Sie sind auf Seite 1von 1

Client: Form No.

:
Engineer:
Request For Revision:
Contractor: Inspection Date Issued:
Project CA-XX

Inspection Request No.: IR/CW/1564 Revision Number: A


th
Inspection Date: 24 March, 2010 Inspection Time: 1000 hrs
Drawing No. Rev Status
Reference
DM001-D-G18-GAR-SD-DCC-2036951 FOR A2
Drawing(s):
CONSTRUCTION
Other Documents: Method of Statement for lift glazing works , DM001-E-ACW-GAR-IT-DCC-818114

Contact Person: Mobile No:


Details of Inspection
Work Category
DM001/E/ACW/GAR/IT/DCC/8
ITP Number / Rev 18114
ITP Item Number (s) 3.1-3.2

Primary Location:
Other Locations (Specify)

Detailed Location:
Details of item to be inspected: Material Inspection for Galvanized channel 55x78x55x1.5mm –for VEP/Glass cladding.
Inspection Requested By
Name Date / Time Designation Signature
Site Engineer

QCE Submission to Engineer


Inspection Requested Approved By (RIB
Section Name Date / Time Designation Signature
QC Department
Survey Department
Interface (E&M/other)*
* (if required)
Interface (Rail/other)*
* (if required)
DURL Comments Comment reviewed & closed
-----------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------

Inspection Conducted By (The Engineer’ Representative)


Name Date / Time Designation Signature

No Objection Comment reviewed & closed


No Objection With Comments (comments to be cleared and checked by DURL)
Rejected (Resubmit)
-------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------

Inspection Request Form (IR) 11 February 2007


Form Number: 220197-001/F1 Page 1 / 1