Sie sind auf Seite 1von 2

SKR TECHNO INDUSTRIES

QUOTATION-SKRT/QUO/18-19/005
BALA SAI (9490797296), DATE-28-05-2018
I.E KUKATPALLY MTE INDUSTRIES
HYDERABAD HYDERABAD
skrtechnoindustries@gmail.com
DEAR SIR,

S.NO MACHINE NAME AND CHARGES AMOUNT


1. Machine total guards to be removed. -
2. All coolant connections disconnected and removed. -
3. -
All hydraulic pipes to be removed.
4. -
All lubrication lines to be removed.
5. -
Lubrication points X,Y and Z axis to be check and solve it.
6. -
X,Y and Z axis slider and bed to be check and scrapping to be
done .if any terkite,spoild new on stick it and scrap it.
7. -
All slides dismantled and check it individual parallality and
8. perpendicularity and to be scrape X,Y and Z. -
Beds XYZ any variation in parallality and perpendicularity do
9. it grinding in MTE. -

Any spares like procurement and manufacturing items MTE


10. will arrange. -

11. Consumable items like grease, cotton waste ,cloths -


kerosene ,tool box MTE source only.

12. Machine disassembly and scrapping final assembly will be -


taken time 45 working days.
13. -
We will be provide only service.
14. -
We will provide XYZ parameters.
15.
Total team will work on this machine for these service
charges.
Overhead crane will be providing in MTE.
TOTAL AMOUNT 4,25,000/-

TERMS AND CONDITION –


1. Service will be provided our side and machine manufacturing working in 45 DAYS.
2. EXTRA GST (18%) - 36AUJPD2305G1Z3
3. PAYMENT TERMS -ADVANCE-30%

-MIDDLE TIME-50%

-AFTER WORK-20%

AFTER OUR QUOTATION WILL BE OK.WORK WILL BE STARTED.

Thank you sir,


Yours Faithfully,
BALA SAI
DALE NAVEEN,
SKR TECHNO INDUSTRIES