Sectional Quality Plan Wira Syukur (M) Sdn Bhd

External Wall & Floor Tiling

SECTIONAL QUALITY PLAN

on

EXTERNAL WALL &


FLOOR TILING

for

CADANGAN MEMBINA 1 BLOK PANGSAPURI PERKHIDMATAN 38 TINGKAT YANG


MENGANDUNGI: PANGSAPURI PERKHIDMATAN 29 TINGKAT (259 UNIT), 1 TINGKAT
TEMPAT LETAK KERETA DAN RUANG PERNIAGAAN (2 UNIT) SEPARA BAWAH TANAH, 2
TINGKAT RUANG PERNIAGAAN (32 UNIT) , 5 1/2 TINGKAT TEMAPT LETAK KERETA, 1
TINGKAT KEMUDAHAN PENDUDUK DAN KOLAM RENANG DI ATAS LOT 48631
(PT59322), PUSAT BANDAR BARU BANGI, MUKIM KAJANG, DAERAH ULU LANGAT,
SELANGOR DARUL EHSAN UNTUK TETUAN SUNWAY BANGI SDN BHD

By

WIRA SYUKUR (M) SDN BHD

0
Sectional Quality Plan Wira Syukur (M) Sdn Bhd
External Wall & Floor Tiling

DISTRIBUTION AND AUTHORISATION


_____________________________________________________
Distribution List for Controlled Copies

The controlled copies are restricted to the following personnel:


No. To Company Recipient
1 (Client) Sunway Bangi Sdn Bhd Mr. Hiew Kok Leong
2 Architect T+Y Architects Ar Tai Meng Yue
3 C&S Jacobs Engineering Services Sdn Bhd Ir. Yap Kah Hin/ Mr Lee
Consultant Kim Siang
4 M&E Perunding JW Sdn Bhd Ir. Jimmy Wu
Consultant
5 Main Wira Syukur (M) Sdn Bhd Mr Kamal Ku Ishak
Contractor
9 C.O.W C&S: Jacobs Engineering Services S/B Mr Mohd Shah b.
M&E: Perunding JW Hashim
Arch: T+Y Architect Zulfahmi b. Mohd Yusof
Simon CKH

Document Version
Version No : 00 Version Date : 28.2.18

CONTENTS PAGE

1 SCOPE..................................................................................................................................... 2

2 KEY MILESTONES................................................................................................................... 2

3 MANPOWER............................................................................................................................ 2

4 MATERIALS AND MACHINERIES......................................................................................... 2-3

5 TRAINING................................................................................................................................. 3

6 WORK METHOD STATEMENT........................................................................................... 4- 8

7 CHECKLIST OR INSPECTION FORM......................................................................................9

1
Sectional Quality Plan Wira Syukur (M) Sdn Bhd
External Wall & Floor Tiling

1 SCOPE

This Section Quality Plan covers setting out and laying of wall and floor tiling
finishes according to the specification construction drawing.

2 KEY MILESTONES

Mock Up:
Overall Works
Apartment
Level 9
Commence- 15/06/2018 1/07/2018
ment Date
Completion 15/07/2018 31/08/2018
Date

3 MANPOWER
Refer to Attachment A

4 MATERIALS and MACHINES

TYPES & DESCRIPTION OF TILES


NIRO GRANITE
CODE TILE CODE DESCRIPTION
- GSM 03 NERO 600X600X10mm Porcelain Tiles
- GSM 04 GRIGO 600X600X10mm Porcelain Tiles
- GMR 97 REGAL BLACK 600X600X10mm Porcelain Tiles
- GDW16 ALBERO 600X150X10mm Ecoforesta Porcelain Tiles
MARRONE
- NIRO GRANTE BLACK 600X300X25mm Grante Black Impala Finish with Half Bullnose

MYDECOR
CODE TILE CODE DESCRIPTION
CM-100M261
(Combination of
- MCQ021V & MCQ022V) 9 pieces of 98X98X8mm Lampang Tiles
- CM-100M263
(Combination of
MCQ022V & MCQ025V) 9 pieces of 98X98X8mm Lampang Tiles
- MCQ025VSN 98X98X8mm Lampang Step Tiles

2
Sectional Quality Plan Wira Syukur (M) Sdn Bhd
External Wall & Floor Tiling

TYPES OF MAPEI TILE ADHESIVE

NO PRODUCT
1 PLANICRETE SP
2 KERABOND T
3 ISOLASTIC 50
4 KERAPOXY
5 KERAFLEX MAXI
6 ULTRACOLOR PLUS

Other Materials

Material
Tile PVC Spacer
Expansion/ Movement Joint/ Stainless Steel
Angle@Strip
PVC Grooveline
Stainless Steel Angle@Strip

Type of machine / equipment / plant / tools Quantity


Plum Bob 4
Leveling Rule 1.2m 6
Square Rule 1m 8
Backhoe/ Forklift (for unloading & Transferring purpose) 1/1
Solid bed/ Notched Trowel 4
Sponge/ Soft Cloth 4
Tile Cutting Machine 3
Grinder 3

5 TRAINING

Date : TBC
Venue : TBC
Trainer : TBC
Trainee : TBC

3
Sectional Quality Plan Wira Syukur (M) Sdn Bhd
External Wall & Floor Tiling

6 WORK METHOD STATEMENT

The attached Work Method Statement shall include the following :

6.1 Flow Chart (please refer Attachment B)

6.2 Objective
The objective of this work method statement is to lay the wall and floor
tiling finishes according to the specification / construction drawing.

6.3 Delivery, storage, handling and protection of materials at site.

6.3.1 All floor and wall tiles should be transported to site by means
of lorry and unloaded and appropriately using mobile crane
and/ or others alternative with care handling to prevent
damages to the tiles. Before the acceptance, delivered tiles
must be properly checked to prevent any wrong delivery,
quality (color, shade & size) and to ensure the condition of tiles
are intact. Miss out or damages to the tiles if any, shall be
recorded properly on the D.O. and/ or checklist, then
notification shall be made to the supplier before unloading. All
tiles shall be placed in a proper stockyard allocated within site
and no stacking are allowed.

6.4 Pre-installation requirements:

6.4.1 Propose and/or submit the samples and brochure of tiles,


adhesive cement, grout filler and others related materials as
per details described in drawing and/or BQ and/ or equivalent
to S.O for approval before placing buck order from the supplier.

6.4.2 Identify the expansion/ movement joint location and prepare


dry lay on site for S.O approval.

6.4.3 Upon approval by S.O, mock-up shall be carry out at designated


area by the S.O to comments and final approval.

6.4.4 Preparation of Pre- Installation:

a. Protect the working area from rain and direct sunshine


during the installation. Erect tentage and maintain
temporary drainage system. Allow installation to cure
properly in dry environment.

b. Ensure all concealed items (Cold water piping, concealed


fitting, electrical concealed conduit, switch and power point
and etc.), waterproofing (ponding test) works at respective
location have been correctly done and approved by S.O
before screeding and plastering take place. All outlet if any,
shall securely plugged to avoid clogged.

4
Sectional Quality Plan Wira Syukur (M) Sdn Bhd
External Wall & Floor Tiling

c. Ensure the surfaces of substrates (floor and wall) are in


level, flat, clean and free from dust and other impurities
which may affect adhesion between substrates and cement/
sand base screed. Note that, the screed and plaster shall
be cure for minimum 7 days and the finished surface shall
be semi- smooth finish with wood float. Note that, the mix
ratio of base screed OPC & course sand shall be 1:3 which
comply to BS EN 13139.

d. Setup dry lay of the tiles by setting 2-way symmetry


references and/or level line and lay the tiles start from
center pinpoint working toward the wall adjust the gap (shall
be consistent and within the tolerance) of tiles to the wall to
minimize the need of tiles cutting and/ or prevent thin
slivers.

e. Once the layout confirmed by S.O, quantity of materials


used for the works shall be estimated. For those tiles
cutting needed, mark the measured cut-to-be on tiles
surfaces and use tile cutter or others suitable tools to
achieve diagonal and appropriate cuts. (edge tiles, floor
trap, skirting, chamfer, tap and etc.)

6.5 Execution of work

6.5.1 Swimming Pool Lampang Tiles Installation

Products: KERABOND T + ISOLASTIC 50: Two component, high


performance cementitious adhesive for ceramic tiles, glass
mosaics and stone material.

a) Mix KERABOND T + ISOLASTIC 50 in the following ratio


with a low-speed mechanical mixer until a uniform paste is
obtained without lumps. Leave the paste to slake for few
minutes and remix before use.

Mix Ratio KERABOND T ISOLASTIC 50


Proportion by weight 25 KG 8.5 KG

b) Use the flat side of a notched trowel to spread a thin-coat of the


mix onto the back of the granite slabs. Immediately after, use
the flat side of the notched trowel to spread a skim-coat of the
mix to the receiving surface so as to cover it completely.
Spreads of adhesive should be strictly controlled to areas that
can be completely laid within the open time of the adhesive (30
minutes and depending temperature and humidity). Follow by
using the notched side of the trowel to apply the required
amount of the adhesive on top of the skim coat.

c) Before laying the granite, ensure that skinning has not formed
on the surface of the adhesive. Should a skin have formed, the
adhesive must be re-notched and/or re-trowelled. Then lay the

5
Sectional Quality Plan Wira Syukur (M) Sdn Bhd
External Wall & Floor Tiling

tile onto the adhesive with firm pressure and adjust within the
open time (30 minutes).

d) Protect the finished surface and let the adhesive set for at least
24 hours before grouting the tile joints.
e) Surfaces are ready for use after 14 days .Basins and swimming
pools can be filled after 21 days.

6.5.2 Joint Grouting

Products KERAPOXY: A two-component epoxy-resin-based product with


: silica sand and special components, with excellent resistance to
acids. A chemical resistant epoxy grout under class RG2 in
compliance with EN 13888.
S
a) Pour all the hardener, Part B, into a bucket containing Part
A and mix well with a low speed electric stirrer until a
smooth paste is obtained. Avoid over-mixing and over-
heating of the mixture, which could reduce working time.
Use the paste within 30 minutes from mixing.

b) Mix grout in its pre-measured mix proportions.

Mix Ratio PART A PART B


Proportion by weight 4.5kg 0.5 kg

c) Spread KERAPOXY with the appropriate MAPEI rubber


trowel, making sure the joints are completely filled.
Remove excess grout from surface with the edge of the
same rubber trowel.

d) After grouting with KERAPOXY, cleaning must be carried


out immediately before the product dries.

e) Wet the surface with clean water and emulsify with a


Scotch-Brite pad, making sure not to rake out the epoxy
grout mortar from the joints.

f) The excess liquid can be removed with a hard cellulose


sponge and should be replaced when it is too full of the
epoxy resin in the cleaning process.

g) Continue the cleaning process with clean water.

h) It is very important that once the finishing process has


ended, no traces of Kerapoxy should be left on the tile
surface because it will be very difficult to remove. It is
therefore necessary to frequently rinse the sponge with
clean water during the clean process.

6
Sectional Quality Plan Wira Syukur (M) Sdn Bhd
External Wall & Floor Tiling

6.5.3 Wall Tiling

a) Item and sub-item 6.4 fulfilled, do final check on the


verticality of wall base plaster prior to commence of wall
tiling. Note also that tiles must be fix dry, hence shouldn’t
soak in water.

b) Tile adhesive shall be polymer modified cement based as per


BQ (Mapei) only for internal or equivalent (subject to S.O.
approval) which well-known and widely used in the market.

c) Mix adhesive cement as per manufacturer’s recommendations


and apply floated coat of adhesive to dry surface then comb
with notched trowel as 6mm X 6mm bedding of about 10mm-
15mm thick subject to manufacturer’s recommendations as
follow:-
i. Do not apply more than 1m² at a time.
ii. Ensure there are no voids under the tiles.

d) Place tile piece by piece onto bedding adhesive firmly with


slight twisting motion. Once in position, tapped uniformly to
achieve good surface contact and ensure no hollowness. Place
PVC spacer in between the tile for alignment and gaps
consistency which normally about 1mm - 4mm (subject to tiles
manufacturer’s recommendations / S.O. approval).

e) Continue laying tile to pattern as per approved layout details


and spirit level should be used constantly to check the
verticality, evenness and flatness of tiled surfaces until tiling
works complete. Ensure the PVC grooveline, stainless steel
angle installed at the designated location.

f) Remove excessive mixed adhesive with damp cloth when it’s


still fresh and keep completed tiling works for about 24 hours
out from running water or rain water before joint gaps grouting
works shall be carry out. The wall tiles grout filler shall be as
per A.I. (Mapei) or equivalent. (subject to S.O. approval)

g) Clean joint gap by brush to ensure the joint gap is clear and
free of foreign material.

h) Mix the approved grout filler as per manufacturer’s


recommendations, then force grout and fill the joint gaps
completely to entire depth using suitable tools such as
trowel, sponge, soft cloth and etc.

i) Clean off surface and leave free from blemishes and also
keep expansion/ movement joint clean and free of grout.
Rub wall tiling with dry cloth when joints filler is hard.

7
Sectional Quality Plan Wira Syukur (M) Sdn Bhd
External Wall & Floor Tiling

6.5.2 Floor Tiling

a) Item and sub-items 6.4 fulfilled, do final check on the floor


screed bedding to ensure level, flat, clean and free from dusts
& other impurities which may affect adhesion between
substrates and cement/sand base screed. Ensure also all the
drop, fall, outlet opening is in accordance to requirements.
b) Tile adhesive shall be polymer modified cement based as per
A.I. (Mapei) or equivalent (subject to manufacturer’s
recommendation). Be in mind on the fall and drop area check
2% fall towards the discharge outlet and 15mm drop at
threshold area is achievable.
c) Mix adhesive cement as per manufacturer’s recommendations
and apply floated coat of adhesive to the floor screes surface
then comb with solid bed trowel or suitable sized notched
trowel as bedding of about 10mm-20mm thick subject to
manufacturer’s recommendation as below:-

i. Do not apply more than 1m² at a time.


ii. Ensure that there are no voids under tiles.
iii. For large tiles should the ahesive should be buttered to
back of tile in addition top trowelling on substrate.

d) Place tile piece by piece onto bedding adhesive firmly with


slight twisting motion. Once in position, tapped uniformly to
achieve good surface contact. Place PVC spacer in between
tile to align and consistent the gap which normally about 3mm-
5mm. (Subject to tiles manufacturer’s recommendation/ S.O
approval).
e) Continue laying tile to pattern as per approves layout details
and spirit level should be used constantly to check the
evenness and flatness of tiled surfaces. Ensure fall of 2%
towards discharge outlet and 15mm drop at threshold area
installed at the designated location. Cut tile surrounding floor
trap to be approved by architect.
f) Remove excessive mixed adhesive with damp cloth when it’s
still fresh and keep completed tiles works for about 24 hours
out from human traffic, running water or rain water before
grouting works carry out. The floor tiles grout filler shall be as
per BQ, (OPC) or equivalent for designated area.
g) Mix the approved grout filler as per manufacturer’s
recommendations, then force grout and fill the joints gap
completely to entire depth using suitable tools such as trowel,
sponge, soft cloth and etc.
h) Further with the installation of skirting tiles (if any) and ensure
the angle squareness, thickness and alignment are within the
tolerances. Then, fill the joint gap with the approved grout after
24 hours. Clean the surface from excessive grout. Rub tiled
surface with dry cloth when joints filler is hard.

8
Sectional Quality Plan Wira Syukur (M) Sdn Bhd
External Wall & Floor Tiling

i) Clean off surface and leave free from blemishes and also keep
expansion/ movement joint clean and free of grout. Rub floor
tiling with dry cloth when joints filler is hard. Cut tile surrounding
floor trap to be approved by architect.

6.6 Point of inspection and testing on Finished Tiles Works


6.6.1 Upon completion of floor and wall tiles works, joint inspection &
testing (correct layout pattern, shading, size, cutting, hollowness,
levelness, flatness, evenness, angle squareness, alignment,
joint gap consistency and etc.) shall carry out with S.O.
representatives to ensure the quality and workmanships are in
order.
Carry out adhesion/ pull-out test for each different condittion
(Combination of substrate/ adhesive and tile type) as required by
the S.O. The result shall comply with the adhesive
manufacturer’s specification.

6.7 Protection on Finished Tiles Works

6.7.1 Protection on Finished Tiles Works:-

i) To cover up the tiled surface using 3mm thick plywood for


human traffic area.

ii) To cover up the tiled surface using canvas sheet for those
minimal work and human traffic areas.

6.7.2 Protector shall be placed and maintained at the respective area


until installation of door leaf and lockable.

9
Sectional Quality Plan Wira Syukur (M) Sdn Bhd
External Wall & Floor Tiling

7 CHECKLIST OR INSPECTION FORM

As attach checklist or inspection form to be used to verify the quality of the work.

10