PAINTING INSPECTION REPORT

QA/QC DEPARTMENT
Project : Retubing of Heat Exchanger 23-SG-451-E1

Client : SABIC-SAFCO PO.No : 4300178370

Report No : PRJ-RT-18112 Date : 26th Jun, 2018

Location : ICOM WORKSHOP, JUBAIL Equipment/System : 23-SG451E1-Blowdown Cooler

Stage of Painting/coating : Primer Painting Mid Coat Top/Final Coat

Description : Piping Steel Structure Mech. Others S/T. Heat Exchanger

Weather Condition Surface Prep. Accept Reject

Time 10:20 AM 3:00 AM 7:00 AM Material Applied

Amb Temp 34 C° 32 C° 33 C° Material : Jotun-Penguard-Primer

Sur. Temp 36 C° 34 C° 35 C° Thinner : Jotun Thinner No:17

R. Humidity 21% 18% 20% Mixing Ratio : Base:Curing Agent 4:1

Dew Point 13 C° 14 C° 13 C° Nozzle TIP : 0.016"

DFT
No Material Spec Profile Remarks
Min. Max. Avg.

1 Shell External Surface S.Blasted 30/60 45 60 52 Primer-First Coat

2 Channel External Surface S.Blasted 30/60 45 60 53 Primer-First Coat

10
Remarks:

ICOM QC Inspector Client QC Inspector

Name Abdul Gafoor

Signature
Date 26th Jun,2018
QCIF.PI.00 (Don't make any changes without information)
PAINTING INSPECTION REPORT

QA/QC DEPARTMENT
Project : Retubing of Heat Exchanger 23-SG-451-E1

Client : SABIC-SAFCO PO.No : 4300178370

Report No : PRJ-RT-18112 Date : 26th Jun, 2018

Location : ICOM WORKSHOP, JUBAIL Equipment/System : 23-SG451E1-Blowdown Cooler

Stage of Painting/coating : Primer Painting Mid Coat Top/Final Coat

Description : Piping Steel Structure Mech. Others S/T. Heat Exchanger

Weather Condition Surface Prep. Accept Reject

Time 10:20 AM 3:00 AM 7:00 AM Material Applied

Amb Temp 34 C° 32 C° 33 C° Material : Jotun-Penguard-Primer

Sur. Temp 36 C° 34 C° 35 C° Thinner : Jotun Thinner No:17

R. Humidity 21% 18% 20% Mixing Ratio : Base:Curing Agent 4:1

Dew Point 13 C° 14 C° 13 C° Nozzle TIP : 0.016"

DFT
No Material Spec Profile Remarks
Min. Max. Avg.

1 Shell External Surface S.Blasted 30/60 45 60 52 Primer-2nd Coat

2 Channel External Surface S.Blasted 30/60 45 60 53 Primer-2nd Coat

10
Remarks:

ICOM QC Inspector Client QC Inspector

Name Abdul Gafoor

Signature
Date 26th Jun,2018
QCIF.PI.00 (Don't make any changes without information)
PAINTING INSPECTION REPORT

QA/QC DEPARTMENT
Project : Retubing of Heat Exchanger 23-SG-451-E1

Client : SABIC-SAFCO PO.No : 4300178370

Report No : PRJ-RT-18112 Date :

Location : ICOM WORKSHOP, JUBAIL Equipment/System : 23-SG451E1-Blowdown Cooler

Stage of Painting/coating : Primer Painting Mid Coat Top/Final Coat

Description : Piping Steel Structure Mech. Others S/T. Heat Exchanger

Weather Condition Surface Prep. Accept Reject

Time 10:20 AM 3:00 AM 7:00 AM Material Applied

Amb Temp 34 C° 32 C° 33 C° Material : Jotun-Penguard-Primer

Sur. Temp 36 C° 34 C° 35 C° Thinner : Jotun Thinner No:17

R. Humidity 21% 18% 20% Mixing Ratio : Base:Curing Agent 4:1

Dew Point 13 C° 14 C° 13 C° Nozzle TIP : 0.016"

DFT
No Material Spec Profile Remarks
Min. Max. Avg.

1 Shell External Surface S.Blasted 30/60 Final Coat

2 Channel External Surface S.Blasted 30/60 Final Coat

10
Remarks:

ICOM QC Inspector Client QC Inspector

Name Abdul Gafoor

Signature
Date
QCIF.PI.00 (Don't make any changes without information)