NOTES AND SPECIFICATIONS

W201

R2.2
YELLOW 150mm

600 100
300
300

600
R2.2
2000
850

450 3500
R2.1
150 2500

300
600 600

300
2000

60m - 80m
R2.1

2500mm - 50/60 Km/h


4000mm - 70/120 Km/h

60m - 80m
RTM 2
W201
R2.1
R2.2
R2.2

RTM 2 DETAIL
W201

R2.1

R2.1
AMENDMENTS
NR. DATE APPROVED DESCRIPTION PAR.

R2.2
DESIGNED DRAWN
C.B. RAMEKANE
S. AUDIE
SIGNATURE:......................................................................... DATE:....................................

DESIGN CHECKED BY INFRASTRUCTURE TECHNICAL INFORMATION


P. A. ODENDAAL Pr.Eng. MANAGEMENT
D.J. CHALMERS

SIGNATURE:......................................................................... DATE:.................................... SIGNATURE:......................................................................... DATE:....................................

PROJECT STATUS
600 600 600

CONCEPT TENDER APPROVED FOR AS BUILT


DRAWING DRAWING CONSTRUCTION DRAWING
DRAWING
PROJECT ENGINEER ( CONSULTANT)
R2.1

................................................................................ ................................................................................ ..............................................................


INITIALS AND SURNAME SIGNATURE AND Pr. No. DATE

W201
R2.1
INSPECTOR OF WORKS (CITY OF TSHWANE):
R2.1
................................................................................ ................................................................................ ..............................................................
INITIALS AND SURNAME SIGNATURE AND Pr. No. DATE

R2.2
W201 CONSULTANT DETAIL

R2.2
60m - 80m RTM 4 DETAIL
R2.1
NOTE:
CITY OF TSHWANE
PAINTED PEDESTRIAN CROSSINGS ONLY AT 4-WAY
60m - 80m

INTERSECTIONS WHEN SPECIFIED.THIS IS A TYPICAL


ROADS AND TRANSPORT DEPARTMENT
Mr P. Letlonkane Ms. L. V. Kegakilwe-Piki
LAYOUT OF A MINI-CIRCLE WITH PEDESTRIAN CROSSING AT A GENERIC STRATEGIC EXECUTIVE EXECUTIVE DIRECTOR
INTERSECTION. DIRECTOR
P.O. BOX 1409 P.O. BOX 1409
THE TRAFFIC ENGINEERING AND OPERATION SECTION
PRETORIA PRETORIA
MUST ALWAYS BE CONSULTED TO ASSIST WITH THE 0001 0001
SETTING OUT OF TRAFFIC CALMING MEASURES. DRAWING APPROVED BY EXECUTIVE DIRECTOR
Ms. L. V. Kegakilwe-Piki

WM 5 - 50 / 60Km/h - 2500mm SIGNATURE:............................................................................. DATE:......................................................

70 /120 Km/h -4000mm LOCATION OF PROJECT:

TYPICAL STANDARD
ROADS AND STORMWATER
For Internal Approval
RECIEVED
SIGN WHEN APPLICABLE
DETAILS
DIRECTOR: INFRASTRUCTURE PROVISION DESCRIPTION OF PROJECT

SIGNATURE DATE

DIRECTOR: INFRASTRUCTURE CONSTRUCTION (PROJECT) MANAGEMENT


TRAFFIC CALMING
R2.1 SIGNATURE

DIRECTOR: INFRASTRUCTUREASSET MANAGEMENT


DATE
MEASURES
SIGNATURE DATE
MINI-CIRCLE DETAILS (3)
W201
DIRECTOR: TRANSPORT INFRASTRUCTURE PLANNING
BELLMOUTH 9,0m TO 11,0m
SIGNATURE DATE
CONTRACT No. : PROJECT No. :
DIRECTOR: INTELLIGENT TRANSPORT SYSTEN AND TRAFFIC ENGINEERING
ENGINEERING

SIGNATURE DATE

DIRECTOR: INFRASTRUCTURE MAINTENANCE MANAGEMENT (IMM) DATE : SCALE : ORIGINAL PAPER SIZE:

TYPICAL LAYOUT OF 4-LEGGED MINI-CIRCLE WITH PAINTED PEDESTRIAN CROSSING SIGNATURE DATE MAY 2013
DRAWING NO.
AS SHOWN A1
SHEET NO:
SCALE 1: 100 0
STD016 5 OF 7 REVISION