Beruflich Dokumente
Kultur Dokumente
Ref
FLUSHING/CHEMICAL CLEANING OF CHILLED WATER PIPES Date 25-06-2018
Rev
Set up / Personal unfamiliar LTI Employees involved Provide schedule of 3 3 9 Job specific training shall Responsible 3 1 3
installation with equipment’s in the activity work prior to be imparted by the Engineer /
EQUPMENT DAMAGE mobilization. supervisor or engineer in Supervisor
presence of site in
FINANCIAL LOSS Procedures made for charge and site safety
available for each officer before start of
application. activity.
Identified hazards and
Trained personnel on control measures shall
requirement. be communicated to
team/work men through
Work shall be carried tool box talks every day
out under guidance and in the morning before
instruction of engineer the start of the activity
/supervisor. till the completion of job.
Page 1 of 9
JOB SAFETY ANALYSIS
Ref
FLUSHING/CHEMICAL CLEANING OF CHILLED WATER PIPES Date 25-06-2018
Rev
Material Improper handling LTI Damage to Materials shall be 3 3 9 Poster on correct Responsible 3 1 3
handling will result to equipment /delays stacked in a safe area handling of materials will Engineer /
personal injuries EQUPMENT DAMAGE of work schedule and possibly near to be posted on various Supervisor
Improper the place of work. It places for workers
installation FIRE should be rested on a awareness
Improper storage stable support.
FINANCIAL LOSS
Handle loads which are
well within your
carrying capacity.
Page 2 of 9
JOB SAFETY ANALYSIS
Ref
FLUSHING/CHEMICAL CLEANING OF CHILLED WATER PIPES Date 25-06-2018
Rev
3 2 6 3 1 3
Personal safety Slip/trip and fall EQUPMENT DAMAGE Injury to personal Good housekeeping Tool box talk to be Responsible
due to practices maintain conducted on the Engineer/
slippery/uneven FIRE awareness of housekeeping prior to the Supervisor
surface or bad surrounding work
house keeping work/people.
Page 3 of 9
JOB SAFETY ANALYSIS
Ref
FLUSHING/CHEMICAL CLEANING OF CHILLED WATER PIPES Date 25-06-2018
Rev
Fluids under Uncontrolled LTI Injury/damage to Approved procedures 4 3 12 The activity shall be Responsible 4 1 4
pressure release of personal/equipment to perform the monitored by a Engineer/
fluids/chemicals/pr EQUPMENT DAMAGE ’s operation. competent supervisor Supervisor
essure during the
operation FIRE Restrict thoroughfare Place safety posters and
by deploying essential sign boards for better
FINANCIAL LOSS personal. attention
Page 4 of 9
JOB SAFETY ANALYSIS
Ref
FLUSHING/CHEMICAL CLEANING OF CHILLED WATER PIPES Date 25-06-2018
Rev
Chemical dosage Chemical pollution LTI Environmental Conduct toolbox talk on 3 3 9 The activity shall be Responsible 3 2 6
/mixing with /exposure to impact/injury to MSDS of the chemical monitored by a Engineer/
water personal involved FIRE personal used. competent supervisor Supervisor
in the operation
FINANCIAL LOSS Ensure use of MSDS
recommended personal Place safety posters and
ENVIRONMENT POLLUTION protective equipment’s sign boards for better
. attention
MAN AND MATERIAL Engage only trained
and experience
personal.
Ensure proper
ventilation.
Page 5 of 9
JOB SAFETY ANALYSIS
Ref
FLUSHING/CHEMICAL CLEANING OF CHILLED WATER PIPES Date 25-06-2018
Rev
Pressuring Uncontrolled LTI Injury / fatality Verify completion of 4 3 12 The activity shall be Responsible 4 1 4
pressurization Damage to mechanical works prior monitored by a Engineer/
could result in EQUPMENT DAMAGE equipment to including pressure competent supervisor Supervisor
rapture of pipe
work/fitting or FINANCIAL LOSS Use competent Place safety posters and
whipping of hoses personnel. sign boards for better
MAN AND MATERIAL attention
Toolbox talk
conducted. Ensure unauthorized
persons restriction in
work area by barricading
,caution or warning
boards
Draining/ Waste water after Environmental Ensure wastes are not 4 3 12 The activity shall be Responsible 4 1 4
dynamic flushing cleaning being EQUPMENT DAMAGE impact drained to earth. monitored by a Engineer/
discharged at competent supervisor Supervisor
authorized can FINANCIAL LOSS Drainage to be
cause pollution to disposed off to Place safety posters and
land/storm water ENVIRONMENT POLLUTION municipality designated sign boards for better
system area. attention
Page 6 of 9
JOB SAFETY ANALYSIS
Ref
FLUSHING/CHEMICAL CLEANING OF CHILLED WATER PIPES Date 25-06-2018
Rev
Page 7 of 9
JOB SAFETY ANALYSIS
Ref
FLUSHING/CHEMICAL CLEANING OF CHILLED WATER PIPES Date 25-06-2018
Rev
Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
Page 8 of 9
JOB SAFETY ANALYSIS
Ref
FLUSHING/CHEMICAL CLEANING OF CHILLED WATER PIPES Date 25-06-2018
Rev
Page 9 of 9