Template Instructions Summary Register Risk Description Inherent Risk Response Plans Residual Risk
Back to Top
General Workbook Instructions
- All fields with an asterisk (*) in the field name are Mandatory and must be populated for each risk.
- Input cells that must be completed in this template are shaded BLUE.
- Calculated fields are shaded GREY. These fields should not be altered.
Back to Top
Summary Register
The 'Summary Register' is an output worksheet that requires no input of data. This worksheet summarises data from the input worksheets into a printable Register format.
Back to Top
Risk Description
This 'Risk Description' Worksheet captures basic project information as well as basic information relating to each risk entry including descriptive information, risk
classification, and risk drivers.
Project details should be populated by the Project Officer prior to the template being provided to Defence Contractors). They should be entered as follows:
The relevant project milestone (note this field only appears in the
Milestone Free Text Summary Register Workbook and will not be uploaded into GEMS). 50% Schematic Design Review
Structured statement of risk usually containing four elements: sources, The availability of materials and equipment caused
Risk Description Free Text events, causes and consequences. by shortage in available steel sections or logistical
delays impacting construction schedule.
Risk Status Drop Down List Open or Closed status of the risk entry. Open
Selection of the High Level SAP Risk Category. Selecting the High Level Risk
High Level Risk Category Drop Down List Category will determine the available Risk Categories available for 8.0 Delivery
selection. For definitions of SAP Risk Categories refer to Defence SAP Risk
Category Definitions.
Risk Category Drop Down List Selection of the relevant SAP Risk Category. For definitions of SAP Risk 8.1.2 Schedule
Categories refer to Defence SAP Risk Category Definitions.
Smart Buyer Risk Selection of the relevant Smart Buyer Risk Category. For definitions of
Category Drop Down List Smart Buyer Risk Categories refer to Smart Buyer Detailed Design. Schedule
Back to Top
Inherent Risk
The 'Inherit Risk' Worksheet details the analysis of risks prior to considering response plans. This Worksheet should be populated as follows:
Impact Category Description of the Impact Category. This should be a short sentence
Description Free Text consisting of 2-10 words. Delay in schedule over 6 months
Back to Top
Response Plans
The Response Plans Worksheet details the Response Plans in place to address each risk. Note: Data for at least one Response Plan must be populated for each risk. Up to
Two Response Plans can be entered in this template. For the purpose of populating this template, if there are more than two Response Plans to a risk these can be entered
as a single Response Plan entry including multiple components. If this option is taken hen the individual Responses should be numbered and separated by a line break (this
is done by pressing ALT+Enter when typing in the cell). The screenshot below shows an example of how this could be done.
Free Text (40 Short title to describe the Response. Should be limited to one short
Response Name character limit) sentence. Procure long lead time equipment
Longer description of the Response and how it drives down the residual Procure long lead time equipment early and issue to
Response Description Free Text risk level. Head Contractor
Reponses Effectiveness: Drop Down List Selection of the appropriate Response effectiveness. For Effectiveness
definitions refer to E&IG Risk Management Framework. Reasonably Effective
Back to Top
Residual Risk
The Residual Risk Worksheet details the analysis of risks with response plans. This Worksheet should be populated as follows:
Residual Probability The probability (likelihood) that the risk eventuates with Response Plans.
Level Drop Down List For Probability Level definitions refer to E&IG Risk Management Unlikely
Framework.
Template Instructions Summary Register Risk Description Inherent Risk Response Plans Residual Risk
Template Instructions Summary Register Risk Description Inherent Risk Response Plans Residual Risk
Template Instructions Summary Register Risk Description Inherent Risk Response Plans Residual Risk
Template Instructions Summary Register Risk Description Inherent Risk Response Plans Residual Risk
Template Instructions Summary Register Risk Description Inherent Risk Response Plans Residual Risk
Risk Title* Risk Description Risk Owner Status High Level Risk Risk Category* Phase Smart Buyer Risk Driver Description* Driver Category* Driver Description Driver Category
Category* Category*
Infrastructure Division - Risk Assessment Template
Guidance Output Input
Template Instructions Summary Register Risk Description Inherent Risk Response Plans Residual Risk
Risk Description Analysis Description Inherent Probability Impact 1 Impact 2 Impact 3 Overall Rating
Inherent Inherent Inherent Inherent
Risk Name Analysis Description Impact Impact Desciption Impact Impact Desciption Impact Inherent Risk
Probability Impact Desciption* Category* Impact Category Impact Category Impact Level
Level* Level* Level Level
Infrastructure Division - Risk Assessment Template
Guidance Output Input
Template Instructions Summary Register Risk Description Inherent Risk Response Plans Resi
Risk Name Description Response Response Type Name Description Owner Response
Response Type* Response Name* Owner* Effectiveness Effectiveness
Infrastructure Division - Risk Assessment Template
Guidance Output Input
Template Instructions Summary Register Risk Description Inherent Risk Response Plans Residual Risk
Risk Description Analysis Description Inherit Probability Impact 1 Impact 2 Impact 3 Overall Rating
Risk Name Analysis Description* Probability Impact* Impact Impact Impact Impact Impact Impact Impact Impact Residual Risk
Level* Category* Level* Category Level Category Level Level
Project Na Project Nu Organisati Risk Name Risk Descri Risk OwnerStatus Risk Categ Smart Buyer Ph
Smart Buyer Ri Driver1 Category1 Driver2 Category2 Inherit AnaInherit Pro Inherit ImpInherit Imp
Inherit Risk
Inherit ImpInherit ImpInherit ImpInherit ImpInherit ImpInherit ImpInherit ImpInherit ImpLevel
Response Plan 1 Organisation
Response PResponse Response PUnit Response PResponse PResponse PResponse Response P
Response Plan 2 Organisation
Unit Response PResponse PResidual AnResidual PrResidual I Residual I Residual ImResidual I
Residual Risk
Residual I Residual ImResidual I Residual I Residual ImResidual I Level
;
Risk Description
Organisation Unit Risk Category
1.1 Program Performance 8.1 Project Management
1.2 Program Assurance 8.1.1 Scope
1.3 National 8.1.2 Schedule
1.4 North 8.1.3 Cost
1.5 West 8.1.4 Project Integration
1.6 South East 8.1.5 Quality
1.7 North East 8.1.6 Resources
1.8 Mediums 8.1.7 Design
5.1 Protected species, community or wetland
5.2 Degradation of land and/or vegetation condition
5.3 Spread or increase of established pest, weed or disease
5.4 Establishment of new pest, weed or disease
5.5 Excessive resource consumption
5.6 Bushfire Hazard
5.7 Pollutant Discharge
5.8 Noise or dust pollution
5.9 Excessive waste production
5.10 Indigenous heritage values
5.11 Natural heritage values
5.12 Historic and built heritage values
5.13 Contaminated Sites
Response Plans
Driver Categories Response Type Response Effectiveness
Budget Avoid Effective
External Influences Accept / Retain Mostly Effective
Government Policies / Procedures Transfer / Share Reasonably Effective
Human Error Treat Negligible
Natural Environment Ineffective
Performance
Personnel / Workforce
Planning
Plant / Equipment Failure
Regulatory
Security
Service Delivery
Inherit and Residual Risk
Probability Level Impact Category Impact Level
Almost Certain Capability Severe
Likely Delivery of Services Major
Possible Environment Moderate
Unlikely Financial Minor
Rare Legislative Compliance Insignificant
Reputation
Safety
Security
Risk Matrix
Insignificant Minor Moderate Major Severe
Almost Certain Low Medium High Very High Very High
Likely Low Medium High High Very High
Possible Low Medium Medium High High
Unlikely Low Low Medium Medium High
Rare Low Low Low Medium Medium
Smart Buyer Risk Categories
Phase Phase Risk Category
Acquisition Acquisition Commercial
Sustainment Acquisition Defence Integration
Acquisition Financial
Acquisition Project Integration
Acquisition Requirements
Acquisition Schedule
Acquisition Strategic
Acquisition Technology
Sustainment Commercial
Sustainment Financial
Sustainment Fundamental Inputs to Capability
Sustainment In-Service Requirements
Sustainment Obsolescence
Sustainment Operational
Sustainment Strategic
Risk Category
High Level
1.0 Business
2.0 Stakeholder Management
4.0 Engineering Integrity
5.0 Environment and Sustainability Management
6.0 Special Interest
7.0 Commercial
8.0 Delivery
Risk Category
High Level
1.0 Business
1.0 Business
1.0 Business
1.0 Business
1.0 Business
1.0 Business
1.0 Business
1.0 Business
2.0 Stakeholder Management
2.0 Stakeholder Management
2.0 Stakeholder Management
2.0 Stakeholder Management
2.0 Stakeholder Management
2.0 Stakeholder Management
2.0 Stakeholder Management
2.0 Stakeholder Management
2.0 Stakeholder Management
2.0 Stakeholder Management
2.0 Stakeholder Management
2.0 Stakeholder Management
4.0 Engineering Integrity
4.0 Engineering Integrity
4.0 Engineering Integrity
4.0 Engineering Integrity
4.0 Engineering Integrity
4.0 Engineering Integrity
4.0 Engineering Integrity
4.0 Engineering Integrity
4.0 Engineering Integrity
5.0 Environment and Sustainability Management
5.0 Environment and Sustainability Management
5.0 Environment and Sustainability Management
5.0 Environment and Sustainability Management
5.0 Environment and Sustainability Management
5.0 Environment and Sustainability Management
5.0 Environment and Sustainability Management
5.0 Environment and Sustainability Management
5.0 Environment and Sustainability Management
5.0 Environment and Sustainability Management
5.0 Environment and Sustainability Management
5.0 Environment and Sustainability Management
5.0 Environment and Sustainability Management
6.0 Special Interest
6.0 Special Interest
6.0 Special Interest
6.0 Special Interest
6.0 Special Interest
7.0 Commercial
7.0 Commercial
7.0 Commercial
8.0 Delivery
8.0 Delivery
8.0 Delivery
8.0 Delivery
8.0 Delivery
8.0 Delivery
8.0 Delivery
8.0 Delivery
8.0 Delivery
Risk Category Branch
1.1 Business Strategy Capital Facilities and Infrastructure
1.2 Technology Environment and Engineering
1.3 Operations and Business Processes Estate Planning
1.4 People & Workforce Property Management
1.5 Policy PFAS Taskforce
1.6 Legislative Compliance
1.7 Business Integration
1.8 Financial
2.1 Internal Stakeholders
2.2 External Stakeholders
2.2.1 Whole of Government
2.2.2 State Governments
2.2.3 Industry
2.2.4 Community Groups
2.2.5 Other
2.3 Communications
2.4 Community Impacts
2.4.1 Health
2.4.2 Infrastructure
2.4.3 Commercial
4.1 Range Design and Compliance
4.2 Electrical Infrastructure
4.3 Airfield Lighting
4.4 Aircraft Pavements
4.5 Fire Protection Engineering and Fire Safety
4.6 Emergency Power
4.7 Mechanical Services
4.8 Electrical Services
4.9 Other engineering services
5.1 Protected Species, Community or Wetland
5.2 Degradation of Land and/or Vegetation Condition
5.3 Established Pest, Weed, Disease
5.4 New Pest, Weed, Disease
5.5 Excessive Resource Consumption
5.6 Bushfire Hazard
5.7 Pollutant Discharge
5.8 Noise or Dust Pollution
5.9 Waste
5.10 Indigenous Heritage
5.11 Natural Heritage
5.12 Historic & Built Heritage
5.13 Contaminated Sites
6.1 Exploration
6.2 Mining
6.3 Foreign Investment Review Board (FIRB)
6.4 Native Title
6.5 Offshore Petroleum
7.1 Procurement
7.2 Contract Management
7.3 Industry Capacity & Supplier Viability
8.1 Project Management
8.1.1 Scope
8.1.2 Schedule
8.1.3 Cost
8.1.4 Project Integration
8.1.5 Quality
8.1.6 Resources
8.1.7 Design
8.2 Strategic Estate Risk
Organisation Unit
Branch
Capital Facilities and Infrastructure
Capital Facilities and Infrastructure
Capital Facilities and Infrastructure
Capital Facilities and Infrastructure
Capital Facilities and Infrastructure
Capital Facilities and Infrastructure
Capital Facilities and Infrastructure
Capital Facilities and Infrastructure
Environment and Engineering
Environment and Engineering
Environment and Engineering
Environment and Engineering
Environment and Engineering
Estate Planning
Estate Planning
Estate Planning
Estate Planning
Estate Planning
Estate Planning
Estate Planning
Property Management
Property Management
Property Management
Property Management
Property Management
Property Management
PFAS Taskforce
PFAS Taskforce
PFAS Taskforce
PFAS Taskforce
Organisation Unit
Directorate
Program Performance
Program Assurance
National
North
West
South East
North East
Mediums
Estate Engineering Policy
Energy Efficiency, Environment, Resource Management and Sustainability
Environmental Remediation Programs
Environment and Heritage Policy Development
Environmental Protection and Assessments
Estate Strategic and Investment Planning
National New Capability
Regional - South/Central/West/ACT
Estate Projects Development
Regional Planning - East
Land Planning & Regulation
Business Improvement and Report
Property Acquisitions, Mining and Native Title
Property Disposals
ACT Office Accommodation
Space Management
Expenditure Leasing
Property Leasing
Policy
Communications / Engagement
Program Management and Governance
Environmental Activities