand 1.67 cu.m. say 1.68
0.85 Gravel 3.16 cu.m. say 3.17

SLAB 3.72 CU.M


39.19 Coco Lumber 146 BF
2.13 1/4" x 4" x 8' Plywood 8 PCS
1.49 Assorted Nails 6 KGS

CHB (100 mm x 200 x400 mm)


Mark factor a b c Qty
B-B 1.00 : 5.20 3.00 - 15.6
C-C 1.00 : 5.20 3.00 - 15.6
D-D 1.00 : 4.20 3.00 - 12.6
E-E 1.00 : 4.20 3.00 - 12.6
1-1 1.00 : 8.00 3.00 24
2-2 1.00 : 4.00 3.00 12
3-3 1.00 : 1.30 3.00 3.9
4-4 1.00 : 8.00 3.00 24
5-5 1.00 : 4.00 3.00 - 12
132.3
factor
Class C: 13 CHB 1,719.90 pcs say 1720

0.031 Cement 53.32 bags say 54 54


0.01 Sand 17.20 cu.m. say 17.20
WALL PLASTERING

Area side factor Area from CHB Qty


C-C 2 1.10 15.6 34.32
D-D 2 1.10 15.6 34.32
E-E 2 1.10 12.6 27.72
1-1 2 1.10 12.6 27.72
2-2 2 1.10 24 52.8
3-3 2 1.10 12 26.4
4-4 2 1.10 3.9 8.58
5-5 2 1.10 24 52.8
264.66
factor(dpwh)
Cement 0.113 29.91 say 30.00 30.00
Washed Sand 0.019 5.03 say 5.03

2ND FLOOR BEAMS


Mark location factor a b length Qty
B-2 (A-A) 1.10 : 0.40 0.20 2.7 0.24
B-1 (B-B) 1.10 : 0.40 0.20 4.2 0.37
CB-1 (B-B) 1.10 : 0.40 0.20 1 0.09
B-1 (C-C) 1.10 : 0.40 0.20 4.2 0.37
CB-1 (C-C) 1.10 : 0.40 0.20 1 0.09
B-2 (E-E) 1.10 : 0.40 0.20 4.2 0.37
B-2 (1-1) 1.10 : 0.40 0.20 4 0.35
B-2 (1-1) 1.10 : 0.40 0.20 4 0.35
CB-1 (2-2) 1.10 : 0.40 0.20 0.8 0.07
B-3 (2-2) 1.10 : 0.30 0.20 4 0.26
B-1 (2-2) 1.10 : 0.30 0.20 4 0.26
B-1 (3-3) 1.10 : 0.30 0.20 1.3 0.09
CB-1 (4-4) 1.10 : 0.40 0.20 0.8 0.07
B-1 (4-4) 1.10 : 0.40 0.20 4 0.35
B-2 (4-4) 1.10 : 0.40 0.20 4 0.35
B-2 (5-5) 1.10 : 0.40 0.20 4 0.35
4.03
factor
Class A: 9.00 Cement 36.27 bags say 37 37
0.45 Sand 1.8135 cu.m. say 1.82
0.85 Gravel 3.4255 cu.m. say 3.43

VOLUME 4.03 CU.M


50 Coco Lumber 202 BF
2.05 1/4" x 4" x 8' Plywood 9 PCS
1.52 Assorted Nails 7 KGS

ROOF BEAMS
Mark location factor a b length Qty
RB-1 (B-B) 1.10 : 0.35 0.20 4.2 0.32
CRB-1 (B-B) 1.10 : 0.35 0.20 1 0.08
RB-1 (C-C) 1.10 : 0.35 0.20 4.2 0.32
CRB-1 (C-C) 1.10 : 0.35 0.20 1 0.08
RB-2 (E-E) 1.10 : 0.35 0.20 4.2 0.32
RB-2 (1-1) 1.10 : 0.35 0.20 4 0.31
RB-2 (1-1) 1.10 : 0.35 0.20 4 0.31
RB-2 (2-2) 1.10 : 0.35 0.20 4 0.31
RB-1 (4-4) 1.10 : 0.35 0.20 4 0.31
RB-2 (4-4) 1.10 : 0.35 0.20 4 0.31
RB-2 (5-5) 1.10 : 0.35 0.20 4 0.31
2.98
factor
Class A: 9.00 Cement 26.82 bags say 27 27
RB-S 0.45 Sand 1.341 cu.m. say 1.35
RB-G 0.85 Gravel 2.533 cu.m. say 2.54

VOLUME 34.12 CU.M


50 Coco Lumber 1706 BF
2.05 1/4" x 4" x 8' Plywood 70 PCS
1.52 Assorted Nails 52 KGS

182
x ₱250.00
₱45,500.00
=

₱109,000.00
SAND GRAVEL CHB LUMBER PLYWOOD NAILS

5.43

2.04
3.86

1.8
3.4

192
9
7
1.19
2.24

80
4
3

2.13
4.03

1,997.00

19.97
5.55

0.74
1.4

82
4
3

38.85 14.93 1997 354 17 13


₱500.00 ₱500.00 ₱15.00 ₱47.00 ₱320.00 ₱58.00
₱19,425.00 ₱7,465.00 ₱29,955.00 ₱16,638.00 ₱5,440.00 ₱754.00
₱120,345.00 ₱22,832.00

SAND GRAVEL CHB

1.68
3.17

146
8
6
1,720.00

17.20
5.03

1.82
3.43

202
9
7
1.35
2.54

1706
70
52

27.08 9.14 1720 348 17 13


₱500.00 ₱500.00 ₱15.00 ₱47.00 ₱320.00 ₱58.00
₱13,540.00 ₱4,570.00 ₱25,800.00 ₱16,356.00 ₱5,440.00 ₱754.00
₱89,410.00 ₱22,550.00

₱32,965.00 ₱12,035.00 ₱55,755.00 ₱32,994.00 ₱10,880.00 ₱1,508.00


₱209,755.00 ₱45,382.00