Beruflich Dokumente
Kultur Dokumente
FM 427 Rev. 0
PROJECT: Toka Tindung 3MTPA Expansion – SMP Package PREPARED DATE APPROVED DATE APPROVED DATE REV
OP DESCRIPTION OF PROCESS AND RESP. CONTROL ACCEPTANCE CERTIFY – VERIFY DOCUMENT EPITERMA PT.TTN INSPECTOR Nom/Drawing
No. INSPECTION ACTIVITY DOCUMENT CRITERIA Referensi
MDR ACT SIGN ACT SIGN
Design Drawing
1981-000-MELST-0001 JIS G3192
2.1 Verify all incoming material for tank MC Packing List - M R
1981-000-MELST-0005 JIS G3193
ASTM A6
1981-000-MELST-0001
2.2 Checking for completed material MC Transmittal Assembly List - M R
1981-000-MELST-0005
Visual
Check of the material quality (free Material check list/1981- Receiving material
2.3 MC Inspection/1981- Yes M R
damage or broken) MESPC-0042 checklist
000-MESPC-0042
RESPONSBILITY QA/QC = QUALITY ASSURANCE/CONTROL E = ENGINEERING SP = SUPERVISOR MC = MATERIAL CONTROL PM = PROJECT MANAGER
EMK
FM 427 Rev. 0
PROJECT: Toka Tindung 3MTPA Expansion – SMP Package PREPARED DATE APPROVED DATE APPROVED DATE REV
OP DESCRIPTION OF PROCESS AND RESP. CONTROL ACCEPTANCE CERTIFY – VERIFY DOCUMENT EPITERMA PT.TTN INSPECTOR Nom/Drawing
No. INSPECTION ACTIVITY DOCUMENT CRITERIA Referensi
MDR ACT SIGN ACT SIGN
1981-000-SCSPC-
0002 Foundation
Foundation check and level as
3.1 SP Civil Design Drawing Checklist + Survey Yes M R
drawing 1981-000-SSSPC- Report
0002
1981-000-SCSPC-
0002 Foundation
Check of radius foundation as
3.2 SP Civil Design Drawing Checklist + Survey Yes M R
drawings 1981-000-SSSPC- Report
0002
4.1 Setting and install 19 mm Flexcell liner SP Approved Drawings Approved Drawings
sheet as per Client drawing and Daily Progress - M M
specification
4.2 Setting out of the bottom shell strake SP 1981-000-MESPC-0042 Approved Drawings
and anchor chairs shall match the as Daily Progress - M M
built hold down bolt locations
4.4 Check the elevation of bottom plate QA/QC Approved Drawings Approved Drawings
base on drawing Daily Progress - M M
5.1 Preparing of equipment and Set SP HSE Report 0000-HSE-OP-01 Daily Progress - M R
Scaffolding
5.2 Checked of Radius ( R ) rolled plate QA/QC 1981-000-MESPC- Approved Radius Inspection Yes M I
as drawings 0042/Approved Dwgs Drawings/API650 Report
5.3 Set of shell tank as drawings and SP 1981-000-MESPC- Approved Daily Progress - M M
procedure 0042/Appoved Dwgs Drawings/API650
RESPONSBILITY QA/QC = QUALITY ASSURANCE/CONTROL E = ENGINEERING SP = SUPERVISOR MC = MATERIAL CONTROL PM = PROJECT MANAGER
EMK
FM 427 Rev. 0
PROJECT: Toka Tindung 3MTPA Expansion – SMP Package PREPARED DATE APPROVED DATE APPROVED DATE REV
OP DESCRIPTION OF PROCESS AND RESP. CONTROL ACCEPTANCE CERTIFY – VERIFY DOCUMENT EPITERMA PT.TTN INSPECTOR Nom/Drawing
No. INSPECTION ACTIVITY DOCUMENT CRITERIA Referensi
MDR ACT SIGN ACT SIGN
5.4 Check of circumference shell tanks QA/QC 1981-000-MESPC- Approved Circumference Yes M I
not exceed more than ± 0.3 % 0042/Approved Dwgs Drawings/API650 report
5.5 Check of roundness and plumbness QA/QC 1981-000-MESPC- Approved Roundness and Yes M I
as per requirement of 0042/Approved Dwgs Drawings/API650 plumbness report
4.6 standard
Check of the client
rim level shall not deviate
by more than 10 mm from 1981-000-MESPC- Approved
QA/QC Daily Progress Yes M I
the design level 0042/Approved Dwgs Drawings/API650
6.3 Weld of Tank floor joint with continues Welding Procedure/QP-S- Approved
SP Daily Progress Yes M M
backing strip as drawing 003 drawings/API 650
RESPONSBILITY QA/QC = QUALITY ASSURANCE/CONTROL E = ENGINEERING SP = SUPERVISOR MC = MATERIAL CONTROL PM = PROJECT MANAGER
EMK
FM 427 Rev. 0
PROJECT: Toka Tindung 3MTPA Expansion – SMP Package PREPARED DATE APPROVED DATE APPROVED DATE REV
OP DESCRIPTION OF PROCESS AND RESP. CONTROL ACCEPTANCE CERTIFY – VERIFY DOCUMENT EPITERMA PT.TTN INSPECTOR Nom/Drawing
No. INSPECTION ACTIVITY DOCUMENT CRITERIA Referensi
MDR ACT SIGN ACT SIGN
7.0 DIMENSIONAL TOLERANCE QA/QC API 650. API 650. Verify doc & Report Yes I W/R
7.1 Plumbness
Vertical internal component shall not
exceed 1/200 of the total height W/R
Yes
Roundness tolerance ± 13 QA/QC API 650. API 650. Verify doc & Report I
Local Deviations
Peaking tolerance ± 13
Banding tolerance ± 13
8.0 Hydrotest QA/QC API 650. API 650. Verify doc & Report Yes I W/R
RESPONSBILITY QA/QC = QUALITY ASSURANCE/CONTROL E = ENGINEERING SP = SUPERVISOR MC = MATERIAL CONTROL PM = PROJECT MANAGER
EMK
FM 427 Rev. 0
PROJECT: Toka Tindung 3MTPA Expansion – SMP Package PREPARED DATE APPROVED DATE APPROVED DATE REV
OP DESCRIPTION OF PROCESS AND RESP. CONTROL ACCEPTANCE CERTIFY – VERIFY DOCUMENT EPITERMA PT.TTN INSPECTOR Nom/Drawing
No. INSPECTION ACTIVITY DOCUMENT CRITERIA Referensi
MDR ACT SIGN ACT SIGN
10.0 FINISH
10.1 Installation data report ( Punch list & Approved Installation data Approved Installation Final Inspection
Closed out ) must be approved and QA/QC Yes SM R
Report data Report Report
submit to client
Note : The drawing reference reviewed for each step in the ITP
RESPONSBILITY QA/QC = QUALITY ASSURANCE/CONTROL E = ENGINEERING SP = SUPERVISOR MC = MATERIAL CONTROL PM = PROJECT MANAGER