In several cases we use back ush. Back ush ensures automatic goods issue and we don’t have
to do manual issue of goods in production/process
https://blogs.sap.com/2013/12/30/backflush-and-its-priority-in-use/ 1/7
7/2/2018 Backflush and its priority in use | SAP Blogs
order. The setting of back ush are in di erent levels in SAP. First setting is there in material
master.
First option is always the material will be issued automatically. Second option is issue will be
decided by the work center.
Now let us consider the material master setting is “Work center decides whether to back ush”
and in work center the box for back ush is
checked, then the material which will be used/consumed in this work center will be back ushed.
https://blogs.sap.com/2013/12/30/backflush-and-its-priority-in-use/ 2/7
7/2/2018 Backflush and its priority in use | SAP Blogs
If the back ush in work center is not checked and material master setting is “Work center
decides whether to back ush”, then also back ush will
not work as work center is not still activated for back ush.
The third place where the back ush is maintained is in routing. At the time of component
allocation the back ush option is visable.
In this case if the back ush is checked then this component will be back ush automatically. So
if material master is not set as back ush as well
https://blogs.sap.com/2013/12/30/backflush-and-its-priority-in-use/ 3/7
7/2/2018 Backflush and its priority in use | SAP Blogs
work center is not set also, from the setting of routing it is possible to set the back ush. Hence
the material will be issued automatically for this
routing only(once executing the production/process order). Issue will not happen for the
component everywhere.
Fourth place where we can use the back ush is in production/process order. In order, go to
material tab.
Inside that, check box for back using is there. Hence if this box is selected, the the component
will be issued automatically.
The setting of back ush are there to serve di erent purpose in di erent levels/stages. One can
use it for desired purpose and application.
Alert Moderator
https://blogs.sap.com/2013/12/30/backflush-and-its-priority-in-use/ 4/7
7/2/2018 Backflush and its priority in use | SAP Blogs
6 Comments
You must be Logged on to comment or reply to a post.
Former Member
dear Das, really nice information about the backflush…….. Amol Datir
Thanks Amol.
Regards,
Krishnendu.
https://blogs.sap.com/2013/12/30/backflush-and-its-priority-in-use/ 5/7
7/2/2018 Backflush and its priority in use | SAP Blogs
Trivedi Parsa
This text is very useful. Please add this comment at the end to make it crisp and clear.
“So the various levels at which we can enable the backflush are
Material master -> Work Center -> Routing -> Production Order. “
Former Member
Former Member
Regards,
Leo
https://blogs.sap.com/2013/12/30/backflush-and-its-priority-in-use/ 6/7
7/2/2018 Backflush and its priority in use | SAP Blogs
Former Member
Hi Krishnendu Das,
Regards,
@KRK@.
Share & Follow Privacy Terms of Use Legal Disclosure Copyright Trademark Sitemap Newsletter
https://blogs.sap.com/2013/12/30/backflush-and-its-priority-in-use/ 7/7