Sie sind auf Seite 1von 77

GOVERNMENT OF ANDHRA PRADESH

PANCHAYATRAJ ENGINEERING DEPARTMENT

PROPOSAL ESTIMATE

Name of the Work : Construction of high level bridge on the R/F EC Road to Balive

Estimate Amount Rs.700.00 lakhs

DISTRICT : WEST GODAVARI

CIRCLE : ELURU

DIVISION : ELURU

SUB-DIVISION : ELURU

MANDAL : PEDAVEGI
Road to Balive
SPECIFICATION REPORT

Name of the Work : Construction of high level bridge on the R/F EC Road to Balive

Estimate Amount Rs.700.00 lakhs

As per the instructions of the higher authorities and as per the request made by the Hon'ble MP
Eluru,the estimate is prepared for the work"Construction of high level bridge on the R/F EC Road to Balive",Est.Cost.
Rs.700.00 lakhs.

The proposed bridge connects both the West Godavari and Krishna Districts and it leads to a
famous piligrim centre called BALIVE.It is proposed to construct a high level bridge with the following features:-

1.Width of the carriage way is fixed as 7.50m


2.Well foundations are proposed upto scour depth based on the calculations
3.RCC abutments and piers along with bed blocks and backing walls are proposed
4.Simply supported T-Beam type super structure is proposed.
5.No aprons or cut-off walls are proposed.
6.Back filling is proposed behind the abutments with filter media
7.As per the guide lines of IWA,minimum clearence of 5m from FSL is proposed.

Hence,the cost of the bridge proper and approaches is enhnaced.

Further lump sum provisions are made in the estimate for the following items:-

1)Provision for VAT @ 5.00%


2)QC charges @ 0.5%
3)Provision for insurance@ 0.5%

The estimate is prepared as per the current SSR,i.e.2012-2013 rates and as per
the A.P Revised Standard data work will be carried out as per APDSS after getting administrative sanction

Asst.Executive Engineer Dy.Executive Engineer


PRI,Eluru PRI,Eluru
RT

oad to Balive

mount Rs.700.00 lakhs

r the request made by the Hon'ble MP


e on the R/F EC Road to Balive",Est.Cost.

nd Krishna Districts and it leads to a


el bridge with the following features:-

on the calculations
acking walls are proposed

m from FSL is proposed.

2-2013 rates and as per


r getting administrative sanction
GENERAL ABSTRACT

Name of the Work : Construction of high level bridge on the R/F EC Road to Balive

Est.Cost.Rs.700.00 lakhs

S.No Description of item (Kms) Amount


in Rs.
1 2 3 4

1 Bridge Proper 59700000.00

2 Approaches 6277747.00

3 Provision for VAT @5% 3298887

4 Provision for Q.C.Charges @0.5% 329889

5 Provision for insurance @0.5% 329889

6 Provision for KM&HM stones 63588

Grand Total 70000000.00

Asst.Exe.Engineer Deputy Exe.Engineer


PR,Eluru PR,Eluru
DATA SHEET

Index-code S. No Description Unit Quantity Rate Rs.


1 2 3 4 5

FOUNDATION:-

RBR-FNDN-1 1 Excavation for Structures


Earthwork in excavation for structures as per drawing
and technical specifications Clause 305.1 including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious material and
disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated
suitable material as per Technical Specification 305
MORD / 304 MORTH

Note : Classifications of Earth Work Specification


are as per 302.2.1(a) of MORD and 301.2.1 of
MORT&H
(B) Mechanical Means
i Upto 3 m depth
Unit = cum
Taking output = 240 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 8.32
b) Machinery
Hydraulic Excavator 1 cum bucket capacity hour 6.00
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Note : 1. Cost of dewatering upto 5% of a+b may be added, where required, up to 10 per cent
of labour cost. Assessment for dewatering shall be made as per site conditions.
ii 3 m to 6 m depth
Unit = cum
B Mechanical Means
Unit = cum
Taking output = 210 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 8.32
b) Machinery
Hydraulic excavator 1.0 cum bucket capacity hour 6.00
c&d) Overheads & Contractors Profit
Cost for 210 cum = a+b+c+d
Rate per cum = (a+b+c+d)/210
Note : Cost of dewatering upto 5 per cent of (a+b) may be added, where required.
Assessment for dewatering shall be made as per site conditions.
2 Filling in foundation trenches as per drawing and
RBR-FNDN-2 technical specification Clause 305.3.9 MORD & 304
MORTH
I Sand filling
Unit = cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.31
b) Material
Sand cum 1.00
c&d) Overheads & Contractors Profit
Rate per cum = a+b+c+d
3 Providing concrete for plain/reinforced concrete in
open foundations using 40 mm nominal size
Graded hard stone aggregate, mechanically mixed,
placed in foundation and compacted by vibration
RBR-FNDN-4 including curing for 14 days complete as per
drawings and technical specifications Clause 802,
803, 1202 & 1203 MORD and 1500, 1700 & 2100
MORTH.

I P.C.C grade M 10
(i) Nominal mix 1:3:6
Unit = cum
(a) Material
Cement t 0.22
Coarse sand cum 0.45

40 mm aggregate cum 0.9

Water kl 1.2
(b) Labour
Mate day -
Mason (1st Class) day 0.1
Mazdoor (Unskilled) day 1.39
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity fitted hour 0.40
with water measuring device and preferably also with
load
Watercell.
tanker 6 kl capacity hour 0.13
(d) Formwork @ 4% on cost of material, labour and 4.00%
machinery (a+b+c)
e&f) Overheads & Contractors Profit
Rate per cum = a+b+c+d+e+f

4 E R.C.C. grade M 25 (Design Mix) using 20 mm


Graded Metal (MORD & MORTH 12.8 E) for wells
steining,Kerb etc.
Case 1 : Using Concrete Mixer
Unit = cum
(a) Material
Cement t 0.403
Coarse sand cum 0.45

20 mm aggregate cum 0.54

10 mm aggregate cum 0.36

(b) Labour
Mate day -
Mason (1st Class) day 0.1
Mazdoor (Unskilled) day 1.39
Bhisti day
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hr / 0.4
cum

(d) Formwork @ 3.75% on (a+b+c) 3.75%


e&f) Overheads & Contractors Profit
Rate per cum = a+b+c+d+e+f

WELL FOUNDATION

11 Providing and Laying Cutting Edge of Mild Steel


weighing 40 kg per metre for Well Foundation
RBR-FNDN-11 complete as per Drawing and Technical
Specification 1204, 1900 MORTH.
Unit = 1 MT
Taking output = 1 MT
a) Material
Structural steel in plates, angles, etc including 5 per t 1.05
cent wastage
Nuts & bolts Kg 20.00
b) Labour
(for cutting, bending, making holes, joining, welding and
erecting in position)
Mate day -
Fitter day 5.50
Blacksmith day 5.50
Welder day 5.50
Mazdoor (Unskilled) day 17.82
Electrodes, cutting gas and other consumables @ 10
per cent of cost of (a) above
Handling loading and unloading on (a)
Hire charges of Welding machine on (a)
c&d) Overheads & Contractors Profit
Rate per MT (a+b+c+d)
12 Plain/Reinforced Cement Concrete, in Well
Foundation complete as per Drawing and Technical
RBR-FNDN-12 Specification 1200, 1500 & 1700 MORTH.

(ii) RCC M25 Grade


Same as per 4.E except for formwork which shall be@
20 per cent of the cost of concrete instead of 3.75 per
cent.
Case 1 : Using Concrete Mixer
Per Cum Basic Cost of Labour, Material & Machinery cum 1.00
(a+b+c)
d) formwork @ 20 per cent of the cost of concrete 20.00%

Water
e&f) Overheads & Contractors Profit
Rate perm (a+b+c+d+e+f)

(F) Well cap


(ii) RCC Grade M25 (Design Mix)
Case I : Using Concrete Mixer
Unit = cum
Taking output = 15 cum
a) Material
Cement t 6.05
Coarse sand cum 6.75
20 mm Aggregate cum 8.10
10 mm Aggregate cum 5.40
b) Labour
Mate day -
Mason day 1.50
Mazdoor (Unskilled) day 20.86
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00
/cu
m
Generator 33 KVA hour 6.00
Form Work of a+b+c 3.75%
Centering Charges cum

Water
d&e) Overheads & Contractors Profit
cost of 15 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/15
13 Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types of
strata namely sandy soil, clayey soil and rock as
RBR-FNDN-13 shown against each case, complete as per drawing
and technical specifications 1207 MORTH. Depth of
sinking is reckoned from bed level.

Note : To arrive proportionate quantities keeping


the cross sectional area & depth (22/7xd2xh) for
lesser diametre wells than 6m
Unit = Running Meter.
Taking output = 1 m
Diameter of well - 6 m.
(A) Sandy Soil

(i) Depth below bed level upto 3.0 M


Rate of sinking = 0.50 m per hour.
a) Labour
Mate day -
Sinker ( skilled ) day 1.00 238.00
Sinking helper ( semi-skilled ) day 2.12 238.00
b) Machinery
Hire & running charges of crane with grab bucket of hour 2.00 2875.00
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b) 10.00%
c&d) Overheads & Contractors Profit
Rate per metre = (a+b+c+d)
(ii) Beyond 3m upto 10m depth
Rate of sinking = 0.33 m per hour.
a) Labour
Mate day -
Sinker day 1.25 256.00
Sinking helper ( semi-skilled ) day 2.65 238.00
b) Machinery
Hire & running charges of crane with grab bucket of hour 3.00 2875.00
0.75 cum capacity and accessories
Consumables in sinking @10 per cent of (b) 10.00%
c&d) Overheads & Contractors Profit
Rate per metre = (a+b+c+d)
(iii Beyond 10m upto 20m
)
a. Add 5 per cent for every additional meter depth of
sinking over the rate of sinking for the previous meter

SUBSTRUCTURE:-

5 VI R.C.C. grade M 25 (Design Mix) for substructure


items like abutments,piers etc.
Unit = cum
(i) Height upto 5m
Case I : Using concrete Mixer
(a) Material
Cement t 0.403
Coarse sand cum 0.450

20 mm aggregate cum 0.540

10 mm aggregate cum 0.360

(b) Labour
Mate day -
Mason (1st Class) day 0.10
Mazdoor (Unskilled) day 1.39
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40

Generator 33 KVA hour 0.40

Vibrator hour

(d) Formwork @ 10% on (a+b+c) 10.00%


e&f) Overheads & Contractors Profit
Rate per cum = a+b+c+d+e+f
Case II : With Batching Plant, Transit Mixer and
Concrete Pump
Per Cum Basic Cost of Labour, Material & cum 1
Machinery (a+b+c) of Chapter 11.4 (E) Case II
excluding of Formwork
d) formwork
Add on cost of material, labour and machinery (a+b+c) 10.00%
for Formwork
e&f) Overheads & Contractors Profit
Rate perm (a+b+c+d+e+f)

6 Supplying, fitting and placing HYSD bar


reinforcement (Fe 415) in substructure complete as
per drawings and technical specification Clauses
RBR-SBST-6 1002, 1005, 1010 & 1202 MORD / Sections 1600 &
2200 MORTH for Bars below 36 mm dia including
over laps and wastage, where they are not welded.

Unit = t
(a) Material
HYSD bars including 5 per cent overlaps and wastage t 1.050

Binding wire kg 6.000


(b) Labour for cutting, bending, shifting to site,
tying, and placing in position
Mate day -
Blacksmith day 2.000
Mazdoor (Unskilled) day 6.840
c&d) Overheads & Contractors Profit
Rate per t = a+b+c+d
7 Providing weep holes in brick masonry/stone
masonry, plain/reinforced concrete abutment, wing
wall, return wall with 100 mm dia AC pipe extending
through the full width of the structures with slope of
RBR-SBST-9 1(V):20(H) towards drawing face complete as per
drawing and technical specification Clauses 614,
709, 1204.3.7 MORD / 2706 & 2200 MORTH.

Unit = Nos
Taking output = 30 Nos
(a) Material
AC pipe 100 mm dia including wastage @ 5 per cent. m 31.500
Average length of weep hole is taken as one metre for
the purpose of estimating
MS clamps Nos 30.000
.
Collar for AC pipe (average taking 10% of above pipe 10.00%
rate)
Cement mortar 1:3 (For rate refer to item 11.5 I) cum 0.050

(b) Labour
Mate day -
Mason 1st Class day 0.500
Mazdoor (Unskilled) day 0.280
c&d) Overheads & Contractors Profit
Cost for 30 Nos = (a+b+c+d)
Rate per No = (a+b+c+d)/30
Note in MORTH : 1. In case of stone masonry, the size of the weep hole shall be 150 mm x 80
2. For structure in stone masonry, the weep holes shall be deemed to be included in the item
8 Backfilling behind abutment, wing wall and return
wall complete as per drawings & technical
RBR-SBST-10 specification Clause 1204.3.8 MORD / 710.14 of IRC,
78 & 2200 MORTH
Unit = cum
Taking output = 10 cum
I Granular material
(a) Material
Granular material cum 12.000

(b) Labour
Mate day -
Mazdoor (Unskilled) day 7.280
(c) Machinery
Plate compactor / power rammer hour 2.500

Water Tanker hour 0.050

d&e) Overheads & Contractors Profit


Cost for 10 cum of granular backfill = a+b+c+d+e

Rate per cum = (a+b+c+d+e)/10


II Sandy material
Unit = cum
Taking output = 10 cum
(a) Material
Sand cum 12.000

(b) Labour
Mate day -
Mazdoor (Unskilled) day 7.280
(c) Machinery
Plate compactor/power rammer hour 2.500

Water Tanker hour 0.060

d&e) Overheads & Contractors Profit


Cost for 10 cum of granular backfill = a+b+c+d+e

Rate per cum = (a+b+c+d+e)/10


9 Providing and laying filter media with granular
crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the
wall and providing over the entire surface behind
RBR-SBST-11 abutment, wing wall, return wall to the full height,
compacted to firm condition complete as per
drawing and technical specification Clause 1204.3.8
MORD / 710.14 of IRC, 78 & 2200 MORTH

Unit = cum
Taking output = 10 cum
(a) Material
Filter media as per specification cum 12.000

(b) Labour
Mate day -
Mazdoor (Unskilled) day 7.320
Mazdoor (Skilled) day 1.000
c) Machinery
Water Tanker of 6 KL capacity hour 0.060

d&e) Overheads & Contractors Profit


Cost for 10 cum of granular backfill = a+b+c+d+e

Rate per cum = (a+b+c+d+e)/10


Note : Suitable Grade of Filter media shall be proposed as
per Specification in said IRC.
SUPER STRUCTURE :-

10 Providing and laying reinforced cement concrete in


superstructure as per drawing and technical
RBR-SPST-1 specifications Clauses 800, 1205.4 and 1205.5
MORD / Sections 1500, 1600 & 1700 MORTH

Note : 1. Water for CC works : A provision for cost of


water may be added at 1.2 kl / 1 cum (including curing
purpose) keeping the site conditions

2. Coarse aggregate : Single grade nominal size can


also be used instead of graded metal, keeping the site
conditions in view.
I R.C.C grade M 25 (MORD)
(A)

(i) For nominal mix 1:1.5:3 (Using Concrete Mixture)

Height upto 5m to 10m


Unit = cum
(a) Material
Cement t 0.44
Coarse sand cum 0.45
20 mm aggregate cum 0.54
10 mm aggregate cum 0.36
(b) Labour
Mate day -
Mason (1st Class) day 0.10
Mazdoor (Unskilled) day 1.39
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hr / 0.40
cum

e&f) Overheads & Contractors Profit


Rate per cum = a+b+c+d+e+f
II For T-beam & slab
(iii Height above 5m to 10m
)
Basic Cost of Labour, Material & Machinery (a+b+c) for cum 1.00
cum
d) Formwork and staging of (a+b+c) 25.00%
e&f) Overheads & Contractors Profit
Rate per cum = (a+b+c+d+e+f)
11 (i) Supplying, fitting, and placing HYSD bar
reinforcement in superstructure complete as per
drawing and technical specifications Clauses 1002,
RBR-SPST-2 1010 and 1202 MORD / 1600 MORTH, for Bars below
36 mm dia including over laps and wastage, where
they are not welded.
Unit = t
(a) Material
HYSD bars including 5 per cent for laps and wastage t 1.05

Binding wire kg 8.00


(b) Labour for cutting, bending, tying and placing in
position
Mate day -
Blacksmith/ Rod Binder day 3.00
Mazdoor (Unskilled) day 8.44
c&d) Overheads & Contractors Profit
Rate per t = a+b+c+d
12 (i) Providing and laying cement concrete wearing
course M 30 grade including reinforcement
RBR-SPST-5 complete as per drawing and technical
specifications Clauses 800 and 1206.3 MORD and
2702 MORTH
Unit = cum
(a) Material
Cement t 0.407
Sand cum 0.45
20 mm aggregate cum 0.54
10 mm aggregate cum 0.36
HYSD bar reinforcement including binding wire (Rate t 0.075
as per item 13.2) except OH & CP
(b) Labour
Mate day -
Mason (1st Class) day 0.10
Mazdoor (Unskilled) day 1.39
Mazdoor (Unskilled) for cleaning deck slab concrete day 0.15
surface
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40
Generator 33 KVA. hour 0.40
(d) Formwork @ 3% of cost of concrete 3.00%
e&f) Overheads & Contractors Profit
Rate per cum = a+b+c+d+e+f
13 Drainage spouts complete as per drawing and
RBR-SPST-11 technical specifications Clause 1209 MORD & 2705
MORTH
Unit = 1 No
(a) Material
Corrosion resistant structural steel grating including 5 kg 4.00
per cent wastage
G I pipe 100 mm dia m 6.00
GI bolt 10 mm Dia eac 6.00
h
Galvanised MS flat clamp eac 2.00
h
(b) Labour
For fabrication
Mate day -
Blacksmith, Welder etc. (Skilled) day 0.02
Mazdoor (Unskilled) day 0.04
For fixing in position
Mate day -
Mason (1st Class) day 0.01
Mazdoor (Unskilled) day 0.21
Add @ 5 per cent of cost of material and labour (a+b) 5.00%
for electrodes, gas cutting, sealant, anti-corrosive
bituminous paint, mild steel grating etc.
c&d) Overheads & Contractors Profit
Rate per m = a+b+c+d
Note in MORTH : 1. In case of viaducts in urban areas, the drainage spouts should be
2. In case of bridges, sufficient length of G.I Pipe shall be provided to ensure that there is no
14 i Reinforced Cement Concrete M 25 grade approach
slab including reinforcement and formwork
RBR-SPST-13 complete as per drawing and technical
specifications Clauses 800 and 1211 MORD / 1500,
1600, 1700 & 2704 MORTH
Unit = cum
(a) Material
Reinforced cement concrete M 25 grade
Rate as per Item 11 (i) cum 1.00
HYSD reinforcement
Rate per item 2 t 0.05
Rate per cum = (a)
15 (II) Providing and fixing 20 mm thick compressible
fiber board in expansion joint complete as per
(A) drawing and technical specifications MORD
Unit = Running m
Taking output = 7.5 m
(a) Material
20 mm thick compressible fiber board 250 mm deep sqm 1.875

Area = 7.5 x 0.25 = 1.875 sqm


(b) Labour
For carrying, placing and fixing
Mate day -
Mazdoor (Unskilled) day 0.11
Mazdoor (Skilled) day 0.1
c&d) Overheads & Contractors Profit
Cost for 7.5 m = a+b+c+d
Rate per m = (a+b+c+d)/7.5
Amount Remark
Rs. s
6 7

quired, up to 10 per cent


onditions.
added, where required.
238.00
504.56

5750.00

575.00
1024.80
8092.36

320.00
630.70

8625.00

862.50
1513.54
11951.74
le shall be 150 mm x 80
be included in the item
nage spouts should be
ensure that there is no
LEAD STATEMENT

Name of the Work : Construction of high level bridge on the R/F EC Road to Balive

Sl. Description of Material Unit Name of the Lead in Conveyanc Initial Cost
No. Quarry KM e charges

1 2 3 4 5 6 7
1 Coarse Sand for Mortor 1.00 Cum Rajahmundry 16.00 152.00 220.00
2 Coarse Sand for filling 1.00 Cum Rajahmundry 16.00 152.00 70.00
3 HBG 10mm nominal size---SS5 1.00 Cum I.Pangidi 92.00 718.80 560.00
4 HBG 20mm nominal size---SS5 1.00 Cum I.Pangidi 92.00 718.80 844.00
5 HBG 40mm nominal size---SS5 1.00 Cum I.Pangidi 92.00 718.80 500.00
6 Gravel 1.00 Cum Meerjapuram 8.00 83.20 50.50
7 Bricks 1000 Nos. Local 8.00 110.60 3100.00
8 Steel 1.00 MT 34500.00
9 Cement 1.00 MT 4600.00
10 Bitumen 80/100 grade(Bulk) 1.00 MT Visakhapatnam 385.00 1155.00 34708.92
11 Emulsion SS-I grade 1.00 MT Visakhapatnam 385.00 1347.50 23050.40
12 Emulsion RS-I grade 1.00 MT Visakhapatnam 385.00 1347.50 23644.66
14 HBG 2.36 to 5mm size--- 1.00 Cum I.Pangidi 92.00 718.80 260.00
(IRC&MORTH)
15 HBG 5 to 7mm size--- 1.00 Cum I.Pangidi 92.00 718.80 430.00
(IRC&MORTH)
16 HBG 9.5 to 11mm size--- 1.00 Cum I.Pangidi 92.00 718.80 560.00
(IRC&MORTH)
17 HBG 12 to 14mm size--- 1.00 Cum I.Pangidi 92.00 718.80 690.00
18 (IRC&MORTH)
HBG 19 to 22mm size--- 1.00 Cum I.Pangidi 92.00 718.80 950.00
19 (IRC&MORTH)
HBG 25 to 27mm size--- 1.00 Cum I.Pangidi 92.00 718.80 830.00
20 (IRC&MORTH)
HBG 40 to 45mm size--- 1.00 Cum I.Pangidi 92.00 718.80 500.00
21 (IRC&MORTH)
HBG 50 to 55mm size--- 1.00 Cum I.Pangidi 92.00 718.80 390.00
22 (IRC&MORTH)
HBG 60 to 63mm size--- 1.00 Cum I.Pangidi 92.00 718.80 360.00
(IRC&MORTH)

1.Certified that the above leads are correct to the best of my knowledge
Deputy Executive Engineer,
PRI Sub-Division, Eluru
ENT

C Road to Balive

Estimate Amount Rs.334.00 lakhs

Blasting Machine Loading Unloading Total


charges crushing charges charges Amount
charges

8 9 10 11 12
0.00 0.00 34.30 10.90 417.20
0.00 0.00 34.30 10.90 267.20
70.00 140.00 68.30 10.90 1568.00
70.00 211.00 68.30 10.90 1923.00
70.00 0.00 68.30 10.90 1368.00
0.00 0.00 34.30 10.90 178.90
0.00 0.00 134.10 134.10 3478.80
0.00 0.00 34500.00
0.00 0.00 4600.00
0.00 0.00 0.00 0.00 35863.92
0.00 0.00 0.00 0.00 24397.90
0.00 0.00 0.00 0.00 24992.16
70.00 65.00 68.30 10.90 1193.00

70.00 107.50 68.30 10.90 1405.50 1405.50 Seal


coat
70.00 140.00 68.30 10.90 1568.00

70.00 172.50 68.30 10.90 1730.50 1676.3875 OGPC


70.00 237.50 68.30 10.90 2055.50
70.00 0.00 68.30 10.90 1698.00
1481.3333333333
70.00 0.00 68.30 10.90 1368.00 Gr-II
1598.8333333333
70.00 0.00 68.30 10.90 1258.00 Gr-III
70.00 0.00 68.30 10.90 1228.00
Assistant Executive Engineer,
PRI, Eluru
Cross section at Proposed site

24.000

23.000

22.000

21.000

20.000

19.000

18.000

17.000
0 10 20 30 40 50 60 70 80 90 100 110 120 130

Cross section at 400m U/S of the Proposed site

24.000

23.000

22.000

21.000

20.000

19.000

18.000

17.000
0 10 20 30 40 50 60 70 80 90 100 110 120 130
19.000

18.000

17.000
0 10 20 30 40 50 60 70 80 90 100 110 120 130

Cross section at 400m D/S of the Proposed site

24.000

23.000

22.000

21.000

20.000

19.000

18.000

17.000
0 10 20 30 40 50 60 70 80 90 100 110 120 130

L/S from 500m U/S of the Proposed site to 500m D/S

2
-500 -460 -420 -380 -340 -300 -260 -220 -180 -140 -100 -60 -20 20 60 100 140 180 220
4

2
-500 -460 -420 -380 -340 -300 -260 -220 -180 -140 -100 -60 -20 20 60 100 140 180 220
10 120 130

110 120 130


110 120 130

110 120 130

500m D/S

0 100 140 180 220 260 300 340 380 420 460 500
0 100 140 180 220 260 300 340 380 420 460 500
Longitudinal section of channel from 500m U/S of the bridge site to 500m D/S

Chainage Reduced level


-500 5.54
-480 5.45
-460 5.39
-440 5.36
-420 5.33
-400 5.24
-380 5.14
-360 5.12
-340 5.1
-320 5
-300 4.9
-280 4.88
-260 4.86
-240 4.76
-220 4.65
-200 4.64
-183 4.58
-160 4.55
-140 4.46
-120 4.36
-100 4.34
-80 4.32
-60 4.22
-40 4.16
-20 4.06
0 4.04
20 3.98
40 3.96
60 3.85
80 3.8
100 3.74
120 3.7
140 3.62
160 3.58
180 3.5
200 3.41
220 3.38
240 3.35
260 3.26
280 3.16
300 3.14
320 3.12
340 3.02
360 2.96
380 2.88
400 2.84
420 2.8
440 2.72
460 2.66
480 2.6
500 2.54
Hydraulic design

Hydraulic Particulars:-

1.Maximum Flood Level 22.24m

2.Ordinary Flood level 20.04m

3.Lowest Bed level 18.03m

4.Average bed slope 0.00500

5.Rugosity Coefficient 0.030

6.Bottom of deck proposed 23.34m

7.Road Crest level 24.690m

8.Width of carriage way 7.50m

Discharge Calculations:-

1)Area Velocity method:-

a)At the proposed bridge site:-

Maximum Flood level 22.24m


Slope 0.0050
Rugosity Coefficient 0.030

S.No Chainage R.L Depth of Average Distance Area


flow depth of (m) (Sqm)
(m) flow
(m)

1 0 23.340 0.00 0.00 0.00 0.00


2 5 23.240 0.00 0.00 5.00 0.00
3 10 20.210 2.03 1.02 5.00 5.08
4 15 18.940 3.30 2.67 5.00 13.33
5 20 18.940 3.30 3.30 5.00 16.50
6 25 19.090 3.15 3.23 5.00 16.13
7 30 19.390 2.85 3.00 5.00 15.00
8 35 18.940 3.30 3.08 5.00 15.38
9 40 18.940 3.30 3.30 5.00 16.50
10 45 18.790 3.45 3.38 5.00 16.88
11 50 19.340 2.90 3.18 5.00 15.88
12 55 18.030 4.21 3.56 5.00 17.78
13 60 18.94 3.30 3.76 5.00 18.78
14 65 18.94 3.30 3.30 5.00 16.50
15 70 18.69 3.55 3.43 5.00 17.13
16 75 18.94 3.30 3.43 5.00 17.13
17 80 19.19 3.05 3.18 5.00 15.88
18 85 18.74 3.50 3.28 5.00 16.38
19 90 18.94 3.30 3.40 5.00 17.00
20 95 18.94 3.30 3.30 5.00 16.50
21 100 18.94 3.30 3.30 5.00 16.50
22 105 18.94 3.30 3.30 5.00 16.50
23 110 21.31 0.93 2.12 5.00 10.58
24 115 21.54 0.70 0.82 5.00 4.08
25 120 23.59 0.00 0.35 5.00 1.75
26 128.8 23.69 0.00 0.00 8.80 0.00
333.10

Hydraulic Radius R= Total area/Wetted perimeter = 2.76

Velocity V = 1/nX(R2/3XS1/2) 4.64m/sec

Discharge Q = AXV 1545.58Cumecs

b)At 400m downstream of proposed bridge site(As per IRC SP-13):-

Maximum Flood level 22.14m


Slope 0.0050
Rugosity Coefficient 0.030

S.No Chainage R.L Depth of Average Distance Area


flow depth of (m) (Sqm)
(m) flow
(m)

1 0 23.240 0.00 0.00 0.00 0.00


2 5 23.140 0.00 0.00 5.00 0.00
3 10 20.110 2.03 1.02 5.00 5.08
4 15 18.840 3.30 2.67 5.00 13.33
5 20 18.840 3.30 3.30 5.00 16.50
6 25 18.990 3.15 3.23 5.00 16.13
7 30 18.890 3.25 3.20 5.00 16.00
8 35 18.840 3.30 3.28 5.00 16.38
9 40 18.840 3.30 3.30 5.00 16.50
10 45 18.690 3.45 3.38 5.00 16.88
11 50 18.320 3.82 3.64 5.00 18.18
12 55 18.230 3.91 3.87 5.00 19.33
13 60 18.400 3.74 3.83 5.00 19.13
14 65 18.400 3.74 3.74 5.00 18.70
15 70 18.380 3.76 3.75 5.00 18.75
16 75 18.560 3.58 3.67 5.00 18.35
17 80 18.590 3.55 3.57 5.00 17.83
18 85 18.640 3.50 3.53 5.00 17.63
19 90 18.840 3.30 3.40 5.00 17.00
20 95 18.540 3.60 3.45 5.00 17.25
21 100 18.840 3.30 3.45 5.00 17.25
22 105 18.580 3.56 3.43 5.00 17.15
23 110 20.790 1.35 2.46 5.00 12.28
24 115 21.440 0.70 1.03 5.00 5.12
25 120 23.490 0.00 0.35 5.00 1.75
26 127 23.590 0.00 0.00 7.00 0.00
352.45

Hydraulic Radius R= Total area/Wetted perimeter = 2.93

Velocity V = 1/nX(R2/3XS1/2) 4.83m/sec

Discharge Q = AXV 1702.33Cumecs

c)At 400m Upstream of proposed bridge site(As per IRC SP-13):-

Maximum Flood level 22.34m


Slope 0.0050
Rugosity Coefficient 0.030

S.No Chainage R.L Depth of Average Distance Area


flow depth of (m) (Sqm)
(m) flow
(m)

1 0 23.440 0.00 0.00 0.00 0.00


2 5 22.770 0.00 0.00 5.00 0.00
3 10 20.310 2.03 1.02 5.00 5.08
4 15 19.340 3.00 2.52 5.00 12.58
5 20 19.180 3.16 3.08 5.00 15.40
6 25 19.190 3.15 3.16 5.00 15.78
7 30 19.030 3.31 3.23 5.00 16.15
8 35 19.310 3.03 3.17 5.00 15.85
9 40 19.270 3.07 3.05 5.00 15.25
10 45 19.180 3.16 3.12 5.00 15.58
11 50 19.100 3.24 3.20 5.00 16.00
12 55 19.100 3.24 3.24 5.00 16.20
13 60 19.340 3.00 3.12 5.00 15.60
14 65 19.230 3.11 3.06 5.00 15.28
15 70 19.270 3.07 3.09 5.00 15.45
16 75 19.230 3.11 3.09 5.00 15.45
17 80 19.290 3.05 3.08 5.00 15.40
18 85 19.140 3.20 3.13 5.00 15.63
19 90 19.040 3.30 3.25 5.00 16.25
20 95 19.040 3.30 3.30 5.00 16.50
21 100 19.320 3.02 3.16 5.00 15.80
22 105 19.230 3.11 3.07 5.00 15.33
23 110 20.520 1.82 2.47 5.00 12.33
24 115 21.640 0.70 1.26 5.00 6.30
25 120 23.690 0.00 0.35 5.00 1.75
26 127 23.790 0.00 0.00 7.00 0.00
320.90

Hydraulic Radius R= Total area/Wetted perimeter = 2.66

Velocity V = 1/nX(R2/3XS1/2) 4.53m/sec

Discharge Q = AXV 1453.68Cumecs

Maximum Discharge = 1854.70Cumecs

Maximum Velocity = 5.57m/sec

Ventway Calculations(H.F.L Condition):-

Assuming afflux = x = 0.15m


Width of channel at H.F.L = 110.06m
Clear span = 10.99m
Depth of flow = di = 4.21m

Head due to velocity of approach = (Vmax2/2g)X[di/(di+x)]2 1.473m

Combined head due to Velocity of approach and hi = 1.623m


afflux

Velocity through vents Vv = 0.90X(2ghi)1/2 = 5.08m/sec

Linear water way required LWW = Qd/(VvXdi) = 86.74m

No.of vents required = LWW /LC = 7.8926296633

As per the width of the river = 8.8118494796


at H.F.L

No.of vents to be provided 9Nos

No.of piers = 8Nos

Afflux Calculations(H.F.L Condition):-


Un obstructed area of cross section = A = 333.10Sqm

Total vented area provided = No.of ventsXClear spanX(BDL-LBL) = 525.21Sqm

Which is greater than the Un obstructed area of cross section

Using Orifice formula for calculation of discharge

Q = Co X (2g)1/2 X L X Dd X [h+(1+e)u2/2g]1/2

In the present case,

Linear water way = L = 98.91m


Un obstructed width = W = 110.06m

L/W = 0.8986916228

Corresponding to this value the coefficient Co = 0.89


Corresponding to this value the coefficient e = 0.6

Hence

448.61 = 0.89X4.43X69X3.7X[h+1.6u 2/2g]1/2

0.1986318 = h + 0.0815u2

At just upstream of the bridge

Q = W X (Dd + h) X u

448.61 = 80X[3.70+h]u

u = 5.607/(3.70+h)

Substituting

0.1986 = h + 0.0815[5.607/(3.70+h)]2

Solving h = 1.4 cm,hence,it can be neglected

Scour Depth Calculations:-

Discharge for design of foundations = 1.30XMax.Discharge =


Lacey's Silt factor for medium silt = 1.76Xm1/2 =

Discharge per metre width of foundations = q =

Normal scour depth D = 1.34(q2/f)1/3 =


Maximum scour depth Dm = 1.3XD =

Depth of foundation = Dm + Max.of 1.2m or 1/3 D m =

Bottom level of foundation =

Depth of foundation below low bed level =

Asst.Executive Engineer Dy.Executive Engineer


PRI,Eluru PRI,Eluru
Wetted
perimeter
(m)

0.00
0.00
5.24
5.45
5.70
5.23
5.45
5.07
5.00
5.02
5.21
5.04
5.34
5.12
5.01
5.02
5.03
5.07
5.03
5.00
5.00
5.00
6.45
5.03
5.97
0.00
120.48

Wetted
perimeter
(m)

0.00
0.00
5.24
5.45
5.70
5.23
5.45
5.07
5.00
5.02
5.21
5.04
5.34
5.12
5.01
5.02
5.03
5.07
5.03
5.00
5.00
5.00
6.45
5.03
5.97
0.00
120.48

Wetted
perimeter
(m)

0.00
0.00
5.24
5.45
5.70
5.23
5.45
5.07
5.00
5.02
5.21
5.04
5.34
5.12
5.01
5.02
5.03
5.07
5.03
5.00
5.00
5.00
6.45
5.03
5.97
0.00
120.48
2466.75Cumecs
0.85

24.939

11.81m
15.35m

16.55m

5.69m

12.34m

xecutive Engineer
Name of the Work : Construction of high level bridge on the R/F EC Road to Balive

Name of the sub work : Bridge Approaches

S.No Description of Item Quantity Rate per

1 2 3 4 5

1 Earthwork in excavation for removal of unsuitable material levelling,compaction

through mechanical means, cost of hire charges for plant and machinary, labour

charges as per drawing and technical specification including setting out, removal

of stumps and other deleterious matter , dressing sides of bottom, etc., complete

including seignoarge charges for finished item of work as per mort&h specification

304(4 th Revision) Excluding Bailing out water charges and as per approved

reinforced soil wall drawing.

2708.000 48.00 cum


cum
2 Vibrated cement concrete M 15 Grade Concrete using max. size of 40mm hard
broken graded granite metal (SS-5)and 20mm and 10mm size HBG crushed
stone aggregate (SS-5) including cost,seignorage and conveyance of cement and
all materials to site and all labour charges for machine mixing,laying in position,
Compacting , Vibrating and curing including all other incidental and all other
operational charges of T&P required etc., complete as per MoRT&H Specification
1500,1700, 2100 (4th Revision)for levelling pad as per approved reinforced soil
wall drawing.
83.00 3987.00 cum
cum
3 Construction of Reinforced Soil Wall (designed for 100 years life) which includes
designs, detailed drawings, procurement of all the required material for concrete
(M35 grade) for panels/blocks for facia , required reinforcement, all necessary
accessories, geotextile material for wrapping the reinforced soil layers and drain
pipe, all required machinary, labour, form work, supervision, quality checks,
coordinating wall construction with soil filling behind walls ( as per reinforced soil
wall approved design and drawing ), defect liability period, all leads , lifts and
temporary form work if necessary complete for finished item of work for different
ranges of heights (2.0m increments) in accordance with MORTH specification
1500,1600,1700 ,2200 & 3100 for materials, construction and quality (excluding
foundation block/pad & ground improvement,fill material/ compaction etc..) in the
Height range.

(The designs shall be got finally approved by the department prior to execution of
the reinforced soil wall which is mandatory.Performance guarantee for 10 years
shall also be furnished along with designs).
Surface
Height Rate/Sqm
area
0-2.0m 18.00 3043.00
2.0-4.0m 275.37 3043.00
4.0-6.0m 543.75 3381.00
6.0-8.0m 333.75 3883.00

4 Providing and laying well graded drainage fill by 450mm thick composed of 22-
19mm, 11.2-9.5mm, 7-5mm and down grade of well graded aggregates as per
drawing and techinical specification and including cost,seignorage and
conveyence of all the materials to site and all labour charges, drain pipes wrapped
with geotextile, hire charges of plant and machinary for laying filter media,
including technical supervision as directed by Engineer-in-charge for finished item
of work for drainage layers behind the facia as per approved reinforced soil wall
drawing.
535.25 1795.00 cum
cum
5 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm hard
broken graded granite crushed metal (SS-5) including cost, seigniorage
conveyance of all materials to site and labour charges, centering, machine mixing,
laying, vibrating, curing etc., including other incidental hire and operational
charges of all T&P and all water leads ets.,complete as per apporoved drawings
and as directed during execution but excluding cost of steel and its fabrication
charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200
(4th revision ) and as directed by the Engineer-in-Charge for coping beam on top
of concrete pannels/facia Blocks as per approved drawing of reinforced soil
wall.
16.50 4542.00 cum
cum
6 Providing and fixing 'W' metal beam crash barrier comprising 3mm thick

corrugated sheet metal beam rail,70cm above road/ground level fixed on ISMC

series channel series channel vertical post,150 x 75 x 5 mm spaxced 2m centre

to centre.1.80m heigh,1.10m b
397.00 1600.00
Rm Rm
7 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of

all diameters including cost and conveyance of steel to site and all labour charges

for fabrication of reinforcement including cutting, bending, binding rods, tying grills,

placing them in position etc., complete including cost and conveyance of binding

wire and all handling charges and operational charges etc., and including over

lapping welding if required etc., complete for all R.C.C items for finished item of

work as per standard drawings, as per the directions of the Engineer-in-Charge

and as per MoRT&H specification 1600 &2200 (4th revision) and as per I.S.1786

of 1985 for friction slab, crash barrier [in non-viaduct, (REwall) portion] etc.
2.00 59415.00 MT
MT
Sub-Total=

TOTAL =
R/F EC Road to Balive

Amount
6

129984

330921
54774
837951
1838419
1295951

960774
74943

635200

118830
6277747

62,77,747
SUB-ESTIMATE

Name of the Work : Construction of high level bridge on the R/F EC Road to Balive

Name of the sub work : Bridge Proper Estimate Amount Rs.597.00 lakhs

S.No Description of item Nos Measurements Quantity Rate Per


Length Bredth Depth

1 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1
including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches
with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

Return walls 1X4 3.00 1.80 6.00 129.60Cum


129.60Cum 110.60 1.00Cum

2 Providing concrete for plain/reinforced concrete in open foundations using 40 mm nominal size
Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by
vibration including curing for 14 days complete as per drawings and technical specifications
Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.M10 Grade for bed
concrete

Return walls 1X4 3.00 1.80 0.15 3.24Cum 3452.00 1.00Cum

Providing and laying cement concrete wearing course M 30 grade including reinforcement
complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702
MORTH

Approach slab 1X2 3.00 7.45 0.3 13.41Cum 5213.00 1.00Cum

3 Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation
complete as per Drawing and Technical Specification 1204, 1900 MORTH.

Piers 1X8 3.14*5.15 0.0542 7.012MT


Abutments 1X2 3.14*6.65 0.0542 2.264MT
9.276MT 67000.00 1.000MT
S.No Description of item Nos Measurements Quantity Rate Per
Length Bredth Depth
4 Plain/Reinforced Cement Concrete M25 Design mix, in Well Foundation complete as per Drawing
and Technical Specification 1200, 1500 & 1700 MORTH.for well kerb

Piers 1X8 10.681Cum 85.449Cum

Abutments 1X2 13.958Cum 27.917Cum

113.366Cum 6235.00 1Cum

5 Plain/Reinforced Cement Concrete M25 Design mix, in Well Foundation complete as per Drawing
and Technical Specification 1200, 1500 & 1700 MORTH.for well steining

Piers 1X8 3.14*4.4 0.60 11.8 782.538Cum

Abutments 1X2 3.14*5.75 0.75 11.8 319.574Cum

1102.112Cum 6458.00 1Cum

6 Plain/Reinforced Cement Concrete M25 Design mix, in Well Foundation complete as per Drawing
and Technical Specification 1200, 1500 & 1700 MORTH.for top plugging

Piers 1X8 3.14*(3.8*3.8)/4 ---- 0.5 45.342Cum


Abutments 1X2 3.14*(5.0*5.0)/4 ---- 0.5 19.625Cum
64.967Cum 6345.00 1Cum

7 Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types of
strata namely sandy soil, clayey soil and rock as shown against each case, complete as per
drawing and technical specifications 1207 MORTH. Depth of sinking is reckoned from bed level.

Piers
Upto 3m below GL 1X8 ---- ---- 3.00m 24.00m 8092.36 1.00m
From 3 to 10m below GL 1X8 ---- ---- 7.00m 56.00m 11951.74 1.00m
From 10 to 20m below GL 1X8 ---- ---- 1.00m 8.00m 12549.33 1.00m
S.No Description of item Nos Measurements Quantity Rate Per
Length Bredth Depth
1X8 ---- ---- 1.00m 8.00m 13176.79 1.00m
1X8 ---- ---- 1.00m 8.00m 13835.63 1.00m
1X8 ---- ---- 1.00m 8.00m 14527.41 1.00m
1X8 ---- ---- 1.00m 8.00m 15253.79 1.00m
1X8 ---- ---- 1.00m 8.00m 16016.47 1.00m
Abutments
Upto 3m below GL 1X2 ---- ---- 3.00m 6.00m 8092.36 1.00m
From 3 to 10m below GL 1X2 ---- ---- 7.00m 14.00m 11951.74 1.00m
From 10 to 20m below GL 1X2 ---- ---- 1.00m 2.00m 12549.33 1.00m
1X2 ---- ---- 1.00m 2.00m 13176.79 1.00m
1X2 ---- ---- 1.00m 2.00m 13835.63 1.00m
1X2 ---- ---- 1.00m 2.00m 14527.41 1.00m
1X2 ---- ---- 1.00m 2.00m 15253.79 1.00m
1X2 ---- ---- 1.00m 2.00m 16016.47 1.00m
1X2 ---- ---- 1.00m 2.00m 16817.30 1.00m
1X2 ---- ---- 1.00m 2.00m 17658.16 1.00m
1X2 ---- ---- 1.00m 2.00m 18541.07 1.00m
1X2 ---- ---- 1.00m 2.00m 19468.13 1.00m

8 Plain/Reinforced Cement Concrete M25 Design mix, in Well Foundation complete as per Drawing
and Technical Specification 1200, 1500 & 1700 MORTH.for bottom plugging

Piers 1X8 3.14*(3.8*3.8)/4 ---- 0.60 54.410Cum


5.15-0.20=4.95,(4.95+3.80)/2 = 4.374 1X8 3.14*(4.37*4.37)/4 ---- 1.15 138.170Cum
For Concave portion 2/3(dXd)h 1X8 2/3(4.95*4.95) ---- 0.385 50.337Cum

Abutments 1X2 3.14*(5.0*5.0)/4 ---- 0.60 23.550Cum


6.65-0.20=6.45,(6.45+5.0)/2 = 5.725 1X2 3.14*(5.73*5.73)/4 ---- 1.415 72.813Cum
For Concave portion 2/3(dXd)h 1X2 2/3(6.45*6.45) ---- 0.485 26.916Cum
366.196Cum 5678.00 1Cum

9 Sand filling in between top and bottom pluggings including cost and conveyance of all materials
and all labour charges etc.complete
S.No Description of item Nos Measurements Quantity Rate Per
Length Bredth Depth
Piers 1X5 3.14*(3.8*3.8)/4 ---- 11.3 640.450Cum
Abutments 1X2 3.14*(5.0*5.0)/4 ---- 11.3 443.525Cum
1083.975Cum 1180.00 1Cum

10 Plain/Reinforced Cement Concrete M25 Design mix, in Well Foundation complete as per Drawing
and Technical Specification 1200, 1500 & 1700 MORTH.for WELL CAP

Piers 1X8 3.14*(5.0*5.0)/4 ---- 1.2 188.400Cum


Abutments 1X2 3.14*(8.5*8.5)/4 ---- 1.2 136.119Cum
324.519Cum 6890.00 1Cum

11 Supplying, fitting, and placing HYSD bar reinforcement in foundation complete as per drawing
and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below
36 mm dia including over laps and wastage, where they are not welded.

230999Kg 67000.00 1000Kg

12 R.C.C. grade M 25 (Design Mix) for substructure items like abutments,piers bed blocks,return
walls etc.

Piers 1X8 3.14*(2.5*2.5)/4 ---- 8.395 329.504Cum


Abutments 1X2 8.45 2.0 9.295 149.231Cum
Hammer head bed blocks(Rectangular) 1X8 6.00 2.5 0.6 72.000Cum
Hammer head bed blocks(Trapezoidal) 1X8 (6.0+2.5)/2 2.5 0.6 51.000Cum
Return walls 1X4 3 0.5 10.891 65.346Cum
Backing wall: 1X2 8.45 0.3 1.896 9.613Cum
Abutment caps 1X2 8.45 2.2 0.3 10.901Cum
Bearing pedastals 1X30 0.83 0.42 0.15 1.569Cum
Pier pedastals 1X8 2.5 2.5 0.5 25.000Cum
667.081Cum 6540.00 1Cum

13 Supplying, fitting, and placing HYSD bar reinforcement in substructure complete as per drawing
and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below
36 mm dia including over laps and wastage, where they are not welded.
S.No Description of item Nos Measurements Quantity Rate Per
Length Bredth Depth

100062Kg 67000.00 1000Kg

14 Supplying and fixing of fully moulded type Neoprene Rubber Bearing of 500X320X84mm size
including the cost and conveyance of bearings and labour charges for fixing the same in position
confirming to specifications stipulated in specification for bridges and road works of MORTH
drawings.

Abutments 1X6 63.00 22.00 6.10 50727.60cc


Piers 1X24 63.00 22.00 6.10 202910.40cc
253638.00cc 2.80 1.00cc

15 Providing and laying reinforced cement concrete in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH for
M25 grade concrete for deck slab

Deck slab 1X9 41.30 ---- ---- 371.700Cum


Kerbs 1X4 119.03 0.22 ---- 104.746Cum
476.446Cum 7890.00 1Cum

16 Providing and laying cement concrete wearing course M 30 grade including reinforcement
complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702
MORTH

Over Deck slab 1X9 12.47 7.50 0.075 63.129Cum


Over approach 1X2 3.00 7.50 0.075 3.375Cum
66.504Cum 6890.00 1Cum

17 Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork
complete as per drawing and technical specifications Clauses 800 and 1211 MORD / 1500, 1600,
1700 & 2704 MORTH

Approach Slab 1X2 3.00 7.45 0.300 13.410Cum 7910.00 1Cum


S.No Description of item Nos Measurements Quantity Rate Per
Length Bredth Depth
18 Reinforced Cement Concrete M 25 grade hand rails including reinforcement and formwork
complete as per drawing and technical specifications Clauses 800 and 1211 MORD / 1500, 1600,
1700 & 2704 MORTH

Over Deck slab 1X12 12.47 ---- ---- 149.64m


Over approach 1X4 3.00 ---- ---- 12.00m
161.64m 1230.00 1.00m

19 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per
drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for
Bars below 36 mm dia including over laps and wastage, where they are not welded.

95289Kg 67000.00 1000Kg

20 Rough stone packing for revetment with concrete grouting using CC(1:4:8) using 300mm size
Rough stone including cost and conveyance of all materials and all labour charges etc.complete

Quadrants 1X4 3.14*(6.59*6.59) ---- 1.414*0.3 57.846Cum 670.00 1Cum

21 Providing gravel backing 150mm thick under revetment including cost,sienorage and
conveyance of all materials to site including all labour charges etc.complete

1X4 3.14*(6.59*6.59) ---- 1.414*0.15 28.923Cum 450.00 1Cum

22 Backfilling behind abutment, wing wall and return wall complete as per drawings & technical
specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH

1X2 3.15 6.25 10.880 428.400Cum 670.00 1Cum


S.No Description of item Nos Measurements Quantity Rate Per
Length Bredth Depth
23 Providing and laying filter media with granular crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the
wall and providing over the entire surface behind abutment, wing wall, return wall to the full height,
compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
MORD / 710.14 of IRC, 78 & 2200 MORTH

Length=7.45-0.6+2(3.75-0.3) = 13.75m 1X2 13.75 0.60 10.880 179.520Cum 1070.00 1Cum

24 Drainage spouts complete as per drawing and technical specifications Clause 1209 MORD & 2705
MORTH

1X36 ---- ---- ---- 36Nos 2500.00 1Nos

25 Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per
drawing and technical specifications MORD

1X10 ---- ---- ---- 10Nos 4500.00 1Nos

26 Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing
wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with
slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification
Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

Abutments 1X96 0.95 ---- ---- 91.20m


Return walls 1X84 0.50 ---- ---- 42.00m
133.20m 230.00 1.00m

27 Provision for Caution Boards. ----------------------------- LS --------------------------------------------------------

28 Provision for VAT@5% --------------LS--------------------

29 Provision for engaging technical person --------------LS--------------------

30 Provision for insurance --------------LS--------------------


S.No Description of item Nos Measurements Quantity Rate Per
Length Bredth Depth

31 Provision for unforeseen items ----------------------------- LS --------------------------------------------------------

TOTAL

Asst.Executive Engineer Dy.Executive Engineer


PRI,Eluru PRI,Eluru
s.597.00 lakhs

Amount

14334

11184

69906

621492
Amount

706836

7117438

412213

194217
669297
100395
Amount

105414
110685
116219
122030
128132

48554
167324
25099
26354
27671
29055
30508
32033
33635
35316
37082
38936

2079261
Amount

1279091

2235936

15476966

4362710
Amount

6704164

710186

3759162

458215

106073
Amount

198817

6384382

38757

13015

287028
Amount

192086

90000

45000

30636

10000

2774642

1109857

277464
Amount

45193

59700000