TIEN HAI – THAI BINH LOW PRESSURE GAS

DISTRIBUTION PIPELINE SYSTEM PROJECT

COMMENT SHEET NO.: KTA.TB-PAC03-137.1

Comment sheet for Transmittal No.: KTA.TB-PAC03-AECC-PVGASD-T-373 379, T-


380383
Transmittal’s Issue date: 06/2015
Comment Sheet’s Issue date: 18/06/2015

CM Next
No Document No. Document Title Rev
Produced Water Pumps & Motor P-
1. KTA.TB-PAC03-M20-002 1 4 -
102 A/B Datasheet
Water Pump & Motor datasheet for
2. KTA.TB-PAC03-M20-006 0 4 -
Cooling water system
Glycol Pump Datasheet (Glycol
3. KTA.TB-PAC03-M20-008 0 4 -
Make-up)
Air Cooler Datasheet for Cooling
4. KTA.TB-PAC03-M19-017 0 4 -
water system
5. KTA.TB-PAC03-J13-004 Instrument Datasheet 0 4 -

6. KTA.TB-PAC03-J21-001 Narative Functional Analysis 0 4 -


Pre-com/Commissioning and Start-
7. KTA.TB-PAC03-Q20-001 B 4 0
up Procedures
PRODUCED WATER PUMP P-
102 A/B ELECTRIC MOTOR
8. KTA.TB-PAC03-M26-005 LAYOUT WITH NAMEPLATE 0 4 -
AND TERMINAL BOX
DRAWING
LIST OF SPARE PARTS FOR 2
9. KTA.TB-PAC03-G03-001 0 4 -
YEARS OPERATION
10. KTA.TB-PAC03-M19-024 Cooling Water System 0 4 -
EQUIPMENT LAYOUT OIL
11. KTA.TB-PAC03-M24-013 WASTE WATER TREATMENT 0 4 -
SYSTEM
12. KTA.TB-PAC03-J19-001 I/O list 0 4 -

13. KTA.TB-PAC03-J22-002 Instrument cable schedule 0 4 -

14. KTA.TB-PAC03-J13-003 Junction Box Datasheet 0 4 -


SPECIFICATION FOR
15. KTA.TB-PAC03-M65-008 B 4 0
INSULATION
16. KTA.TB-PAC03-J19-002 Modbus mapping 0 4 -

17. KTA.TB-PAC03-J14-001 So do dieu khien - Bon nuoc nong 0 4 -

Page 1 of 4
TIEN HAI – THAI BINH LOW PRESSURE GAS
DISTRIBUTION PIPELINE SYSTEM PROJECT

CM Next
No Document No. Document Title Rev
Distribution Board Arrangement
18. KTA.TB-PAC03-J01-001 0 4 -
Drawing
19. KTA.TB-PAC03-M65-001 Painting Specification B 4 0

20. KTA.TB-PAC03-M35-001 GA Drawing- Contactor - C-101 0 4 -

21. KTA.TB-PAC03-M35-002 GA Drawing-Still column- C-102 0 4 -


GA Drawing-Stripping column- C-
22. KTA.TB-PAC03-M35-003 0 4 -
103
GA Drawing-Feed gas heater -E-
23. KTA.TB-PAC03-M35-004 0 4 -
101
GA Drawing-Still reflux condenser
24. KTA.TB-PAC03-M35-005 0 4 -
-E-104
GA Drawing-Lean Glycol cooler-
25. KTA.TB-PAC03-M35-007 0 4 -
E-106
26. KTA.TB-PAC03-M35-008 GA Drawing-Flash drum - V-101 0 4 -
GA Drawing-Glycol reboiler - V-
27. KTA.TB-PAC03-M35-009 0 4 -
102
28. KTA.TB-PAC03-M35-010 GA Drawing-Surge drum - V-103 0 4 -

29. KTA.TB-PAC03-M35-011 GA Drawing-Reflux drum - V-104 0 4 -


GA Drawing-Glycol filter - F-
30. KTA.TB-PAC03-M35-012 0 4 -
101A/B
General Arrangement Drawing for
31. KTA.TB-PAC03-M35-030 0 4 -
Cooling Water System
32. KTA.TB-PAC03-M35-013 Detail Drawing- Contactor - C-101 C 4 0
Detail Drawing- Still column- C-
33. KTA.TB-PAC03-M35-014 C 4 0
102
Detail Drawing- Stripping column-
34. KTA.TB-PAC03-M35-015 C 4 0
C-103
Detail Drawing- Feed gas heater
35. KTA.TB-PAC03-M35-016 C 4 0
-E-101
Detail Drawing- Still reflux
36. KTA.TB-PAC03-M35-017 C 4 0
condenser-E-104
Detail Drawing- Lean Glycol
37. KTA.TB-PAC03-M35-019 C 4 0
cooler- E-106
Detail Drawing- Flash drum - V-
38. KTA.TB-PAC03-M35-020 C 4 0
101
Detail Drawing- Glycol reboiler -
39. KTA.TB-PAC03-M35-021 C 4 0
V-102
Detail Drawing- Surge drum- V-
40. KTA.TB-PAC03-M35-022 C 4 0
103

Page 2 of 4
TIEN HAI – THAI BINH LOW PRESSURE GAS
DISTRIBUTION PIPELINE SYSTEM PROJECT

CM Next
No Document No. Document Title Rev
WELD MAP- GLYCOL MAKE-
41. KTA.TB-PAC03-Q26-018 0 4 -
UP TANK
WELD MAP for Drawing
42. KTA.TB-PAC03-Q26-019 0 4 -
Chemical Injection Skid
Weld - NDT Map for Cooling
43. KTA.TB-PAC03-Q26-020 0 4 -
System
44. KTA.TB-PAC03-J28-001 BMS data sheet for hot water stove 0 4 -

45. KTA.TB-PAC03-M26-011 Closed Drain System Design 0 4 -

46. KTA.TB-PAC03-Q02-001 Quality Plan D 4 0


QUY TRÌNH KIỂM SOÁT SẢN
47. KTA.TB-PAC03-Q02-002 PHẨM KHÔNG PHÙ HỢP VÀ A 4 0
SỰ KHÔNG PHÙ HỢP
QUY TRÌNH KIỂM SOÁT HÀNH
48. KTA.TB-PAC03-Q02-003 ĐỘNG KHẮC PHỤC VÀ PHÒNG A 4 0
NGỪA
49. KTA.TB-PAC03-Q21-001 Factory Acceptance Test Procedure 0 4 -
Site Factory Acceptance Test
50. KTA.TB-PAC03-Q21-003 0 4 -
Procedure
Skid Assembly and Installation
51. KTA.TB-PAC03-Q25-001 B 4 0
Procedure
*Review Status:
1. Approved.2. Approved with comments. 3. Rejected. 4. For Information.

PVGASD’s approval of any work/documentation shall in no way relieve AECC and/or VENDORS/SUPLLIERS of
any responsibility for performing the provisions of equipment/package in accordance with the project
requirements and relevant design documents.

*Notes:
1.Closed: Agreed, no further comments
2.Open: Still under discussion
3.For those comment sheet with code 2 from Company, if Contractor/Vendoragreed with all comments from
Company. Contractor/Vendor shall respond the comment sheet,revise and upgrade the document revision
to higher revision. The response sheet shall be attached to the document when submitting to Company.
4.For those comment sheet with code 2 from Company, if Contractor/Vendor disagreed with Company
comments. Contractor/Vendor shall have a discipline meeting with Company to finalize and sign off the
comment sheet, then revise and upgrade the document revision to higher revision. The response sheet shall
be attached to the document when submitting to Company.

REVIEW COMMENTS:
No. Company comments Contractor/Vendor Response Closed/ Open
1. Closed

Page 3 of 4
TIEN HAI – THAI BINH LOW PRESSURE GAS
DISTRIBUTION PIPELINE SYSTEM PROJECT

Company names and Contractor/Vendor names


signatures and signatures

Commented
by
Phan Thị Hải Giang Le Dinh Binh

Checked by
Phan Thị Hải Giang

Page 4 of 4