No Document No. Document Title Rev
Produced Water Pumps & Motor P-
1. KTA.TB-PAC03-M20-002 1 4 -
102 A/B Datasheet
Water Pump & Motor datasheet for
2. KTA.TB-PAC03-M20-006 0 4 -
Cooling water system
Glycol Pump Datasheet (Glycol
3. KTA.TB-PAC03-M20-008 0 4 -
Make-up)
Air Cooler Datasheet for Cooling
4. KTA.TB-PAC03-M19-017 0 4 -
water system
5. KTA.TB-PAC03-J13-004 Instrument Datasheet 0 4 -
Page 1 of 4
TIEN HAI – THAI BINH LOW PRESSURE GAS
DISTRIBUTION PIPELINE SYSTEM PROJECT
CM Next
No Document No. Document Title Rev
Distribution Board Arrangement
18. KTA.TB-PAC03-J01-001 0 4 -
Drawing
19. KTA.TB-PAC03-M65-001 Painting Specification B 4 0
Page 2 of 4
TIEN HAI – THAI BINH LOW PRESSURE GAS
DISTRIBUTION PIPELINE SYSTEM PROJECT
CM Next
No Document No. Document Title Rev
WELD MAP- GLYCOL MAKE-
41. KTA.TB-PAC03-Q26-018 0 4 -
UP TANK
WELD MAP for Drawing
42. KTA.TB-PAC03-Q26-019 0 4 -
Chemical Injection Skid
Weld - NDT Map for Cooling
43. KTA.TB-PAC03-Q26-020 0 4 -
System
44. KTA.TB-PAC03-J28-001 BMS data sheet for hot water stove 0 4 -
PVGASD’s approval of any work/documentation shall in no way relieve AECC and/or VENDORS/SUPLLIERS of
any responsibility for performing the provisions of equipment/package in accordance with the project
requirements and relevant design documents.
*Notes:
1.Closed: Agreed, no further comments
2.Open: Still under discussion
3.For those comment sheet with code 2 from Company, if Contractor/Vendoragreed with all comments from
Company. Contractor/Vendor shall respond the comment sheet,revise and upgrade the document revision
to higher revision. The response sheet shall be attached to the document when submitting to Company.
4.For those comment sheet with code 2 from Company, if Contractor/Vendor disagreed with Company
comments. Contractor/Vendor shall have a discipline meeting with Company to finalize and sign off the
comment sheet, then revise and upgrade the document revision to higher revision. The response sheet shall
be attached to the document when submitting to Company.
REVIEW COMMENTS:
No. Company comments Contractor/Vendor Response Closed/ Open
1. Closed
Page 3 of 4
TIEN HAI – THAI BINH LOW PRESSURE GAS
DISTRIBUTION PIPELINE SYSTEM PROJECT
Commented
by
Phan Thị Hải Giang Le Dinh Binh
Checked by
Phan Thị Hải Giang
Page 4 of 4