Date HS Code Description Unit Quantity Country Discharge (INR) (INR) Oct BONNET REBUILD KIT FOR SHEAR BONNET United 21 84819090 Bombay Sea NOS 4 314,048 78,512 (PROCUREMENT OF SPARES FOR BOP) States 2016 Sep BONNET REBUILD KIT,13-3/10K U BOP PP United 22 84849000 Kolkata Sea NOS 4 471,765 117,941 ST(ANNULAR AND RAM BOPSPARES) States 2016 Jul 23 644860-07 BONNET REBUILD KIT 13 -10M T-U United 40169390 Ahmedabad KGS 2 37,517 18,759 2016 LB States Jul 08 OILWELL DRILLING RIG SPARE: 644831-12-70 United Nhava Sheva 84849000 NOS 1 143,701 143,701 2016 BONNET REBUILD KIT, 13-15K U BOP PP ST States Sea May OILWELL DRILLING RIG SPARE: 644860-08-70 Bombay Air 07 84849000 Singapore NOS 2 389,114 194,557 BONNET REBUILD KIT, 13-15K U BOP LBS ST Cargo 2016 2 ST KIT, REBUILD BONNET SEAL FOR 21-1/4- Apr 2M U-BOP NOTE KIT CONTAINS ENOUGH FOR United Nhava Sheva 27 40169330 KGS 38 200,837 5,356 1 BONNET IE 2 SETS REQUIRED FOR SINGLE States Sea 2016 BO Dec 2164210-10-70 BONNET REBUILD KIT, 13-15K U United Bombay Air 15 84819090 NOS 2 350,168 175,084 BOP PP HT (OILWELL DRILLING RIG SPARE) States Cargo 2015 Dec 2164210-11-70 BONNET REBUILD KIT, 13-15K U United Bombay Air 15 84819090 NOS 1 203,952 203,952 BOP LB HT (OILWELL DRILLING RIG SPARE) States Cargo 2015 Oct OIL WELL SUPPLIES: CUSTOMER MATERIAL United 84819090 Bombay Sea UNT 16 2,011,911 125,744 03 NO.320018198,644909-03-70 BONNET REBUILD States 2015 KIT, 13-3/10K U BOP PP ST PN.644909-13 I Sep 2164210-11-70 REBUILD KIT FOR BONNET United Bombay Air 11 84819090 LARGE BORE (COC REQUIRED) (OILWELL PCS 1 229,887 229,887 States Cargo 2015 DRILLING RIG SPARE) Sep 2164210-10-70 BONNET REBUILD KIT, 13-5/8 - United Bombay Air 11 84819090 1515M BOP (COC REQUIRED) (OILWELL PCS 1 197,348 197,348 States Cargo 2015 DRILLING RIG SPARE) Feb KIT, BONNET, REBUILD-2163135-02-SPARE United Chennai Air 25 84314390 NOS 2 473,718 236,859 PARTS FOR OIL WELL EQUIPMENTS/RIG States Cargo 2015 Jan 20 KIT, BONNET, REBUILD-2163135-02-SPARE United Chennai Air 84314390 NOS 2 496,354 248,177 2015 PARTS FOR OIL WELL EQUIPMENTS/RIG States Cargo Dec 2164210-10-70 BONNET REBUILD KIT, 13-15K U United Bombay Air 19 84819090 NOS 1 240,788 240,788 BOP P (OILWELL DRILLING RIG SPARE) States Cargo 2014 Sep United 09 84314990 REBUILD KIT BONNET 13-15K Chennai Sea NOS 8 737,345 92,168 States 2014 BONNET REBUILD KIT,7-1/16 3,5,10,PN.644909- Jul 09 United 84314390 01-70 (SUPPLY OF SPARES FOR CAMERON Bombay Sea NOS 4 347,594 86,898 2014 States MAKE 7-1/6x5000 PSI,WP(PO.NO.4050008484 PART NO: 2164210-03-70, BONNET REBUILD May KIT, 13-3/10K U BOP PIPE BONNET (EXCEPT United Bombay Air 16 84314390 NOS 1 92,688 92,688 LARGE BORE) WITH QPQ OR CR States Cargo 2014 COMPONENTS (PA PART NO: 2164210-09-70, BONNET REBUILD May KIT, 13-3/10K U BOP LARGE BORE SHEAR United Bombay Air 16 84314390 NOS 1 124,399 124,399 BONNET WITH QPQ OR CR COMPONENTS States Cargo 2014 (PARTS FOR Apr BONNET, REBUILD KIT 20-3/4 IN 3K U BOP United Bombay Air 82059090 NOS 4 283,275 70,819 29 BONNET PARTS WITH QPQ COMPONENTS States Cargo 2014 PARTS FOR ONE BONNET STANDARD TEMP Apr REBUILD KIT, BONNET, 13-15K (OIL FIELD United Nhava Sheva 09 84314390 NOS 4 356,158 89,040 SUPPLIES) States Sea 2014 SUPPLY OF SPARES FOR BOPCAMERON Mar MAKE (PN .4050007969)(BONNET REBUILD United 28 84314390 Bombay Sea NOS 4 373,392 93,348 KIT,13-5/8,3.5,10K U BOP,BONNET PN.644909- States 2014 03-70)