QC~PLAN.

Project No. & Name:


Name of Client/ Consultant:

SL. ACTIVITY CONTROLLING NATURE & EXTENT ACCEPTANCE PERSON RESP.


No. DOCUMENT OF INSP./TEST CRITERIA AT LOCATION
1 Surface preparation Contract Visual, 100% -free from cracks Engineer /
Specifications, and efflorescence. Foremen/
Manufacturer's -dry, free from laitence, alkali Quality Engineer
Instructions and any other contamination
-all cracks and holes(if any) to
be made good with suitable
mortar of 1:3 (cement: sand) if
not specifed
- Loose materials, dust to be
removed with either vigorous
brushing or with abrasive
paper
2 Type of paint system Drawings & Verification, 100% - Painted to system Engineer /
Specification specified / approved Foremen/
Quality Engineer

3 Check paint application Manufacturer's Verification, 100% - Applied to Engineer /


Instructions Manufacturer's instructions Foremen/
Quality Engineer

4 Final Inspection Contract Visual, 100% -No of specified coats done to Engineer /
Specifications, be checked Foremen/
Manufacturer's - Final appearance as per Contract Quality Engineer
Instructions Specifications
QC~PLAN.
Painting
Doc. No. CIVIL QC~Plan- 022/ REV. 0

RECORD

Painting - Insp. Report


CIVIL QC~Form- 022-01/ REV 0
Daily Painting log
CIVIL QC~Form- 022-02/ REV 0

Painting - Insp. Report


CIVIL QC~Form- 022-01/ REV 0
Daily Painting log
CIVIL QC~Form- 022-02/ REV 0

Painting - Insp. Report


CIVIL QC~Form- 022-01/ REV 0
Daily Painting log
CIVIL QC~Form- 022-02/ REV 0
Painting - Insp. Report
CIVIL QC~Form- 022-01/ REV 0
Daily Painting log
CIVIL QC~Form- 022-02/ REV 0