Batteries and chargers for Protection and Control supply shall be provided.
16.9.1.1 Battery
i. 1 (one) 110V battery. Capacity at least 400Ah/10h for substations a 132KV
substations and above
ii. The 48V batteries of not less than 200Ah/10h rating shall be included in the bid
for communication equipment and the RTU.
iii. The 110V and 48V batteries shall be Nickel cadmium type with a nominal
Voltage of 1.20Vpc.
The bidder’s design shall check adequacy of the proposed capacities based upon the calculated
consumption considering a fully developed substation. Where the design capacity is higher than
the employer’s capacity, the design capacity shall be adopted. Where the design is lower than the
proposed, the employer’s capacity shall be adopted.
Batteries shall be installed in separate room with explosion proof ventilation fan.
16.9.1.2 Charger
(a) 1 (one) DC charger for the 110V battery.
(b) 1 (one) DC charger for the 48V Battery.
The chargers shall be complete with instruments, breakers on AC and DC side and protection.
The chargers shall have auxiliary contacts for collection of status, alarms and measurands for the
SCADA system.
16.9.1.3 Switchboard
1 (one) switchboard 110VDC.
(g) 20% of the breakers of any size shall be spare and readily mounted.
134
16.9.2.2 Input
Input Voltage – 415V –Three phase +/- 13%
Frequency – 50 Hz +/- 5%.
16.9.2.3 DC Output
i. Nominal – 110V
ii. Current – 75A min.
iii. Float setting – 128V
iv. Boost setting – 136V
16.9.2.5 Operation
i. Altitude: 0 – 2200M a.s.l
ii. Temperature: 0 to 40oC
iii. Humidity: 20 – 90%
iv. Natural air convection
16.9.2.8 Instruments
i. DIN 72 flush mounting DC output ammeter scaled 0 – 75A
ii DIN 72 flush mounting DC voltmeter scaled 0 – 160V
iii DIN 72 flush mounting AC voltmeter scale 0 – 250 V
16.9.2.9 Controls
i. Illuminated AC on/off mains input MCB fitted on the front panel
ii. Manual float/boost selection switch fitted on the front panel
iii. Alarm cancellation push button
16.9.2.10 Alarms
i. Mains failure
ii. DC failure
iii. Positive E/fault
iv. Negative E/fault
v. All the above to have LED indication fitted on the front panel
16.9.2.11 Distribution
i. At least 4 pairs of unfused terminals for the protection circuits.
16.9.2.12 General
i. The charger should be of free standing type
ii. Technical specifications data, and detailed instruction manual on erection, commissioning,
operation, maintenance, trouble shooting, spares catalogue and including any special
instructions shall be provided. The manual must be in English.
16.9.3.2 Input
Input Voltage – 240V- Single phase +/- 13%
Frequency – 50 Hz +/- 5%.
16.9.3.3 DC Output
i. Nominal – 48V
136
16.9.3.5 Operation
i. Altitude: 0 – 2200M a.s.l
ii. Temperature: 0 to 40oC
iii. Humidity: 20 – 90%
iv. Natural air convection
16.9.3.8 Instruments
i. DIN 72 flush mounting DC output ammeter scaled 0 – 55A
ii. DIN 72 flush mounting DC voltmeter scaled 0 – 75V
iii. DIN 72 flush mounting AC voltmeter scale 0 – 250 V
16.9.3.9 Controls
i. Illuminated AC on/off mains input MCB fitted on the front panel
ii. Manual float/boost selection switch fitted on the front panel
iii. Alarm cancellation push button
16.9.3.10 Alarms
i. Mains failure
ii. DC failure
iii. Positive E/fault
iv. Negative E/fault
v. All the above to have LED indication fitted on the front panel
16.9.3.11 Distribution
i. At least 4 pairs of unfused terminals for the communication circuits.
16.9.3.12 General
iii. The charger should be of free standing type
iv. Technical specifications data, and detailed instruction manual on erection, commissioning,
operation, maintenance, trouble shooting, spares catalogue and including any special
instructions should be provided. The manual must be in English.
137
The appropriate Technical guarantees in appropriate Volume II Technical schedule section shall
be completely filled
The Scope will include Supply and Installation of communications, telephones, tele-protection
and SCADA equipment for the efficient supervision, control, operation and maintenance of the
transmission system.
The Scope will include Supply and Installation of communications, telephones, tele-protection
and SCADA equipment for the efficient supervision, control, operation and maintenance of the
transmission system. Optical fibre communication link with its associated terminal equipment is
required from the Narok Substation to Bomet Substation. At Narok the signals from the terminal
equipment shall be integrated into the existing communication System to local control centre and
to the National Control Centre.
The contractor shall include detailed system design, manufacture, supply, installation, testing,
commissioning, remedying of defects, maintaining the works during the defects liability period
and any incidental work necessary for the proper completion of the work in accordance with this
contract.
FATs shall be carried out for fibre, OLTE and RTU as per cls 1.24. Training shall be carried out
for RTU and SDH equipment.
System design – The system design and preparation of contractor's drawings to approval of the
Engineer
Supply and installation of fibre optic lead-in cables including mounting hardware and splicing.
Supply and installation of supervisory management system and cabling to the relevant distribution
frame(s)