BUDGETARY COST SUMMARY OF WAREHOUSE AND HANDLING SHED
b) Steel Work: ( Super structure Member Built up section 5,576.21 sqm 8,177.60 45,600,000.00
Column,Rafter, Galvanized Z Purlin ,Base plate, End plate,
Connection plate, Cleat, ridge caping,Ridge Ventilator,Louver
window, rolling shutter(Motorised and non Motorised both option),
FR Insulation, Painting, Sheeting, instllation of two hour fire rating
sandwich pane,double glazed fixed unit Skylight having size
48”x84”, quality Turbine Ventilator,fall attest life line system, cage
ladder etc.and Erection )
b) Steel Work: ( Super structure Member Built up section 929.37 sqm 6,025.60 5,600,000.00
Column,Rafter, Galvanized Z Purlin ,Base plate, End plate,
Connection plate, Cleat, ridge caping,Ridge Ventilator,Louver
window, rolling shutter (Non-Motorised), FR Insulation, Painting,
Sheeting etc.and Erection )
b) Plumbing work: ( Commod & basin of Cotton band, and other 185.87 sqm 3,228.00 600,000.00
plumbing accessories etc.)
5 Boundary wall
a) Civil work: (Footing, Column, grade Beam, Lintel or coping 969.69 rm 22,500.00 21,818,048.49
beam, Brick wall, Plaster or groove plaster painting and barbed
waire.)
6 Culvert :
a) Civil work: ( Compacted Sand Khoa filling in foundation 55.76 sqm 59,180.00 3,300,000.00
trenches,Bottom slab,R C C Wall, guter Beam, coping beam, Brick
wall, Plaster etc.
7 Guard House :
b) Steel Works :Supplying, fabrication, fixing and installation of 1.00 nos 450,000.00 450,000.00
M.S. gate (Single leaf Sliding, Size 9885 mm x 3000 mm)
11 Fire hydrant & Fire Alarm Works : as per design 6,719.33 sqm 1,936.80 13,014,000.00
17.11752122
17117521220
3000