A Proposal by SixthSenseData
1 What we discussed
4 Commercials
Our Approach
Seamless integration of datasets with rapid querying and transformation as specified.
We propose a 9 week Build, Deploy and Live support phase
Requirements- What we discussed
Project Execution Phase: Using Image Analytics to ensure adherence to quality, time and cost
efficiency
Use Case: In any tower erection, some 2-2.5K bolts are tacked in each tower. Currently one person
would take images of the tower from the ground level, and make a quasi-objective assessment of the
erected tower. Any faulty tacking process could lead to tower outage or unstable erection, resulting in
subsequent loss.
Solution: A drone driven elevated multi-angle imagery, with pre-defined tower elevation and other
criteria type, which will be fed to a custom algorithm for image processing.
Benefits: Gang dependency reduction / quality adherence / on-schedule project execution / asset
rationalization / cost efficiency
SSD Vision for Sterlite to work with intelligent data
PHASE
Pilot
1
Image Analytics POC Automated Image and data led predictive Intelligent Image
analytics analytics
• Create a POC leveraging “Computer
• Extend and complete create comprehensive image Maintenance
Vision” to gauge quality of “fitting of
analytics bank and finalize variables platform
bolt”
• Onload all historical defect data into the platform
• Perform data tagging for existing bolt
• Automate the process of reading inspection data,
images library to outline
applying business rules
• Identify through analytics model
• Create relevant predictive analytics and ML models
wrongly fitted bolt data
• Necessary Dashboarding
Pilot Scope – management
dashboard reporting
1 2 3
• Development / Modifications / Enhancements to any of the existing systems, applications, ETL and components related to the process in scope, or any other processes
• Tool Training
• Data Quality fix / Data Profiling / Data Cleansing & Data Governance
• Creation of Calculated Columns for the report. We assume that the QV Data Model is complete & will cater to the current reporting needs.
• Software Installation, Configuration & Environment set-up for DEV, SIT, UAT and production
W1 W2 W3 W4 W5 W6 W7 W8 W9
Vision Data Model
Logical Data model
Development
Testing and UAT
Production Support
Scope for Delivering Proof of Concept
Scope
Functional Requirements
Technical Requirements
1. Create a “Computer Vision” led image identification
framework • The POC will be hosted on cloud
• Performance requirements will be determined
2. Perform necessary tagging and mapping for single image
and mutually agreed upon in the requirements
3. Create a Data model and logical structure for the defect
classification and attribute mapping phase of the project
• Input file formats are considered to be the
4. Create image analytics model based on library data for
singular type of defect . same as the sample files provided by Sterlite
• Since this is a POC, no separate development
5. Develop dashboarding and visualization for extracted data
and Production environments are considered
and insights for the defect and image
Out of Scope
11
Assumptions and Dependencies
GeneralAssumptions
• SSD assumes that Sterlite Business Personnel & Technical Subject Matter Experts (SMEs) would be available for meetings and
clarifications sessions as per the project plan developed by SSD PM
• Requirements will be reviewed finalized and mutually agreed in the 1st week of the engagement
• Report templates would be finalized during the initial requirements analysis phase
Data Assumptions
• Data is expected to be complete and void of data quality issues
• Sterlite will furnish the look-up or the master data needed for reporting and loading
• Sterlite shall own the data validation of the base data
Testing
• Sterlite will develop UAT test cases in the design phase of the project
Risks and Mitigation Approach
Risk Severity Impact Mitigation
Non availability of the infrastructure like Expect this to be non issue because of the usage of
software, hardware, seat, connectivity to High This may lead to delay in project cloud environment. SSD expects to have the
SSD team as per schedule environment ready by design phase
SSD will arrange read out session for all the critical
deliverable documents. Sterlite to provide a dedicated
Delay in review and sign off of the
High All the down stream activities will be delayed project manager/coordinator to anchor Sterlite
version of the deliverables.
dependencies and for interim reviews and sign off
deliverables within 2 days of submission