Beruflich Dokumente
Kultur Dokumente
KAJI S
Time
Rate each meter, reading in " H2O Rate Cumm Pressure Rate Cumm Pressure
300 Q1 Skimmer A/C 10 RB/2RB A/B 400 Q3 BPH Bbls Suct Pump Manifold BPH Bbls Suct
waterinjection@kaji
19 23.0 1371 24 1617 2988 56765 45 1015 1010 4785 90915 60
20 23.0 1371 24 1617 2988 59753 45 1015 1010 4785 95700 60
21 23.0 1371 24 1617 2988 62741 45 1015 1010 4785 100485 60
22 23.0 1371 20.6 17.2 24 1617 2988 65728 45 1015 1010 4785 105270 60
23 23.0 1371 24 1617 2988 68716 45 1015 1010 4785 110055 60
24 23.0 1371 21.9 17 24 1617 2988 71704 45 1015 1010 4785 114840 60
Total 552 32,899 38,805 71,704 71703.658079 147,111 24,360 24,240 114840 114,840 1,440
bio/cor smg
bio/cor kaji
waterinjection@kaji
PRODUCE WATER SURFACE WATER
Psi Psi CM CM CM CM
1010 960 495 515 100 470 29.5 336.92797 3 130.127850789 0 0 0 0 0 0 ###
waterinjection@kaji
1010 960 30 339.7713 10 237.579864123 0 0 0 0 0 0
1010 960
Produce Water
Semoga 6,746 a
Satellite Kaji 4,173 b
TOTAL 10,919
H X DIFF RANGE X FB
50
= HW/Jam
42
H = Pembacaan di Chart
FB = Orifice Factor
waterinjection@kaji
Rate W.I Satelit Kaji
25 June 2018
0 362.125 0 390 306.041667 355 370 370 375 370 365 370 275 0 367.125 0 ### 370
12 13 14
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360
380 370 360